The document discusses the calculation of shear reinforcement in a reinforced concrete beam using the PBI 1971 method. It provides details of the beam such as dimensions, loads, and material properties. It then shows calculations of the required shear strength provided by the concrete, stirrups, and additional reinforcement. The summary concludes that stirrups are required and selects a #8 bar at 37.25 cm spacing to provide the necessary shear reinforcement.
The document discusses the calculation of shear reinforcement in a reinforced concrete beam using the PBI 1971 method. It provides details of the beam such as dimensions, loads, and material properties. It then shows calculations of the required shear strength provided by the concrete, stirrups, and additional reinforcement. The summary concludes that stirrups are required and selects a #8 bar at 37.25 cm spacing to provide the necessary shear reinforcement.
The document discusses the calculation of shear reinforcement in a reinforced concrete beam using the PBI 1971 method. It provides details of the beam such as dimensions, loads, and material properties. It then shows calculations of the required shear strength provided by the concrete, stirrups, and additional reinforcement. The summary concludes that stirrups are required and selects a #8 bar at 37.25 cm spacing to provide the necessary shear reinforcement.
The document discusses the calculation of shear reinforcement in a reinforced concrete beam using the PBI 1971 method. It provides details of the beam such as dimensions, loads, and material properties. It then shows calculations of the required shear strength provided by the concrete, stirrups, and additional reinforcement. The summary concludes that stirrups are required and selects a #8 bar at 37.25 cm spacing to provide the necessary shear reinforcement.
Beban ( v ) D= 10,000 kg begel D 8 Tul.Utama Mpuntir = 0.500 tm
v Permanen b= 25 cm d = 4.75 cm D 19 Geser ijin lentur dgn puntir Temporer ht = 50 cm h = 45.25 cm Jml 1 t bi = 10.800 kg/cm2 Ft = 769.5 cm2 selimut = 3 cm Baris tbmi = 27.000 kg/cm2 Ut = 119 cm Geser ijin lentur K 400 tbi = 8.60 kg/cm2 2.6 Mt U 24 tbsi = 13.60 kg/cm2 s ai = 1392 kg/cm2 y=3+ = 4.061 tb ' = y = 6.50 kg/cm2 tbmi = 21.60 kg/cm2 0.45 + ht/b ht . b2
tb = = 10.10 kg/cm2 = 2.60 kg/cm2 > tbi… 7/8.b.h As = 1.01 cm2 tb + tb'' = 12.70 kg/cm2 < ts tt = 1.50 as = As sa/(tt.b) kg/cm2 = 37.25 cm as = As sa/(ts.b) Amem = Mt x Ut /(2 x sa x Ft) = 4.41 cm = 2.78 cm2 Dipakai Begel : D8 - 37.25
Perhitungan Pembesian Geser Beton Bertulang
Dihitung dengan Metoda "PBI 1971" Konstruksi Beton, Pembesian Metoda Lentur n Pembesian Geser