Highway Case Histories – India

Construction and Performance Evaluation,


Upshi sarchu project Himank, Leh
Border Road Organisation (BRO),2011

Control Surface in 2012 Treated Surface in 2014

Grade VG10  The compaction achieved in 4 passes


compared to 8 passes.
Dosage 0.1 % Zycosoil by weight of bitumen  No sticking on the machinery surface. Performance
Letters
 Stripping value at 0.1% = 90-100%
 Better Bonding and improved stability

2
GIDC Industrial Road, Janta Chokdi,
Vitthal Udhyognagar, Dist. Anand, Gujarat
Vishvakarma Consultants, 2009

6th post-monsoon evaluation in 2016


 Reduced sticking was observed on equipment.
Grade VG30  Excellent retention of bitumen coating over
aggregates resulting to improved compaction. Performance
Letter 2009-14
Dosage 0.1 % Zycosoil by weight of bitumen  The surface over the years has been found to be intact
and no loss in strength, potholes or broken edges etc.
has been observed

3
NH 3 (NH-75), Shivpuri Gwalior, Madhya Pradesh
Chainage: 15+600 to 236+000
Dilip Buildcon, 2015

Stripping test by IS6241 >95%


ASTMD3625 Boil Test Report >95%
Marshall Density 2.365 gm/cc
Marshall Stability 13.31 KN
Flow 4.1 mm

 The problem of stripping was resolved


Grade VG30  Better coating of aggregates
 Shinier looking hot mix
Dosage 0.1 % Zycotherm by weight of bitumen  Better workability and compaction in field

4
Overlaying BC at NH-45B, Tamil Nadu
Trichy Bypass to Karungalakudi, Chennai
Eagle Deep, 2016

Post Monsoon
% Retained Coating after
Boil Test Results
Grade VG40 15 min 30 min 45min 60 min 90 min
Control 99 98 94 90 88
Dosage 0.1 % Zycosoil by weight of bitumen
Zycotherm 0.1% 100 99 94 92 90

5
NH 8, Udaipur Section, Gomti Ka Chauraha, Rajasthan
Chainage: 177+00 to 260+100
Sadbhaav Engineering, 2015

 Improves anti-stripping considerably, while also


improving the Marshall Stability and maintaining the
Zycotherm 0.08 % by weight of bitumen flow value.
 35 sec Mixing Time. Approval Field Trial
Letter Report
 Enhanced moisture and rut resistance
 Blacker mix due to better compaction of 1%-1.5%

6
National Highway 96 (330), Uttar Pradesh
Faizabad – Allahabad, Chainage: 0.00 to 46.470
HG Infrastructure Ltd, 2016

Test Control With Zycotherm


Grade VG30 Stripping Value (retained 70 % 98 %
coating) (after 30 min) 97%
Dosage 0.1 % Zycosoil by weight of bitumen
Marshall Stability 21.63 KN 23.55 KN
Retained Marshall Stability 94 % 100 %

7
NH-06 Rajnandgaon, Chattisgarh
Chainage: 322+400 to 405+000
Ashoka Buildcon, 2017

 100% coating of aggregate even after 30 min boil test


(Extended ASTM D 3625).
Grade VG40
 Shinier looking hot mix
Dosage 0.1 % Zycotherm-AS by weight of bitumen  Improvement in stickiness and higher adhesion between
the particles
 Better workability and compaction in field

8
Unnao - Lucknow Expressway, Uttar Pradesh
Chainage: 236+500 to 299+588
Larsen &Tubro, 2017

Treated Surface in 2014


 Ease in workability was observed at site.
Grade VG40  Jet black look with glossy finish was observed after
compaction
Dosage 0.08% Zycosoil by weight of bitumen  Cleaner equipment
 Non sticky surface after compaction Approval
Letter

9
National Highway - 24B, Uttar Pradesh
Lucknow - Raibarelli, Chainage: 12+700 to 82+700
Centrodorstroy India Pvt. Ltd, 2016

 Improved stability with a reduction in the binder


content by 0.2%
Grade VG
 Improved workability with better surface finishing Field Trial
report
Dosage 0.1% by weight of Bitumen  Jet black look with glossy finish
 100C temperature reduction leading to cost saving

Bitumen Content reduced by 0.2%


10
Jaipur-Nagaur Road, Rajasthan
Chainage: Kalwar (18+000) to Narayanpura tirah (101+700)
HG Infra, 2013

 Improved anti- stripping and the Marshall


Grade VG30 Stability & maintaining the flow value.
 Enhanced moisture and rut resistance Performance Letter
(2014)
Dosage 0.1 % Zycosoil by weight of bitumen  Improved Mix TSR
 Higher compaction
 Blacker mix

11
Post Monsoon Evaluation, Rajasthan
Jaipur-Nagaur Road, Chainage: 18+00 to 101+700
2017

 Even after 5 monsoon cycle,


Grade VG30  No distresses found along 80 km stretch
 Little accumulation of bitumen (bleeding) was
Dosage 0.1 % Zycosoil by weight of bitumen observed at some places, which may be due to the
high temperature or less finer materials.

12
Rajasmand (NH 8), Bhilwara (NH 79), Rajasthan
Section of NH758 Chainage Km 90.28 to km 90.52
Sadbhaav Engineering, 2014

Paving & Compaction - April 2014 Inspection of the Finished Surface–December 2014

 Solved the stripping issue


Grade VG  Improved workability
 Consistent compaction Field obs. & CEG
Dosage 0.05 % Zycotherm by weight of bitumen  Shinier Mix Report
Lab Reports

13
Pavement Evaluation, Rajasthan
Rajasmand (NH 8), Bhilwara (NH 79), Section of NH758
2016

Test With Zycotherm


Grade VG
Stripping Value 100 % retained coating
Dosage 0.05 % Zycotherm by weight of bitumen Marshall Stability 18.55 KN
Marshall Density 2.225 g/cc

14
Rehabilitation of NH-28c, Uttar Pradesh
Barabanki-Jarwal Section; Chainage: 0+000 to 43+000
PNC Infratech Ltd.,2016

 Improved Marshall Stability thus Maintaining Flow


Grade VG30
valve
Dosage 0.1 % Zycosoil by weight of bitumen  Blacker mix, Faster Coating, Wetting and saturation
of finest pores & Crevices on aggregate.
 Enhanced Moisture & Rut Resistance

15
NH 152/65, Haryana
Kaithal to Rajasthan Border, Chainage: 33+250 to 248+580
IRB. Ltd., 2015

 Uniform coating
Grade VG30
 No Ravelling or Distress observed over the time CRRI Test Results
Dosage 0.05 % Zycotherm by weight of bitumen  Higher workability for the mix
 Reduced the stickiness of the mix
 Cleaner equipment surfaces

16
Asian Highway 02, West Bengal
Kakarbitta - Bagdodara - Banglabandha section , Siliguri
DR Agarwal Infracon Pvt Ltd., 2017

 Higher workability for the mix


Grade VG 40
 Reduced the stickiness of the mix
Dosage 0.08 % Zycotherm by weight of bitumen  Cleaner equipment surfaces
 No Ravelling or Distress observed over the time

17
JLN Marg, Rajasthan
Jaipur Development Authority
GRV Infrastructure, 2014

Grade VG30 Even after 5 monsoon cycle, the surface over the years has
been found to be intact and no loss in strength, potholes or
Dosage 0.1 % Zycotherm by weight of bitumen broken edges etc. has been observed

18
Tonk Road, Jaipur, Rajasthan
Jaipur Development Authority
GRV Infrastructure, 2017

Grade VG30 Even after 3 monsoon cycle, the surface over the years has
been found to be intact and no loss in strength, potholes or
Dosage 0.1 % Zycotherm by weight of bitumen broken edges etc. has been observed

19
Widening & Strengthening National Highway - 15, Rajasthan
Bikaner – Phalodi Section; Chainage: 4+200 to 163+500
IRCON International, 2016

 Ease in workability was observed at site.


Grade VG40  Better laying, Shinier surface and proper coating
Dosage 0.08% Zycotherm by weight of bitumen  Better performance in Marshall Test
 Better and Improved tensile strength ratio

20
Widening and strengthening of NH-112, Rajasthan
Jodhpur Pachpadra, Chainage: 140+000 to 225+615
Sadbhav Engineering,2011

Treated Surface in 2014

Grade VG 30  Faster mixing with Zycotherm observed


 Complete coating of fines
Dosage 0.1 % Zycotherm by weight of bitumen  Better workability at hauling distance of 28km
 Elimination of stickiness
 Desired density observed after core cutting

21
National Highway 50,, Maharashtra
Khed Sinnar Expressway, Chainage:42+000 to 177+000
GHV, Monte Carlo, Roadway, 2015

 Improves anti-stripping considerably


Grade PMB40  Ease of handling the mix
 Water absorption of the aggregates has been
Dosage 0.1 % Zycotherm by weight of bitumen reduced considerably

22
National Highway 17, Goa
Karnataka Goa Border to Kundarpur section,
IRB, 2016

 Ease in workability was observed at site.


Grade VG40  Better laying, Shinier surface and proper coating
Dosage 0.08% Zycotherm by weight of bitumen  Better performance in Marshall Test
 Better and Improved tensile strength ratio

Bitumen Content lowered by 0.3%


23
National Highway 8, Gujarat
Vadodara Ahmedabad Highway,
IRB, 2014

 Ease in workability was observed at site


Grade PMB 40  Uniform and consistent Coating on aggregate
Dosage 0.08% Zycotherm by weight of bitumen  Better ease in handling the mix
 Excellent finishing on-field

Bitumen Content lowered by 0.2%


24
Reconstruction of NH-125, Uttarakhand
Chainage: km 92.880 to km 121.550
M/S Shivalaya Construction co. Pvt. Ltd., 2018

Grade VG 10  Excellent Workability after 25km of haul


 Excellent finishing on-field
Dosage 0.1 % Zycotherm by weight of bitumen  Better ease of handling the mix
 Uniform and consistent Coating on aggregate

25
National Highway - 94, Uttarakhand
Munikireti – Agrakhal, Chainage: km 1.957 – 28.600
MGPCL, 2018

Grade VG 30  Excellent Workability


 Excellent finishing on-field
Dosage 0.1 % Zycotherm by weight of bitumen  Cleaner equipment surfaces
 Black and shiny mix

26
NH-93, Aligarh Moradabad section, Uttar Pradesh
Chainage: 86+650 to 232+020
M/s PNC Infratech Limited, 2017

 Improved Bonding between aggregates and Bitumen


Grade VG40  Jet black look with glossy finish was observed after
compaction
Dosage 0.1% Zycotherm by weight of Bitumen
 Ease in workability was observed at site
 Cleaner equipment

27
National Highway 54, Punjab
Amritsar Pathankot
IRB, 2017

Nanotac:
Grade VG40  Tack free surface & No Tire Pick up
 Quick Setting Time
Dosage 0.1% Zycotherm by weight of Bitumen  Eliminates nozzle Clogging
Zycotherm:
 Better bonding between aggregates and bitumen
 Improved workability of the bituminous mix
28
Aurangabad to Jalna, Maharashtra
Chainage: 12+700 to 82+700
Sadbhaav Engineering, 2016

 Improved Bonding between aggregates and Bitumen


Grade VG  Ease in workability was observed at site.
 Jet black look with glossy finish was observed after
Dosage 0.1% by weight of Bitumen
compaction
 Cleaner equipment
 Non sticky surface after compaction
29
Outer Ring Road, Yadgarpally, Keesara Mandal
Dist. Ranga Reddy, Hyderabad
2011-12

 Ease of handling bituminous mix due to higher


Grade VG10 workability
 Improved Rut resistance
Dosage 0.1 % Zycosoil by weight of bitumen
 Cleaner equipment
 Odourless work environment
 Jet black look of finished surface
30
NH 6, Orissa Border Aurang, Chhattisgarh
Chainage Km 88+000 to 238+400
BSCPL Infrastructure Limited, 2014-15

 Improved bonding between aggregates and bitumen


Grade VG30  Ease of handling bituminous mix due to higher
workability
Dosage 0.1 % Zycosoil by weight of bitumen
 Achieved higher compaction density on field by 1-1.5%
 Cleaner equipment
 Odourless work environment
 Jet black look of finished surface 31
NH-232,Raibarelli- Banda, Uttar Pradesh
Centrodorstroy India Pvt. Ltd, 2016

 Ease of handling bituminous mix due to higher


Grade VG 30 workability
 Improved Rut resistance
Dosage 0.1% by weight of Bitumen
 Cleaner equipment
 Odourless work environment
 Jet black look of finished surface
32
National Highway 95, Punjab
Kharar to Simrala Chowk, Ludhiana
Ashoka Buildcon, 2018

Grade VG 40 with 35% RAP

Dosage 0.1 % Zycosoil by weight of bitumen


 Ease of handling bituminous mix
 Odourless work environment
 Jet black look of finished surface 33