Ver. No. Date Description Page No Rationale for the change Change type
(Add/ Modify/
Delete)
3.0 01 Jun 2010 First Release All
Review Details
Approval Details
Table of Contents
2 SCOPE
This Admin Manual is applicable to all functions of Marlabs India (Bangalore and Mysore) like:
GDIC
Professional Service
Training Services
3 PROCESS STAKEHOLDERS
Following are the stakeholders along with their responsibilities:
SL Stakeholder Responsibilities
No.
1. Admin Manager To establish and maintain the Admin Manual for Marlabs India
Operations
2. Purchase Manager To comply to the Admin Manual as applicable
3. Finance Manager To comply to the Admin Manual as applicable
4. ITS Manager To comply to the Admin Manual as applicable
5. General HR To comply to the Admin Manual as applicable
6. Talent Acquisition To comply to the Admin Manual as applicable
7. Training Function To comply to the Admin Manual as applicable
8. Senior Management To comply to the Admin Manual as applicable
9. Project Manager To comply to the Admin Manual as applicable
10. PQMG To comply to the Admin Manual as applicable
O
I
Admin Service
Process
MS-I-ADMIN-AS-DOC-01
5 FLOW CHART
START
Adminservice
Request
Necessary
approval is taken
from respective
department head
Execution of
request , as per
Admin Manager's
advice
If related to N If related to
repair and
procurement
Maintenance
Place an order
Co-ordinate with
vendor
Co-ordinate with
Vendor for
delivery
Effective closure
of the issue
6 PHYSICAL SECURITY
Security Incidents:
It is desirous to avert any security incidents to safeguard the men & materials of the company. The
incident free atmosphere builds the confidence of the employee and helps in productivity of the
company apart from progress of the wellbeing of its employees.
Incident Reporting:
Reporting of an incident is an essential element in any security program. The timely reporting of
thefts, losses, or damage of property and the tampering or unauthorized disclosure of information is
important. A timely report increases the possibility of recovering the property, minimizing damage,
and apprehending the perpetuator.
Recording of Incidents:
It is important to record all the security incidents as to:
(a) MARLABS understands the sensitivity of the information security and formed email group where all
the functional heads and relevant stakeholders are included in the group
(b) Incidents should be reported through security-incidents@marlabs.com
(c) Overcome the repetitive issues
(d) To analyze and to take pro-active measures to avert the same.
(e) Lessons to be learnt for incident free operation.
Therefore, the security officer to inform & record all the security incidents in a register kept for the purpose
and to put up the same to the Admin department for the review and further action.
Details of Recording of Incidents :
The ingredients that are essential to record incidents are listed here under:
Incident Date/Time
Work location/site
Type of incident
Description
Action taken details
On evaluation of such incidents by the management of the company, appropriate measures will be taken to
curb such incidents.
Evaluation of Security Incidents:
Analyze and establish the cause of the incident and take any necessary steps to prevent
recurrence
Report to all affected parties and maintain communication and confidentiality throughout
investigation of the incident
Identify problems caused as a result of the incident and to prevent or reduce further impact
Ensure all system logs and records are securely maintained and available to authorized
personnel when required
ensure only authorized personnel have access to systems and data
ensure all documentation and notes are accurately maintained and recorded in the register and
made available to relevant authorized personnel
ensure all authorized corrective and preventative measures are implemented and monitored for
effectiveness
Introduction
The environmental risk applies to act of God, natural or manmade disaster such as fire or flood. It is
important to assess before deciding where to site equipment, particularly if it is critical to the operation of the
unit. The frequency of flooding in the past, for example, can be used to help with such risks assessments.
Where the risk is substantial, appropriate protection should be offered. This could be providing other,
failover systems to introduce redundancy, physical protection, or deciding on alternative locations. Systems
should also have proper ventilation if in areas that reach high temperatures such as servers/switches that
get especially hot during the summer season. Adequate cooling in these situations are essential, including
periodic reviews to address the same.
The critical equipment’s such as UPS, Air-Conditions are to be well protected and to kept in serviceable
condition at all times to run the business of the company and to ensure comfort of the employees.
The working environments are also to be well protected by time to time maintenance and periodical
servicing.
Health and comfort of an employee is very important and hence, no compromise on ensuring service levels
of these components.
Protection of wires & cables are also very vital in order to ensure environmental safety & security.
Measure to upkeep the environments:
To ensure serviceability condition at all times
To enter in to AMC’s wherever applicable
Well securing of wires/cables to protect from damage or to lead to an incident
Proper signage’s and cautionary notes wherever applicable
Continues training & awareness
To ensure proper ergonomics as not to affect health of employees.
7 ACCESS CONTROL
Introduction :
Access control plays a pivot role in the domain of physical and information security . It is the selective
restriction of access to a location. In the real sense, access means consuming, entering or using and a
measure to regulate the same is the controlling system. Locks and logins credentials are two analogous
mechanism of access control.
Employees who lost their access card are being issued with a new access card by blocking the lost card by
the employee. Employees who forget to bring the access card are being issued with a temporary access
card on day today basis on verifying their credentials and whose details are recorded in a register kept for
the purpose. Also, these details are being configured in HRIS to record their attendance.
The list of employees /support staff /electricians who are permitted to seek entry to the data center is
maintained separately.
The list of IT team who are expected to work with in the data center is being forwarded to Admin team by
the Manager / HOD of IT department for configuring their finger prints for seeking an entry in to the data
center.
8 ADMIN HELPDESK
Admin Services Helpdesk works on all working days between 9.30am to 6.30pm. All individuals go
on regular rounds on daily basis and ensure all equipments are in working condition, they check on
housekeeping activities (cleanliness of office). All the observations are explained to respective
people and the same will be monitored. Repair and maintenance related issue if any, it will be
escalated to the Admin Manager and the same will be registered in the Admin Services Register
and followed up for rectification.
All request/issues related to admin department will reach helpdesk email ID or through request
form. On emergency / query / issues, employees can call Admin team over Tele extension. The
same will be registered in Admin Services Report MS-ADMIN-ASR-REC-01 for execution after
approval from the respective authorities.
Helpdesk Details:
Bangalore office:
Landline: 67229415 /416/427 & 428
Email: helpdesk.admin@marlabs.com
Mysore Office:
Landline: 0821 - 4000200
Email: helpdesk.admin@marlabs.com
Scope:
Responsibility:
It is the responsibility of the Administrative Manager with delegation of responsibilities to admin staff to
follow the activities as defined hereunder.
Purchase Process:
Purchase process comprises of both purchase of goods and services.
Any purchase beyond the value of Rs.3,000/- should go through the purchase order process
(Viz., 3 bid quote; comparison; negotiation ; selection)
Any purchase less than Rs.3000/- need not go through the PO process.
Purchases Less than 1 Lakh can be approved by Business Head’s within India.
Purchases greater than 1 lakh has to be approved by Finance Committee.
Vendor Selection:
A purchase committee has been formed comprising representatives (Manager Level) Admin
/Finance who will negotiate the price subject to the cost exceeds to Rs 35,000/- and above.
Less than Rs. 35,000/- worth can be dealt by the department for which Business Head’s
approval is a must.
For any purchase minimum of 3 different quotes from 3 different vendors has to be obtained in
order to ascertain cost effectiveness / Service / strength or stability of Vendor.
A comparative statement along with Cost Benefit Analysis is made and the same is put forward
to the internal purchase committee and the date is fixed for final negotiation with each vendor to
explore the best product, service, and price.
Procedure:
Upon the receipt of the quotations / proposals from various vendors, Admin will do a
comparative report that covers costs, time to deliver, quality, after service, and any other
specifically mentioned parameters.
In the event it is not possible to get the quotations / proposals from 3 vendors, this exception
has to be approved by the Requestor, Admin, and Finance.
Vendor (s) will be selected and notified accordingly.
Purchase Order (in triplicate) will be prepared, reviewed, approved, and dispatched to the
selected vendor (s).
Receipt of Materials:
On receipt of the materials, Security / Front office executive receives the material and the
same is delivered to the concerned users who will certify for the technical authentication and
functionality of the product. This certification is kept safe by EAF for his/her records and a copy
of the same is generated and the same is enclosed to the Invoice/bill that accompanies the
product and the Invoice/Bill is signed for approval by Divisional Heads and subsequently the
same is handed over to the Finance Department to process for the payment as per PO terms.
Finance department will process payment for the vendor as per the PO terms and hand over
the cheque on or scheduled date of payment to EAF to release the same to vendor on time.
Administration manager ensures the activities are carried out as per the terms and conditions
fixed in PO. If there is any deviation in the process, Admin Manager ensures to fix proper
justification to such deviation on records.
Purpose:
The system embarks continuous supply with cost and estimation under control.
Also, ensures to keep essential stock in custody to ensure smooth functioning.
Office Stationery:
All kinds of office stationery is maintained in stock by , the same will be issued by Front Office coordinator
OR Security Officer / Security Supervisor and the same will be entered in stationery issue register.
The same shall be procured and delivered to the individual projects/teams by the 1 of every
st
month by Administration department, to the individual who is accountable for stationary from
project side.
Any specialized /customized stationery required by the Project/team should be initiated by
project/team by giving minimum 7 working days advance notice to EAF with clear
specification/drawings (if any), including vendor preference if any and also brand preference.
Other normal stationeries like pen, pencil, eraser, whitener, scribbling pads, scale, files etc., will
be stocked and stored by Administration and will be supplied to the individuals after recording
Printed Stationery:
All kinds of printed Corporate Stationery are maintained and the stationery issued to employees
by Admin Executive. (Letterheads, Continuation Sheets, Envelops). Visiting Cards request will
be processed after approval from respective PM. Other printing jobs will be processed as per
request and approval from respective HOD’s
The printing matters should be specified legibly and clearly on the application or as a printed
attachment to the application should be submitted to EAF giving minimum 5 working days lead
time to execute the works. Additional time depending on the nature of printing will be required
for any specialized printing.
After request, the proof of the printed matter will be submitted to the Project/team within
36hours. And the same has to be approved by the user department for print. Only on approval
by the user department, the printing would be ordered for printing by EAF.
Photocopier:
The Office is provided with photocopiers at different locations. Maintaining of stock of toner & cartridges will
be done by System Administration. This facility is extended for official purpose only.
Purpose:
Provisioning of voice and mobile connectivity is essential for fast telecommunication which saves time,
resources and energy.
Landline:
We are operating with 2 PRI lines comprising of 200 lines each connected to EPABX and
enabled basically intercom facility to all employees at the ratio of 4:1.
If an employee wishes to have dial out facility in his line, he has to get an approval from his line
Manager – The line manager approved request will further be sent to BH by Admin executive to
obtain final approval. The facility shall be extended based on the approval from BH.
Facilities like Zero dial; STD and ISD shall be enabled only to an eligible employee based on
approval from BH.
Those who have been enabled with Zero dial, STD and ISD facilities also, provided with
dynamic electronic locking systems to lock their telephones when not in use. Employees are
solely responsible for safeguarding the phones from misuse and accountability rests with them
for the calls made from their allocated phones.
Mobile Connections:
Company provides only mobile phone connectivity (not an instrument) to those essential staff
who are required to be contacted 24/7 basis. The eligibility criterion is purely decided by their
respective Manager and the same should be approved by BH. Based on the approval, the
following process shall be adopted.
As per the requirement, an Admin Executive will be appointed as a coordinator to monitor with
the service provider.
All mobile connectivity related activities are required to be routed through Admin Coordinator
The service provider will act upon only on the Advice from Coordinator as appointed by the
company.
The connectivity is on the postpaid mode with the service provider
Stake holder to submit the approved request form to Admin Process owner
Admin Process owner interacts with the service provider for the connectivity by aligning with the
approved corporate tariff plan in hand.
As far as possible, employees are expected to utilize this facility for official purpose.
The bill will be generated every month and forward to the company coordinator by the service
provider.
The coordinator in turn forwards the bill to all the employees.
Employees to identify the personal and official calls. The cost incurred towards personal
calls/value added services are to be borne by the employees and to endorse on the bill (
needless to mention that the cost includes appropriate tax too)
Upon segregating personal calls and endorsing the amount, the employees need to sign the
bill.
The bill needs to be approved employee’s Manager and submitted to the Admin coordinator
well before due date to process the payment
During exit from the company, an employee to hand over the SIM to the Admin coordinator and
to settle his bill for closure of the account.
If the settlement of the bill is delayed reason beyond Admin Coordinator, Admin will advise HR
department to settle the same out of Full & Final Settlement due to the employee.
12 TRAVEL DESK
Aim:
To extend the facility to those employees who reports early to the work, extended work and official work
away from office.
Purpose:
To facilitate cab facility in order to ease out the employee to come early or leave late hours, motivate to
work. Extending cab service will save the valuable time and also, economical as compared to own arranged
cab facility.
The Admin Travel desk will be responsible for carrying out the above mentioned jobs under the supervision
of Manager Admin.
Cab Booking:
Car rental / hiring will be done only on receipt of approved request from HOD’s, recommended
by Project Manager / Divisional Head.
Admin Team will arrange cab services for any project/team strictly by following the procedure
mentioned below:
Approved request form HOD’s to reach Admin Team with minimum 2 hours prior notice during
working hours and on working days only.
EAF will initiate action only after receiving such requests submitted to him/her.
Any cancellation should be requested over phone, which has to be confirmed by email to EAF
at least by giving 2 Hrs. before scheduled departure by the Cab agent. Late cancellation cannot
be honored and the expense incurred will be debited to individual project or team.
Any cab requirement for weekends and holidays should be informed to EAF with approved
request form at least 24 hours prior notice during working hours and during working days only.
Failing to do this, the individual or team or project cannot expect Admin to do the arrangement,
instead they will have to make their own arrangement and claim the same on later date by
justifying such failures to his / her project Manager.
Contract employees of other locations need to claim their expenses by producing the bills
attached to an expense sheet and then claim their expenses from Finance, by getting their
claims approved by HOD’s
US employees visiting India on a business trip will have to meet their expenses by themselves
and then claim their expenses from their USA office.
Note: A separate cab policy has been drawn and posted at HRIS for reference & adherence
Bus/Train Bookings:
Approved Travel Request Form should be submitted to EAF with min. 48hrs prior intimation.
Based on the Request, EAF will arrange for your booking
Tickets and information on travel will be given to the traveler at least 2 hrs before his / her
travel.
If tickets are not available, the same would be informed to the traveler and different mode of
travel will be initiated based on the importance of the travel with concerned DH decision.
Procedure:
For all travel policies & guidelines, please refer Folklore site by HR for information. Understanding the
policy, you may follow the procedure given below:
Option – 1: If an individual is required to make an official trip, he/she may refer the guidelines provided in
HR travel policy. Then you may take a Travel advance from Finance, using advance request form available
with Finance / Admin. You can make your own arrangements for your travel and accommodation. After
returning from your travel, you may settle your travel expenses within 48 hours of your return. You can use
the prescribed travel settlement form available with Finance / Admin and complete the formalities within 48
hours / 4 days on your return from your official trip.
Option – 2: If an individual traveling on his/her business visit to any place and who wishes Admin
department to do his/her Air/Train/Bus ticket booking and accommodation arrangements, should follow the
procedure as under.
Travel Request Form has to be filled by the individual and get his/her DH recommendation in
the application and the same should be approved by HGD/AVP/HKPO/HTRG.
The individual has to submit his/her approved request to Admin Department well in time at least
by giving admin department a cushion time of One week (i.e. 7 working days) to do the needful
and to confirm his travel booking.
Submission of approved Travel Request form to EAF is mandatory for Admin to act upon the
request. Please note that no oral request will be entertained.
Admin acts upon the request and as per the eligibility works out the mode of travel (i.e. Bus /
Train / Flight) and delivers the tickets to the individual at least one day before the scheduled
travel. If requested in the Travel request form, admin also makes the stay arrangement for the
individual in all possible metro cities and keep the individual informed through email the name
of the hotel / serviced apartment and its address with contact person and contract number.
If there is any damage commercially, owing to last minute cancellation, the same has to be
bone by the individual project who had requested this travel.
Accommodation:
Employees outside Bangalore who request hotel reservations will be done on receipt of
request. From concerned department / other location through approval mail. However
based on the requisition the hotel would be advised to forward the bill to Marlabs for
settlement of payment and these would be paid on receipt of bills or the individual has to
clear the payment based on the approval.
Guest House (Mysore Branch) is for only employees from other location. In case of non-
availability of guesthouse, the booking will be made in other hotel or service apartment.
Maintenance of Guesthouse is the responsibility of the Admin service helpdesk.
Based on the need HR department will request for accommodation for new joiness form
other location, Admin service will co-ordinate with Admin Manager and book Chummery
accordingly. Incase of non-availability of chummery, accommodation for the same will be
done in a hotel or service apartment.
Asset / Service Provider Health Card:
Admin maintains the asset health card for all the equipments to track the asset or service provider operating
condition. It helps to analyze the asset functional efficiency.
Other Requirements:
Other Requirements apart from the above mentioned process will be routed through Admin Manager and
the same will be facilitated accordingly.
13 MATERIAL MOVEMENT
Aim:
The aim is to ensure proper accountability of company property and to keep track of all in and out
movements of materials.
Purpose:
It is important to have accountability and tracking of all company property that is being sent out from the
premises and also to have proper accounting of incoming materials may be returnable or non-returnable
items.
Outward Movement
All materials moving out from office premises to go with proper gate pass.
Security team has been instructed not to allow any material / company property with out any
authenticated document.
Material movements are of Two types (1) Returnable and (2) Non Returnable. Accordingly, the
gate pass has been devised for the type of movement.
Returnable gate passes are used for those materials which are expected to return to company
with a definite/tentative date
Non –Returnable gate pass is used for the material which not expected to return to the
company and will be struck out from the list/inventory.
A specimen signature list has been prepared department wise who are authorized to sign the
gate passes which has been duly approved by AVP India Operation
The list has been handed over to security team to verify the signatures before allowing the
material to move out from the premises.
Mismatch /not tallying with the list will be brought to the notice of Admin department to deal
further on the issue.
Departments who intending to send the material out on Returnable/Non-Returnable basis to
raise a gate pass accordingly which should accompany the material. The gate pass number is
to be serially numbered for easy account purpose by the departments. The material
register/inventory should be endorsed with the gate pass number together with date for proper
tracking/accounting purpose.
Upon raising the gate pass, the same should accompany the material and to be submitted to
Security team.
On receipt of the same, the security will physically inspect the material, verify the details
entered in the gate pass for correctness.
On ascertaining the correct details, the Security will enter the details in the “Material Out
ward” register opened separately for Returnable & Non –Returnable type of materials. The
entries are maintained serially and the serial number with date will be endorsed and signed on
the gate pass to have a counter check. A copy of the gate pass will be retained and filed by the
security.
The security team will capture weekly returnable material and list out the same and to hand
over the list to Admin Department
Admin Department in turn will update the status to departments which are to receive the
material back. This is being done to remind the department to follow up for the materials.
Likewise, non-returnable material also shall accompany a gate pass (Non Returnable Gate
pass) duly signed by the authorized signatory and entered in a register kept at Security Team.
Inward Movement:
Materials which are coming in to the company premises are initially to be reported to Security.
On receipt of the same, security will verify the incoming DC/Gate pass/Invoice and check for
physical quantity.
After ascertaining the quantity and correctness of entries, security will inform the department to
whom the materials have arrived.
On confirmation from the departments, security will enter all the details like, DC /Bill no,
quantity, Date Received etc. and endorse the Sl no/date /time of the entry on the DC/Gate
Pass/bill. The original will be forwarded to the concerned department and retains a copy in the
file.
Purpose:
It is important to extend facilities & logistics to employees who work during late/extended hours or during
holidays.
Process:
To support the production team, Admin will deploy a person to oversee the Admin
arrangements up to midnight.
An Electrician and a H/K personnel shall be available round ‘o’ clock to support the Admin
Member on duty.
Admin member to ensure to extend support in terms of H/K, Power, Food/snacks, coffee
&Tea and cab and any other Admin support.
Admin member will send out an e-mail a day in advance to the holiday to all the Managers
who are expected to work during holiday’s requesting to provide the quantity of food
required and arrange accordingly.
Arrangement of cab will be as per existing practice/policy.
Free Dinner will be arranged to those who expects to work beyond 9.30 pm in the night for
which employees to put up a request to Admin Member well in Advance ( at least a day in
advance)
However, dinner will be arranged to those who work permanently in the night shift for which
the concern Manager to approve for the quantity required.
Admin member on duty to facilitate snacks worth of Rs 15/- per employee/per night and
also, ensure provision of coffee/tea in the night up to a reasonable time.
In the absence of Admin member i.e. after midnight, security supervisor will extend the
support after concurring the same with Admin Team.
15 HOUSEKEEPING
Appointment of Housekeeping personnel:
SMA shall appoint the Housekeeping personnel.
The following factors has to be considered before appointing the personnel
1. Proven track record of the personnel
2. Reference Check
EAF will interview the personnel & refer the short listed ones to SMA for final discussion and
appoint the selected personnel, which meet the company’s house keeping requirements
adequately.
EAF will negotiate and finalize the terms of contract with the selected personnel with the
Agency providing the service.
EAF should submit the proposal to SMA. In turn SMA reviews & discusses the proposal with the
HGD/AVP/HKPO for approval.
The HGD/AVP/HKPO would sign the contract.
After the contract has been signed by the HGD/AVP/HKPO and the selected personnel. EAF
shall forward one copy of the contract to the selected personnel and the other to HR & one copy
to finance.
duties. A housekeeping boy / maid are allotted to clean the ladies/gents toilet respectively.
The housekeeping activities will be carried out on all days including Sunday’s and
holidays.
The housekeeping should be maintained as per the Checklist maintained by the Front office
executive and Maintenance Staff on a daily basis.
Daily activities:
Sweeping, mopping, dusting & vacuum cleaning
Dusting and wiping all workstations.
Cleaning Toilet every two hours
Cleaning Cafeteria – Keep it clean always
Cleaning and disinfecting telephone instruments
Cleaning Monitors, CPUs and Keyboards
Clearing garbage/ dustbins / disposed water cups
Re filling of water dispensers
Sweeping of parking area and front of reception, surrounding area of reception and ramp
leading to basement parking area (both entry & exit)
Weekly Cleaning:
Light fittings
All chairs of all floors
A/c inlet grills
A/c Filters – AHU / Split A/c
Terrace Floor
Terrace Table / Chairs
Kitchen scrubbing
Toilet scrubbing
Water Dispensers
Washing Dust bins
D.G & UPS Room cleaning
The housekeeping supervisor will take a complete round of the entire area and check if all the jobs have
been carried out satisfactorily in time. Apart from housekeeping supervisors, the Admin team members will
also go on rounds along with the supervisor before they start their day & list out areas to be cleaned again.
The SMA will do a surprise check of the facility with regard to housekeeping activities.
Housekeeping Materials:
The housekeeping materials are ordered every fortnight after approval from SMA. A register is maintained
by the housekeeping supervisor to monitor the consumption. Admin will monitor Stock of the material on
daily basis. All cleaning material used in the premise should be ecofriendly.
16 CAFETERIA
AIM:
It is desired to have a full-fledged service provider on board to meet the food to employees at agreed rate.
Purpose:
Food is an essential item required by employees. The caterer so engaged to supply food will be guided
under certain conditions to maintain quality, taste, hygiene and health of the employees.
Catering services is provided to the staff by the vendors who have been chosen by Marlabs. Arrangement
for Lunch, Dinner and Snacks is tied up with different vendors who cater at the Cafeteria. Employees can
make use of this facility a token system is administered for all members those who have lunch, Dinner, at
the cafeteria. Anyone without a token will not be entitled for lunch and Dinner. You are also required to sign
in a register. If you have taken the token and signed, your salary will reflect a deduction irrespective of you
having lunch or not.
Catering during Weekends and Holidays:
Any project / user who wishes to work on a week end and on holidays, who desires Lunch /
breakfast (Strictly on special approved request) / Dinner / Snack to be arranged for his team
should inform EAF with approved Catering request form signed by the individual and
recommended by the project head and approved by the HGD/AVP/HKPO/HTRG 24 hours in
advance for caterer to get prepared for the same.
Cancellation of any such request should also happen with 24 hours prior notice. Failing which
cancellation cannot be honored and the expense for the same will be debited to the particular
project/team. If you want to cancel lunch please inform security before 9.30AM (In person or
over phone).
However, lunch arrangement for small group of people on any emergency can be ordered
based on approved request form for any VIPs & guests with 2 hours prior notice. This will be
ordered from any nearby standard food court. If there is any specialty menu, the same should
be mentioned in the requisition form even with, the Food joint/food court of your preference.
Timings:
Lunch - 12:30 Hrs to 14:30 Hrs
Dinner – 20:30 Hrs to 22:00 Hrs
Snacks – Round o clock except on fixed break Time in the mid night.
Coffee/Tea is being served at the Cafeteria on 24 hours basis at free of Cost. Packaged drinking water is
provided to all the staff. The vendor will be responsible to provide the required numbers of dispensers
with hot & cold outlets. The Admin service helpdesk will be appraised by security on shortage of water.
Special Note:
Strictly employees will not be allowed to have any short eats at their work place. If any
employee desires to have short eats, should go to Cafeteria and have the same. Security
Supervisor has been authorized to intrude & stop the same with those employees who deviate
from this rule. Please avoid getting into any embarrassing situation.
Employees will not be served any beverages in their work places. They have to go to dry pantry
area and help themselves with beverages.
17 SECURITY SERVICES
AIM:
To ensure physical security of men and materials of the company
Purpose:
Security force has been deployed to ensure safety of men, material, facility and parking of vehicles within
the facility. They would also require manning the Reception to take charge of front office duties.
Workforce
Security has been deployed to guard the facility on round the clock basis the team comprises of One
Security officer who is in charge of the security services and works during General Shift.
18 EMERGENCY EVACUATION
AIM:
To ensure, as far as practicable, that no person suffers injury or illness as a result of fire in a building
Each workplace at Marlabs to have a fully implemented emergency evacuation procedure (EEP)
The procedures that follow are designed to evacuate the building incase of an emergency.
Emergency Evacuation Procedures in Case of Fire:
If noticed fire or any emergency, it will be announced through PA system and thereafter
Main Electrical switches are put off. No elevators (lifts) will be in operational condition.
Access doors are free from locking system so as to evacuate freely without any hindrance.
Doors at the rear lift lobby area will be opened by security personnel who ever are on duty
so that employees can also move out from this route.
Signage on ‘Fire Exit’ & location of ‘Fire Extinguishers’ and ‘Escape Route Maps’ are
displayed at all wings and at appropriate places in the building. Please familiarize on the
same which will be handy during emergencies.
Employees exit from Lift lobby area to assemble at the Road side on eastern part and those
who are exit from Main Reception to assemble at the adjacent side of car park area on
southern part of the building.
If the room is filling with smoke, stay close to the ground. The air is cooler and oxygen is more plentiful
in this region;
Wait for the Fire and Rescue Service to rescue you.
CAUTION
Fire spread rapidly;
Fire produce thick black smoke that is difficult to see through and
causes suffocation;
The fresh air will always be near the floor;
Move quickly. Do not run;
Be decisive;
Do not waste time and act smartly
Emergency Evacuation Priorities:
a. First Priority: Protection of Life
The first priority is to ensure that all people who may be in danger are warned, and that an action is taken to
guarantee their safety, before any steps are taken to prevent the spread of the hazard, to secure assets, or
to eliminate the hazard.
b. Second Priority: Prevent Spread of Hazard
The second priority aims at controlling the extent of the hazard within the building and minimizing its release
into the environment.
c. Third Priority: Save Assets in the Affected Area
The third priority is to prevent personal and company assets from being damaged in the event of a fire. The
final priority is to eliminate the fire by extinguishing it
d. Fourth Priority: Eliminate the Hazard
The final priority is to eliminate the fire by extinguishing it
CAUTION
While evacuating:
Do not create panic
Do not use lift
Walk briskly and do not run
Do not block the exit points
Give priority to evacuate aged/physically challenged/female employees.
Do not bother much about personal belongings as saving of life is important
If you are in a position to help others, please do so
On reaching assembly point, wait for further instructions.
Forming of ERT:
The team commands its role when disaster occurs. The team closely works with the commander in chief
and directs its employees to safe route and at the same time ensures for minimum impact to the property of
the company
The objective of fire & evacuation procedure is to familiarize all members of the ERT with necessary
procedure in place to facilitate safe, orderly and timely evacuation when need arise.
While Fire is the reason for implementation of an evacuation plan, other instances such as gas leakage,
bomb scare etc. may well necessitate evacuation of the premises. It is of vital importance that all members
of the ERT are familiar with the procedure to overcome the emergency situations
Based on an approval from the center head, the ERT has been formed and the list is as appended:
Note : The composition of the team is subject to change from time to time
Need to identify and draw the list of external contacts which will be handy during the disaster. The list
includes important contacts such as nearest Fire station, Hospitals, police station and such important
statutory bodies.
080-22971550
080-22971600
3 Mahadevpura 080-22971541
Police Station
Sl.No Name Contact Number Remarks
1 Control Room 100
2 Mahadevpura 080-22942546
3 Police station 080-28510782
POST OFFICE
Sl.No Name Contact Number Remarks
1 Mahadevapura 28530417
2 K R Puram 25610575
20 APPENDICES
Acronyms
Acronyms Description
AVP Assistant Vice President
BH Business Head
CMMI Capability Maturity Model Integration
EPABX Electronic Private Automatic Branch Exchange
HK House Keeping
HR Human Resource
ISD International Subscriber Dialing
IT Information Technology
PC Personal Computer
PO Purchase Order
PQMS Process and Quality Management System
Rs Rupee
SIM Security Identity Module
SLA Service Level Agreement
STD Subscriber Trunk Dialing
Definitions
Term Definition
Product It is any hardware or software entity requested by the purchaser. It can
be software tools and application.
Purchase Order An agreement or contract or letter of engagement with vendor to supply
products or services. Usually, it is a legal document executed by both
purchaser and supplier.
Purchaser A person or function who takes the ownership of purchase of products
and/or services requested by requester.
Requester A person or PM or support function personnel who initiates a purchase
request.
Service Service is some set of tasks which shall be provided based on standard
process and requirements submitted by the requester and as per agree
SLAs.
Service Level It is contractual obligation on vendor part to provide services to
Agreement purchaser with in stipulated turnaround time.