Comments Resolution Sheet (CRS) Project No / Title GALLAF PROJECT

Document Number: WHP01-PMC1-ASFCZ-02-190001-0001_rev01 Revision 01 Rev. Date 12/Apr/2019


Document Title: FA-FC BRIDGE PLOT PLAN / LAYOUT ELEVATION EL (+) 16.900
Review Details
S/No Section/Para/Dwg. Reviewer Comments Proposed Change Response Closed Closed by

BKI801: Vertical ladder on the bridge, landing area is on the escape way.
WHP01-PMC1-ASFCZ-
There is possibility of clash between person coming from vertical ladder and
1 02-190001- Firdauzi Incorporated. Closed PTSC
person who walk on the bridge.
0001_rev01
Please check and review the vertical ladder access and orientation.

WHP01-PMC1-ASFCZ-
This laydown area is not for the ESDVs. It is only for
2 02-190001- Firdauzi Seems this laydown area is for the ESDVs above but how to drop it there? - -
transferring something between Platforms.
0001_rev01

WHP01-PMC1-ASFCZ-
3 02-190001- Firdauzi BKI801: Stair location is not matched with View B-B Incorporated. Closed PTSC
0001_rev01

BKI801: Typical comment.


WHP01-PMC1-ASFCZ-
Datum point to be updated in Equipment list table on the plot plan.
4 02-190001- Firdauzi Incorporated. Closed PTSC
Vendor to follow thr same datum point specified on the plot plan.
0001_rev01
Structure to follow same for equipment support.

Page 1 of 1 Major Projects Template MAJOR-ASY-MPQA-MPQA-FOR-000005_Rev00 Dated 09/06/2018


TRUE
NORTH
PLANT
NORTH
NOTES
NOTE :

45°
1 - EXPANSION LOOP STRUCTURE IS INDICATIVE.
PREVAILING
WIND

N
2 - LENGTH OF D.O.P IS INDICATIVE.


40.8
Holds:
1. ACCESS PLATFORM FOR MAINTENANCE.

FC PLATFORM FA PLATFORM
EQUIPMENT LIST 02

B A ITEM NO. DESCRIPTION SIZE EAST NORTH EL.


ASFCA-V-4010 HP FLARE KO DRUM 2250(Ø) x 7000(T/T) 897323 1024900 17850
DROP OBJECT PROTECTION DROP OBJECT PROTECTION (NOTE 2)

5500 100000 (THEORETICAL LENGTH BETWEEN SUPPORTS) 9700

5200 5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 5200

ESDV ACCESS PLATFORM

02
Legend:
LIFTING PADEYE
LIFTING PADEYE

4280
- GRATING 02 - DATUM POINT
2000

EL.(+) 22.000

- PLATING - REFERENCE POINT

WALKWAY

7000
- PRIMARY ESCAPE WAY
NAME

NAME

EL.(+) 16.900 T.O.S.


(WALKWAY)
- SECONDARY ESCAPE WAY
EL.(+) 15.000

900
1600

EL.(+) 14.100 T.O.S.


EL.(+) 13.400 T.O.S.
(PLATFORM - FC)
(PLATFORM - FA)
Key Plan:
TRUE
NORTH

SLIDING SIDE FA - FC BRIDGE FIXED SIDE PLANT


NORTH

N
FC PLATFORM
DROP-
MEZZA

ZONE
NINE-D

ECK

RESERVED SPACE FOR RESERVED SPACE FOR ASFCA

ELEVATION ON BRIDGE - FA TO FC PLATFORM


VALVE 2" ESDV-290002 (GPS) VALVE 18" ESDV-330001 (PHS)
-A-6101

RESERVED SPACE FOR RESERVED SPACE FOR


DROP-
MAIN-D
ZONE
ECK

LAYDO

VALVE 6" ESDV-290001 (GPS) VALVE 2" ESDV-330002 (PHS)


WN-AR

EA

RESERVED SPACE FOR


40.8

T.O.G EL(+) 22.308 VALVE 6" ESDV-450001 (GPS-FUTURE) SAFET

Y-SHO
(5

FA-FC BRIDGE

TOTE-
WER NOS.)
CHOKE
HATCH

TANKS
VALVE
FOR

FROM/
ACCES

S TO
DECK

LADDER FROM/TO
BRIDGE WALK WAY

5000
= =
CROSSOVER (HOLD-1)
T.O.G EL(+) 23.513

LADDER FROM/TO
BRIDGE WALK WAY

RESERVED SPACE FOR


VALVE 10" ESDV-340001 (GPS)
RESERVED SPACE FOR
THIS DRAWING 31

10

VALVE 2" ESDV-340002 (GPS)


2
11
3

12
4
13
5
14
6

15
19
7
16
20
8

RESERVED SPACE FOR


25

RESERVED SPACE FOR


17
21 9
26
18
22
27
32
23
28
24
29

VALVE 2" ESDV-330006 (PHS)


30

VALVE 4" ESDV-500001 (DPS)


RESERVED SPACE FOR RESERVED SPACE FOR
VALVE 8" ESDV-340005 (OCS) VALVE 18" ESDV-330005 (PHS)
FA PLATFORM

VIEW B-B WHP01-PMC1-ASFCZ-01-080701-0001 FA-FC BRIDGE GENERAL VIEW

FC PLATFORM FA PLATFORM WHP01-PMC1-ASFCY-02-190002-0001 FC WELLHEAD PLATFORM PLOT PLAN / LAYOUT SPIDER DECK EL (+) 8.119 TOG
WHP01-PMC1-ASFCY-02-190003-0001 FC WELLHEAD PLATFORM PLOT PLAN / LAYOUT CELLAR DECK EL (+) 13.400
WHP01-PMC1-ASFCY-02-190004-0001 FC WELLHEAD PLATFORM PLOT PLAN / LAYOUT MEZZANINE DECK EL (+) 16.900 T.O.S
100000 (THEORETIC LENGTH BETWEEN SUPPORTS)
B A WHP01-PMC1-ASFCY-02-190005-0001 FC WELLHEAD PLATFORM PLOT PLAN / LAYOUT MAIN DECK EL (+) 22.400
WHP01-PMC1-ASFCY-02-190006-0001 FC WELLHEAD PLATFORM PLOT PLAN/ LAYOUT ACCESS DECK EL (+) 26.000
R3
200
0@ WHP01-PMC1-ASFCY-02-190007-0001 FC WELLHEAD PLATFORM PLOT PLAN / LAYOUT TOP DECK EL (+) 30.000
KO DRUM ACCESS PLATFORM T.O.S EL(+) 15.192 7T
ON
S( WHP01-PMC1-ASFCY-02-190008-0001 FC WELLHEAD PLATFORM PLOT PLAN / LAYOUT ELEVATION VIEW FACING NORTH
5500 5200 1823 3777 5600 11200 83600 MA 5700 4000
X)
WHP01-PMC1-ASFCY-02-190009-0001 FC WELLHEAD PLATFORM PLOT PLAN / LAYOUT ELEVATION VIEW FACING WEST
DROP OBJECT T.O.S EL(+) 19.350
PROTECTION
EXPANSION LOOP EXPANSION LOOP
1850

NOTE 1 NOTE 1

2250
LADDER FROM/TO DROP OBJECT
BRIDGE WALK WAY PROTECTION
ASFCA-V-4010
LADDER FROM/TO
BRIDGE WALK WAY

02 02 02
5000

1
= =

NAME

02 30-Aug-2019 AFC ACCEPTED FOR CONSTRUCTION AV NMT BXL

02
01 17-April-2019 IFA ISSUED FOR ACCEPTANCE NTK NKH RKA / BXL
02
2a 00 07-Jan-19 IFR ISSUED FOR REVIEW NTK NKH RKA / BXL
4000 (TYP.)

1MT LAYDOWN

2600
EXPANSION LOOP EXPANSION LOOP AREA
02 02 2500x2000

2250
NOTE 1 NOTE 1
NAME
02
02
5200 5600 5600 5600 1100 3000 1500 5600 5200

22000
5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 PTSC
PLATFORM FA - NEW BRIDGE LANDING PTSC M&C
SEE DWG : WHP01-PMC1-ASFAA-02-00004-0001

WHP01-PMC1-ASFCZ-02-190001-0001
GALLAF PROJECT - NWHP01- DECKS, BRIDGES AND OFFSHORE INTEGRATION WORKS

VIEW A-A
FA-FC BRIDGE
PLOT PLAN / LAYOUT
ELEVATION EL(+) 16.900

0 10000 20000 LAY YY DE 1

1:200 A1 ASFCZ-02-190001-0001 1 of 1 02