Emergency Findings
Particular Location Remarks
1
2
3
4
5
6
7
8
9 Information Systems
Group:
Preventive maintenance
Compliance REMARKS
Regulations / Standards
Particulars (specifiy locations and Eqpt. ID; separate
Reference Y N n.a. with comma)
GENERAL Risk
Do you monitor the operating parameters of your equipment? ISO 9001:2008 6.3.a
Are the contents of your equipment folder complete and accurate? ISO 9001:2008 4.2.3 / 4.2.4
Do you regularly monitor the status of your equipment? ISO 9001:2008 6.3.a
C | R Equipment Folder Data Sheet
⃘ Equipment Folder Record Update
⃘ Daily Equipment Inspection Form
⃘ Utilities Meter Reading (Electrical) Forms
⃘ Utilities Meter Reading (Water) Forms
⃘ Utilities Meter Reading (LPG) Forms
⃘ Motors & Pumps Preventive Maintenance Checklist
⃘ Generator Load Testing
⃘ Generator No-Load Test Inspection Checklist
⃘ Hourly Genset Monitoring Form
⃘ Chiller Monitoring Form
ISO 9001:2008 4.2.3-
⃘ Air Handling & Fan Coil Unit PM Checklist
4/OHSAS 18001:2007 4.4.5
⃘ Package Unit Preventive Maintenance Checklist
⃘ Single Package Unit PM Checklist
⃘ Low Voltage Switchgear Inspection Form
⃘ Equipment Calibration Form
⃘ ⃘ Daily Construction Monitoring Form
⃘ ⃘ Cooling Tower Inspection Form
⃘ ⃘ Deepwell Preventive Maintenance Checklist
⃘ ⃘ Fire Pump Preventive Maintenance Checklist
⃘ ⃘ Jockey Pump Preventive Maintenance Checklist
⃘ ⃘ Fans & Blowers Preventive Maintenance Checklist
Are the operation manual for all critical equipment completely filed?
Is there an updated service report from a third-party maintenance
ISO 9001:2008 6.3.a
service provider on the following:
I. REMARKS
Y N n.a. (specifiy locations and Eqpt. ID; separate with
ELECTRICAL SYSTEM comma)
3.1 Generator
3.1.1 Generator Engine
Properly installed with clearances to walls and adjacent genset
ISO 9001:2008 6.3.a
units
Is the genset room provided with adequate sound proofing? ISO 9001:2008 6.3.a
3.1.2 Cooling System (air/ water cooled)
Is there coolant gauge working? ISO 9001:2008 6.3.a
Is there a regular coolant level monitoring? ISO 9001:2008 6.3.a
3.1.3 Generator battery
ISO 9001:2008 7.2.1C / ISO
with back-up battery and double throw switch 9001:2008 6.3.a
date of installation tag / expiration tag ISO 9001:2008 6.3.a
3.2 CAPACITOR
3.2.1 Capacitor Bank
ISO 9001:2008 6.3.a / OSHS
Is your Power Factor above 85%? Rule 1211 / PEC
ISO 9001:2008 6.3.a / OSHS
Are all the capacitors working? Rule 1211 / PEC
3.3 SWITCHGEAR
3.3.1 Load Break
OHSAS 18001:2007/OSHS
Rule 1211 / PEC Chapter 3
Is the ground matting available ? (research) ART. 3.0.1.6
OHSAS 18001:2007/OSHS
Rule 1211 / PEC Chapter 3
Is the ground matting connected to ground line? ART. 3.0.1.6
3.3.2 ATS / MTS
Automatic transfer capability within a period of 11 seconds or as OHSAS 18001:2007/OSHS
per approved design. Rule 1211 / PEC
3.3.3 Area the following practices being complied?
OHSAS 18001:2007/OSHS
Switchgear Preventive Maintenance
Rule 1211 / PEC
ATS Operation Idiot Proofing OHSAS 18001:2007 4.4.6
Hourly Main LVSG reading ISO 9001:2008 6.3.a
3.4 TRANSFORMER
3.4.1 Main Transformer
OHSAS 18001:2007/OSHS
Using the main electric bill, is actual load over the design load? Rule 1211 / PEC
OHSAS 18001:2007/OSHS
Is GMBD underutilitized? Rule 1211 / PEC
Properly installed with clearances to walls and adjacent genset
ISO 9001:2008 6.3.a
units
Is the actual load below 80% transformer rating? ISO 9001:2008 6.3.a
Is the temperature within safe limit? ISO 9001:2008 6.3.a
3.4.2 Area the following practices being complied?
ISO 9001:2008 6.3.a/OSHS
Transformers Preventive Maintenance Rule 1211 / PEC
ISO 9001:2008 6.3.a/OSHS
Transformer Oil Analysis Rule 1211 / PEC
3.6 MOTORS
3.6.1
ISO 9001:2008 6.3.a
3.6.2 Area the following practices being complied?
Megger Testing / Analysis ISO 9001:2008 6.3.a
3.7 MOTOR CONTROL CENTER
3.7.1 Motor Control
With markings for proper identification OSHS Rule 1060.01.1
Functional monitoring gauges ISO 9001:2008 6.3.a
3.7.2 Area the following practices being complied?
Equipment MCC Re-tightening ISO 9001:2008 6.3.a
3.8 METERS
3.8.1 Electrical Meters
OHSAS 18001:2007/OSHS
With markings for proper identification Rule 1211 / PEC
OHSAS 18001:2007/OSHS
Direct metering for each merchant/tenant Rule 1211 / PEC
OHSAS 18001:2007/OSHS
Sub meters easily accessible and secured location Rule 1211 / PEC
3.8.2 BUS DUCT SYSTEM
OHSAS 18001:2007/OSHS
Bus duct tapped with a bolted type circuit breaker device. Rule 1211 / PEC
Bus duct, plug-in device transformer and bus bar gutter located in OHSAS 18001:2007/OSHS
typical floor EE rooms. Rule 1211 / PEC
Bus duct provided with protection against water leaks ISO 9001:2008 6.3.a
RA 9514 Rule 10 Chapter 6
Bus duct provided with fire stop on floor/wall penetration Division 6. Section 10.2.6.2F
4.0 OTHERS
4.0.1 Substation
Is it equipped with sufficient Ventilation 18001:4.3.2 RA 7920
Is there an existing water pipe line inside EE room?
Sufficient lighting(conforms to standard lux rating) OSHS Rule 1075
Area the following practices being complied?
Is it equip with sufficient and accurate PPE's? OSHS Rule 1080
Thermographic Inspection 18001:4.3.2 RA 7920
Proper conduit installation with sufficient pipe supports) ISO 9001:2008 6.3.a
4.0.2 Substation Fire Protection System
Is there a wheeled-type dry chemical/ clean agent fire extinguisher
available? RA 9514, NFPA 10
Is there enough smoke detector installed? (1 sd: 4.5mts. Radius) RA 9514, NFPA 72
Is there a working emergency light installed? RA 9514, NFPA 101
4.0.3 Grounding System 18001:4.3.2 RA 7920
Are all panel boards/equipments are properly grounded? 18001:4.3.2 RA 7920
II. FIRE AND LIFE SAFETY SYSTEM Regulations / Standards Compliance REMARKS
(specifiy locations and Eqpt. ID; separate with
2.1 Jockey and Fire Pumps Reference Y N n.a. comma)
2.1.1 Fire Pump is UL Listed? RA 9514, NFPA 20
2.1.2 Fire Pump control panel is on Auto mode? RA 9514, NFPA 20
2.1.3 Jockey Pump control panel is on Auto mode? RA 9514, NFPA 20
2.1.4 No trouble/fault/alarm noted on the pump's control panel? RA 9514, NFPA 20
Fuel level of diesel fire pump is adequate (2/3 of tank full volume
2.1.5 capacity)? RA 9514, NFPA 20
2.1.6 Fire Tank water level of is full? RA 9514, NFPA 20
2.1.7 Valves are open (for "Normally Open" valves)? RA 9514, NFPA 20
2.1.8 Valves are closed (for "Normally Closed" valves) RA 9514, NFPA 20
System pressure is same as stated on the posted sequence of operation
2.1.9 "System Pressure"? RA 9514, NFPA 20
2.1.10 With Operating Guidelines on pump operation? RA 9514, NFPA 20
Properly automatic cut-in and cut-out sequence (max. 10 psi
2.1.11 increment)? RA 9514, NFPA 25
2.2 Fire Detection and Alarm System (FDAS)
2.2.1 FACP control panel is on Auto mode? RA 9514, NFPA 72
2.2.2 No trouble/fault/alarm noted on the FDAS control panel? RA 9514, NFPA 72
2.2.3 Fire Sprinkler Monitoring System Integrated at FDAS? RA 9514, NFPA 72
2.2.4 Proper location of FACP? (manned 24x7)? RA 9514, NFPA 72
Properly positioned smoke/heat detectors (e.g. highest point of the
2.2.5 ceiling, etc…)? RA 9514, NFPA 72
Adequate number of SD/HD installed in the area? (SD/HD must be 4.6m
2.2.6 max. radius coverage) RA 9514, NFPA 72
Clear of obstruction on the detector unit (e.g. SD cap, plastic, masking
2.2.7 tape, etc..) RA 9514, NFPA 72
2.2.8 Good condition of SD/HD unit (e.g. not dismantled on mounting) RA 9514, NFPA 72
2.2.9 Adequate spare SD/HD available? RA 9514, NFPA 13
2.3 Sprinkler System
Properly installed sprinkler heads (upright for bare slab, pendent for
2.3.1 drop ceiling) RA 9514, NFPA 13
2.3.2 Unobstructed installed sprinkler heads RA 9514, NFPA 13
2.3.3 No paint on sprinkler head and escutheon plate? RA 9514, NFPA 13
Adequate spare sprinkler heads available with sprinkler head wrench?
2.3.4 (min. of six (6) sprinkler heads per type) RA 9514, NFPA 25
2.3.5 All Control Valves are Tamper Proof (chained or plastic strapped) RA 9514, NFPA 25
2.3.6 All control valves and sprinkler mains have tamper and flow switches RA 9514, NFPA 25
2.4 Special Fire Suppression Systems (e.g. FM200, FE13, etc...)
RA 9514, NFPA 2001, NFPA
2.4.1 No trouble/fault/alarm noted on the control panel? 17A
RA 9514, NFPA 2001, NFPA
2.4.2 All system appurtenances are in good condition? 17A
2.5 Portable Fire Extinguishers (PFE)
2.5.1 Proper selection of deployed PFE according to fire class to be protected
RA 9514, NFPA 10
PFE in its designated place (with PFE locator sign, hanged or on a
2.5.2
pedestal) RA 9514, NFPA 10
2.5.3 Free of obstruction to access or visibility RA 9514, NFPA 10
2.5.4 Operating instructions on nameplate legible and facing outward RA 9514, NFPA 10
2.5.5 Safety/tamper seals are not broken or missing RA 9514, NFPA 10
2.5.6 Fullness determined by weighing or “hefting” RA 9514, NFPA 10
No sign of caking/packing of extinguishing agent (lift the PFE upside
2.5.7 down)
*note: for DRY CHEMICAL PFE's RA 9514, NFPA 10
No obvious physical damage, corrosion, leakage, broken hose or
2.5.8 RA 9514, NFPA 10
clogged nozzle observed
Pressure gauge reading or indicator in the operable range or position
2.5.9
(GREEN) RA 9514, NFPA 10
2.15.9 Are all pipe chase properly sealed with fire rated material ISO 18001:4.3.2 PD 1185
2.15.13 Area the following practices being complied?
DAILY
First Brigade Checklist
A. First Shift
B. Second Shift
Dry run of Emergency Brigade Team
Fire Pump Equipment Inspection
Hot Work permit (inspect actual site)
Reporting of FACP/Sprinkler Pump sytem status
Tenant Cleaning of Kitchen Hood/ Filters
Update Emergency Brigade Team (Posted at Info. Center )
WEEKLY
Update weekly roster
Update weekly directory (Emergency)
Problem Reporting Chart (Escalation)
Contractor's Directory
Tenant's Directory
2.12 Environment
2.12.1 Is there sufficient spill dike? OSHS Rule 1945.04
2.12.2 Is there a drain located within the spill dike? OSHS Rule 1945.04
III. REMARKS
Regulations / Standards Y N n.a. (specifiy locations and Eqpt. ID; separate with
MECHANICAL SYSTEM Reference comma)
Do you have Preventive Maintenance Program on the following? Is everything in normal working condition?
3.9.1 Does you PAU system have the following safety sensors and switches installed?
Duct Temperature Sensor
Air Sensing Switch
Differential Pressure Switch
Ch Water Supply Temp Sensor ISO 9001:2008 6.3.a
Ch Water Return Temp Sensor
PAU Start/Stop Control
PAU CHW Valve Modulation
3.10 Single Packaged Units
3.9.1 Do you have Preventive Maintenance Program on the following? Is everything in normal working condition?
SPU condenser coils
SPU condenser Valves
Pressure Gauges ISO 9001:2008 6.3.a
Temperature Gauges
BMS Connections / Monitoring
3.11 Fan System
Does your system have Individual VAV fans control devices to make fan ISO 9001:2008 6.3.a
motor operate efficiently ?
3.12 Gondola
Is the Permit to Operate updated? OHSAS Rule 1222.04
Is the electric motor operating normally? ISO 9001:2008 6.3.a
Are there safety harness provided? OHSAS Rule 1080
Is the operating instruction posted? 9001:4.2.4
Are there signs of damage to the pulley system? ISO 9001:2008 6.3.a
Are there signs of damage to the ropes? ISO 9001:2008 6.3.a Information Systems Group:
Are there signs of oil leak? ISO 9001:2008 6.3.a Preventive maintenance
Are there signs of damage to the railings? ISO 9001:2008 6.3.a
3.13 Elevator
Elevator (Operations)
Check if Permit to Operate is updated ISO 9001:2008 4.2.4
Check Equipment Data Folder is filled in ISO 9001:2008 4.2.4
Check Regular PM reports if compiled in green folder ISO 9001:2008 4.2.4
Check Trouble Reports is compiled in blue folder ISO 9001:2008 4.2.4
Check if ERT is identified and certified ISO 9001:2008 6.2.2
Check last 12th months SLA rating is compiled ISO 9001:2008 4.2.4
Check last 12th Months Monthly Elevator Inspection checklist is compiled ISO 9001:2008 4.2.4
Elevator Car
Check the car lighting. (200 lux on floor level) ISO 9001:2008 6.3.a
Check the car interior. (There must be no signs of vandalism) ISO 9001:2008 6.3.a
Test Emergency light functionality (20 lux level on all areas ) ISO 9001:2008 6.3.a
Check operation of remote / local alarm system. (Must be audible from ISO 9001:2008 6.3.a
the landing doors)
Check condition of car fan (there must be no vibration / noise) ISO 9001:2008 6.3.a
Check operation of Intercom ISO 9001:2008 6.3.a
Check for heavy vibration or noise on normal run ISO 9001:2008 6.3.a
Car door / Safety ISO 9001:2008 6.3.a
Check door operation ISO 9001:2008 6.3.a
Test function of door sensor, photocell or safety edge. ISO 9001:2008 6.3.a
Check condition of car door panels and guide shoes. ISO 9001:2008 6.3.a
Machine Room
Machine room must be locked and Emergency Rescue Procedure posted ISO 9001:2008 6.3.a
IV. REMARKS
Y N n.a. (specifiy locations and Eqpt. ID; separate with
CIVIL WORKS comma)
4.1 Foundation
Is there no marks of damage or cracks? ISO 9001:2008 6.3.a
4.2 Column
Is there no marks of damage or cracks? ISO 9001:2008 6.3.a
4.3 Wall
Is there no marks of damage or cracks? ISO 9001:2008 6.3.a
4.4 Water proofing
Is there no marks of damage or cracks? ISO 9001:2008 6.3.a
Are the following areas water proofed?
Windows ISO 9001:2008 6.3.a
Bathrooms ISO 9001:2008 6.3.a
AHU Rooms Floors ISO 9001:2008 6.3.a
4.5 Roof
Is there no marks of damage or cracks? ISO 9001:2008 6.3.a
With sufficient water proofing material? ISO 9001:2008 6.3.a
Will the design withstand normal load, typhoons and strong winds in
addition to normal weather conditions and where required to carry
suspended loads OHSAS RULE 1061
Are gates for pedestrian traffic located at a safe distance from those
for vehicular and railroad traffic, and have sufficient width to permit
the free passage of employees during rush hours?
OHSAS RULE 1069.04
5.4 Seismic Gap
Is there no marks of damage or cracks? ISO 9001:2008 6.3.a
Is there no marks of water leak? ISO 9001:2008 6.3.a
Date: ______________________
Ayala Property MECHANICAL INSPECTION CHECKLIST
Management TSD-F-06-05.8
Corporation
BMS Capable
Satisfactory
- budget next year
Spare Unit
- budget 2 to 5 years FULLY
Defective
Defective
Remarks
Remarks
Quantity
- budget 5 to 10 years OPERATIONAL
NOT FULLY OPERATIONAL
Critical
Good
Good
NOT OPERATIONAL
COOLING TOWER AIR HANDLING UNITS
SAMPLE QUANTITY: AIR HANDLING UNITS (AHU) out of 23 FCU On/Off Status
SAMPLE QUANTITY: FAN COIL UNITS (CHILLED DISTRIBUTION LOOP) out of 32 Air Sensing Switch
35 FCU Cooling coils 33 SAF Start/Stop Control
Contractor/ In-house
Spare Sensor Unit
Frequency/ Year
Does not Apply
Satisfactory
Defective
Defective
Remarks
Good
ITEM ITEM
CHILLERS
14 Duct Cleaning 28
15 29
16 30
GENERAL REMARKS
1 11
2 12
3 13
4 14
5 15
6 16
7 17
8 18
9 19
10 20
Page 2 of 2
AYALA FIRE SAFETY COMPLIANCE FORM
PROPERTY FORM NO: TSG-F-08-02.7
MANAGEMENT
CORPORATION
Total Quantity
Total Quantity
Total Quantity
Total Quantity
Total Quantity
Total Quantity
2 - within 3 month Tenant Fire Safety Inspection (w Hood)
3 - within 12 month 14
4 - budget next year
5 - budget 2 to 5 years 15 Common Area Fire Safety Inspection
6 - budget 5 to 10 years
16 Fire Brigade Drill Inspection
EQUIPMENTS 17 Check-up testing of FDAS
1 Fire Pump 18 Review of Building fire plan
32 ANNUALLY
1 - immediate fix
2 - within 3 month 33 Annual FireDepartment Certificate.
Does not Apply
3 - within 12 month
Total Quantity
5 - budget 2 to 5 years
Defective
Remarks
FIRE PUMP / JOCKEY PUMP 37 First Aid Seminar for Brigade Team
1 Pump On/Off Status 38 Christmas Décor Fire Safety Inspctn
A. First Shift 4
B. Second Shift 5
12 Tenant's Directory 17
AYALA ELECTRICAL INSPECTION CHECKLIST
PROPERTY FORM NO: TSG-F-08-02.9
MANAGEMENT
CORPORATION
NOT APPLICABLE
- immediate fix
- within 3 month APPLICABLE BUT NO BMS
Satisfactory
Spare Unit
Spare Unit
- budget 2 to 5 years FULLY OPERATIONAL
Defective
Defective
Remarks
Remarks
Quantity
Quantity
- budget 5 to 10 years
Critical
NOT FULLY OPERATIONAL
Good
Good
NOT OPERATIONAL
SUBSTATION GENERATOR
16 ATS / MTS 12
18 Generator Exhaust
Locations:
N/A Compliance Frequency Contractor
Satisfactory
Spare Unit
Defective
Remarks
Quantity
25 Equipment Breakers
3
PROTECTION SYSTEMS 4
STOCKS PROFILE
Total Capacity Running Cnsmptn Present Capacity
Item Particular Location Remarks
Volume Hours Vol / hr Hours Volume Hours
2 Timers
Sensors
3 (Light, Water, Switch)
Relamping
4 (Conversion of Existing
Fixture to lower wattage)
5 Maxilum Reflectors
6 Electronic Ballast
7 Capacitor Banks
Reduction of Lighting
14 Operating Hours
Monitoring of Equipment
19 Operation
Weekly Genset No Load Test For system reliability and minimize genset
10 failures
Monthly Genset Load Testing For system reliability and minimize genset
11 failures
HVAC SYSTEM OPERATION AND MAINTENANCE
Present Condition
Item Particular Partial Benefits/Remarks PM Target Implementation
Fully Implemented Not Practiced
Implementation
Daily Equipment
11 Checking/inspections
For system reliability/Enercon monitoring
OSHS, National Building Code, and To serve as guide in making all regular activities
17 Fire Code Reference Books in conformance to Technical Codes
Daily Texting of Security Officer on To regularly inform PM/BE on the status of the
18 Building/Supply Status building