Professional Documents
Culture Documents
Technical (Unpriced) Package1
Technical (Unpriced) Package1
07504867875
cpccompanyinfo@gmail.com
Creative Petroleum Construction Work Experience Has Shown In The Table Below:-
Work Experience
Name of Client & Contract Period Types of activities undertaken
previous Reference Value of
contracts Contact Details activity
including
e-mail
Reconstruction Gulf Keystone 270,000 USD 2014 Reconstruction of 2km with single dress and
of Kukhi Village, Petroleum extending 4km new road with single dress.
attrosh 6 km This project tendering, project management
and site engineering was conducted by Dr.
Ahmed Khairadeen in a contract with Anar
Logistics Ltd.
Construction of Samyan 5,000,000,000 2014 Construction conducted by Engineer Sardar
apartments / 4 Company/ Araz IQD Mohammed Salih in a contract with Samyan
building of 8 Mzory Company Ltd.
floors /07504588708
Crude oil Gulf Keystone 1,400,000 USD 2015-20 Transporting crude oil from Atrosh to
logistic services Petroleum 17 Peshabar using truck trailers 36,000 ltr. The
from Atrosh to tendering documentation and contract sign
Peshaber DNO was done by Dr. Ahmed Khairadeen working
location with Anar Logistics.
Rehabilitation Duhok 400,000,000 2016 Construction conducted by Engineer Sardar
of mayoralty of Governorate / IQD Mohammed Salih
Mangeshk / Eng.Karzan Adil
Duhok / 07504872817
Livelihood Norwegian 3,500,000 USD 2020 Supervised by Engineer Sardar Mohammed
project in Church Aid/ Salih
Ninawa Claudio Milani
governorate /003933983860
funded by GIZ 15
ㅡ
Work Area Constructions
General Trading
Oil Transport
Engineering Consultancy
5. Describe the proximity of your operating base to the location where the
services shall be performed, namely Hawler Block.
We Will Establish Temporary Base Consist Of Cabins For Our Operating And Management
Team Tos Stay Inside During Construction Period And 60% Of Our Workforce Will Be Dedicated
To This Project .
Our Local Constructor Team Is Located (Hawler,Bahrke And Duhok,Grebase) Both Teams Can
Operate A Supporting Bases To The Main Contractor Base For The KinderGarden
And Our Contractor Team Consist Of Excavation Timble Work,Steal Wok, Concrete
Work,Finishing Work, Landskip Work and The Other Work Package Like ELectric And
Mechanical Work Will Be Subcontracted By Local Contractor Under Our Supervisions.
Work Experience
Name of Client & Contract Period Types of activities undertaken
previous Reference Value of
contracts Contact Details activity
including
e-mail
Reconstruction Gulf Keystone 270,000 USD 2014 Reconstruction of 2km with single dress and
of Kukhi Village, Petroleum extending 4km new road with single dress.
attrosh 6 km This project tendering, project management
and site engineering was conducted by Dr.
Ahmed Khairadeen in a contract with Anar
Logistics Ltd.
Construction of Samyan 5,000,000,000 2014 Construction conducted by Engineer Sardar
apartments / 4 Company/ Araz IQD Mohammed Salih in a contract with Samyan
building of 8 Mzory Company Ltd.
floors /07504588708
Crude oil Gulf Keystone 1,400,000 USD 2015-20 Transporting crude oil from Atrosh to
logistic services Petroleum 17 Peshabar using truck trailers 36,000 ltr. The
from Atrosh to tendering documentation and contract sign
Peshaber DNO was done by Dr. Ahmed Khairadeen working
location with Anar Logistics.
Rehabilitation Duhok 400,000,000 2016 Construction conducted by Engineer Sardar
of mayoralty of Governorate / IQD Mohammed Salih
Mangeshk / Eng.Karzan Adil
Duhok / 07504872817
Livelihood Norwegian 3,500,000 USD 2020 Supervised by Engineer Sardar Mohammed
project in Church Aid/ Salih
Ninawa Claudio Milani
governorate /003933983860
funded by GIZ 15
Our Local Constructor Team Is Located (Hawler,Bahrke And Duhok,Grebase) Both Teams Can
Operate A Supporting Bases To The Main Contractor Base For The KinderGarden
And Our Contractor Team Consist Of Excavation Timble Work,Steel Work, Concrete
Work,Finishing Work, Landskip Work and The Other Work Package Like ELectric And
Mechanical Work Will Be Subcontracted By Local Contractor Under Our Supervisions.
11. Describe your project plan for this specific request for quotation
and submit it along with your technical proposal. :-
We Will Establish Temporary Base Consist Of Cabins For Our Operating And Management
Team Tos Stay Inside During Construction Period And 60% Of Our Workforce Will Be Dedicated
To This Project ,And Our Team Have :-
1. Creative Petroleum Construction Support Base consist Of Construction Team That is
specialist Site engineering Services .
2. Architecture team That Specializes In Designing And Documenting The Design
interior,Exterior And Landskip Of The KinderGarden.
3. Local Logistic Team To Transport Between Company Base And temporary Construction
Site Base .
4. HSE Management And PPE Management Team Protecting IndividualOne Or More
Health And Safety Hazards.
5. 100% Of Our Company Personnel Team In Kurdistan And Iraq Nationality.