Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Point of ○ Run CPU ● DI2, DS4

TCD -040 INV S/W OC Application


Detection ● Speed CPU ● DI4,5

[Meaning] [Actions to take]


When the value that is obtained by converting the current detected by INV into A/D
exceeds specified limit. [DI2 EL]
1. Verify if HCT cable is connected to HCT.
[Diagram]
리액터
Reactor HCT INV STACK 2. Verify if HCT cable is correctly connected
U

IM V according to each phase(U, V-phase).


W 3. Verify if HCT cable is connected to VB of DPC-1XX PCB.
DSP - TMS320C31 4. Check motor and HCT SPEC.

Lus Value is above certain portion


INV SW OC [DI4,5 EL]
VBN-3
A/D 1. Verify if HCT cable is connected to HCT.
Converter Lvs Value is above certain portion
VBN-7 INV SW OC 2. Verify if HCT cable is correctly connected
AD7891AS
according to each phase(U, V, W-phase).
VBN-11 Lws Value is above certain portion
INV SW OC 3. Verify if HCT cable is connected to VBN of DPC-300 PCB.
4. Check motor and HCT SPEC.

DPC-300
or DPC-310 [DS4 EL]

Caution : There’s no W-phase HCT for 120-150 m/min. 1. Verify if HCT cable is connected to HCT.
For 120-150 m/min, VBN connector is VB. 2. Verify if HCT cable is correctly connected
according to each phase(U, V, W-phase).
3. Verify if HCT cable is connected to VBN of DPC-310 PCB.
4. Check motor and HCT SPEC.
5. Check the encoder is et to marked point on TM
6. Replace DPC-310 PCB

You might also like