Bridge Plot Plan Layout Elevation EL (+) 16.900
Bridge Plot Plan Layout Elevation EL (+) 16.900
BKI801: Vertical ladder on the bridge, landing area is on the escape way.
WHP01-PMC1-ASFCZ-
There is possibility of clash between person coming from vertical ladder and
1 02-190001- Firdauzi Incorporated. Closed PTSC
person who walk on the bridge.
0001_rev01
Please check and review the vertical ladder access and orientation.
WHP01-PMC1-ASFCZ-
This laydown area is not for the ESDVs. It is only for
2 02-190001- Firdauzi Seems this laydown area is for the ESDVs above but how to drop it there? - -
transferring something between Platforms.
0001_rev01
WHP01-PMC1-ASFCZ-
3 02-190001- Firdauzi BKI801: Stair location is not matched with View B-B Incorporated. Closed PTSC
0001_rev01
45°
1 - EXPANSION LOOP STRUCTURE IS INDICATIVE.
PREVAILING
WIND
N
2 - LENGTH OF D.O.P IS INDICATIVE.
5°
40.8
Holds:
1. ACCESS PLATFORM FOR MAINTENANCE.
FC PLATFORM FA PLATFORM
EQUIPMENT LIST 02
5200 5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 5200
02
Legend:
LIFTING PADEYE
LIFTING PADEYE
4280
- GRATING 02 - DATUM POINT
2000
EL.(+) 22.000
WALKWAY
7000
- PRIMARY ESCAPE WAY
NAME
NAME
900
1600
N
FC PLATFORM
DROP-
MEZZA
ZONE
NINE-D
ECK
LAYDO
EA
Y-SHO
(5
FA-FC BRIDGE
TOTE-
WER NOS.)
CHOKE
HATCH
TANKS
VALVE
FOR
FROM/
ACCES
S TO
DECK
LADDER FROM/TO
BRIDGE WALK WAY
5000
= =
CROSSOVER (HOLD-1)
T.O.G EL(+) 23.513
LADDER FROM/TO
BRIDGE WALK WAY
10
12
4
13
5
14
6
15
19
7
16
20
8
FC PLATFORM FA PLATFORM WHP01-PMC1-ASFCY-02-190002-0001 FC WELLHEAD PLATFORM PLOT PLAN / LAYOUT SPIDER DECK EL (+) 8.119 TOG
WHP01-PMC1-ASFCY-02-190003-0001 FC WELLHEAD PLATFORM PLOT PLAN / LAYOUT CELLAR DECK EL (+) 13.400
WHP01-PMC1-ASFCY-02-190004-0001 FC WELLHEAD PLATFORM PLOT PLAN / LAYOUT MEZZANINE DECK EL (+) 16.900 T.O.S
100000 (THEORETIC LENGTH BETWEEN SUPPORTS)
B A WHP01-PMC1-ASFCY-02-190005-0001 FC WELLHEAD PLATFORM PLOT PLAN / LAYOUT MAIN DECK EL (+) 22.400
WHP01-PMC1-ASFCY-02-190006-0001 FC WELLHEAD PLATFORM PLOT PLAN/ LAYOUT ACCESS DECK EL (+) 26.000
R3
200
0@ WHP01-PMC1-ASFCY-02-190007-0001 FC WELLHEAD PLATFORM PLOT PLAN / LAYOUT TOP DECK EL (+) 30.000
KO DRUM ACCESS PLATFORM T.O.S EL(+) 15.192 7T
ON
S( WHP01-PMC1-ASFCY-02-190008-0001 FC WELLHEAD PLATFORM PLOT PLAN / LAYOUT ELEVATION VIEW FACING NORTH
5500 5200 1823 3777 5600 11200 83600 MA 5700 4000
X)
WHP01-PMC1-ASFCY-02-190009-0001 FC WELLHEAD PLATFORM PLOT PLAN / LAYOUT ELEVATION VIEW FACING WEST
DROP OBJECT T.O.S EL(+) 19.350
PROTECTION
EXPANSION LOOP EXPANSION LOOP
1850
NOTE 1 NOTE 1
2250
LADDER FROM/TO DROP OBJECT
BRIDGE WALK WAY PROTECTION
ASFCA-V-4010
LADDER FROM/TO
BRIDGE WALK WAY
02 02 02
5000
1
= =
NAME
02
01 17-April-2019 IFA ISSUED FOR ACCEPTANCE NTK NKH RKA / BXL
02
2a 00 07-Jan-19 IFR ISSUED FOR REVIEW NTK NKH RKA / BXL
4000 (TYP.)
1MT LAYDOWN
2600
EXPANSION LOOP EXPANSION LOOP AREA
02 02 2500x2000
2250
NOTE 1 NOTE 1
NAME
02
02
5200 5600 5600 5600 1100 3000 1500 5600 5200
22000
5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 PTSC
PLATFORM FA - NEW BRIDGE LANDING PTSC M&C
SEE DWG : WHP01-PMC1-ASFAA-02-00004-0001
WHP01-PMC1-ASFCZ-02-190001-0001
GALLAF PROJECT - NWHP01- DECKS, BRIDGES AND OFFSHORE INTEGRATION WORKS
VIEW A-A
FA-FC BRIDGE
PLOT PLAN / LAYOUT
ELEVATION EL(+) 16.900
1:200 A1 ASFCZ-02-190001-0001 1 of 1 02
NOC-QA_BORDER_A1H_01_A