FLOW CHART C2 FRONT SUBFRAME

FLOW CHART HISTORY VERSION DATE VEHICLE REFERENCE PROJECT VERSION PREPARED BY: M.ABRIL
CREATION V27 27/01/2017 JX61 5019 AEB
FOCUS C2 C519 V27
JX61 5019 BEB

INCOMING FOR INCOMING FOR


ASSEMBLY AE ASSEMBLY BE
(LLP BRACKETS)

1. UPPER 2. NUT WELD M8 3. NUT WELD M10 4. ERR REINF. 5. RR-BDY-MNT-REINF 6 ARB-REINF-LH 7. ARB-REINF-RH 8. ERR NUT M12x 1,75
Z520721VTU Z520753VTU EAPIA20V00 EAPIA32V00 EAPIA46V00 EAPIA47V00 Z520515VTU 32 LLP-ATTACH-LH
EAPIA01V00
EBPIA01V00

9. STEERING GEAR NUT 10. TOWER-MAIN-LH 11. TOWER-MAIN-LH 12. PT3-BOSS 13.EAPIA15V00 TOWER- 14. TOWER-CLOSER-RH 15. CAMBER-REINF-LH
33 LLP-ATTACH-RH
M12x 1 ZAPIA17VTU EAPIA13V00 EAPIA14V00 ZAPIA07VPZ CLOSER-LH EAPIA16V00 EAPIA48V00
EBPIA02V00

16. CAMBER-REINF-RH 17. LOWER 18. PT4-UPR-LH 19. PT4-UPR-RH 20. ARB-CRUSH-TUBE 21. PT4-LWR-LH 22. PT4-LWR-RH 34, LLP-LOWER-SUPPORT-LH
EAPIA49V00 EAPIA10V00 EAPIA11V00 EAPIA12V00 ZAPIA36VPZ EAPIA25V00 EAPIA26V00 EBPIA04V00

23. EXH-HNGR-BRKT-LH 24. EXH-HNGR-BRKT-RH 25. BDY-BUSH-TUBE 28 TOWER-BDY-MNT-BRKT-


26. TOWER-SUPPORT 27 TOWER-BDY-MNT-BRKT- 29 RR-BDY-MNT
EAPIA30V00 EAPIA31V00 ZAPIA19VPZ EAPIA17V00 LH RH ZAPIA21VPZ 35 LLP-LOWER-SUPPORT-RH
EAPIA39V00 EAPIA40V00 EBPIA05V00

30 VEH-DYN-BRACE 31 INS-FR TO BDY BRKT 36 NUT-WELD-8MM-HF-THDLS


EAPIA45V00 ZN5A103VPZ Z520782VTU

INCOMING GR CP

WELDING ASSEMBLY LINE 1 AE + BE

Part 10-11 TOWER-MAIN-LH/RH


WORKER 4 Part 12 PT3-BOSS


ARC WELDING →
ARC WELDING
NUTS M12
Part 8 ERR NUT M12 → x 3
ST100 x1 ←Part 1 UPPER ST 20
Part 9 ST GEAR NUT M12 → x 4

Part 13-14 TOWER-CLOSER-LH/RH →

WELD NUTS
M10--M8 Part 2 WELD NUT M8→ x 1 x1 ← Subassembly Part 15-16 CAMBER REINF LH/RH →
Upper +
ST120 NUTS M12
Part 3 WELD NUT M10 → x 4 100%
Visual

WORKER 4
POKAYOKE NUTS
ST122 (Presence) NOK
OK

WORKER 4
ARC WELDING

Sub assembly TOWER LH→


WORKER 1 ST 30
ARC WELDING Part 4 ERR REINF→ X1 Sub assembly TOWER RH→
ST130 Part 5 RR-BDY-MNT REINF → x 4 100%

NOK
NOK
REWORK Rework
PDPR station
WORKER 1
ARC WELDING
Part 6 ARB REINF LH→ x1
ST 140 SCRAP
Part 7 ARB REINF RH→ x1
OK
OK

SUBASSEMBLY:
ARC WELDING UPER
NUTS M12-M10-M8
ST 150 ERR REINF
RR-BDY-MNT-REINFLH/RH
ARB REINF LH/RH
SUB TOWERS LH/RH

POKAYOKE NUTS
ST (Presence)

ST 170
WORKER 7
100%
Visual
NOK
Rework
station
SCRAP
OK

OK

ARC WELDING

ST200

ST210 ASSEMBLY:
UPER ST150 + LOWER

ST250

WORKER 7
Rework / inspection
ST 260
NOK

OK
ARC
WELDING
BRACE
ST265 ASSEMBLY:
UPER ST150 + LOWER

WELD NUTS
2. NUT WELD M8 M8 ST 02
Z520721VTU

21-22. PT4-LWR-RH/LH
ST270 CONVEYOR PT4 + EXH-HNGR-BRKT-LH

23. EXH-HNGR-BRKT-LH 24. EXH-HNGR-BRKT-RH


EAPIA30V00 EAPIA31V00

ARC
WELDING

ST300 ASSEMBLY:
ST265 + PT4 +

25. BDY-BUSH-TUBE

ARC
WELDING
ARC
18- 19. PT4-UPR-LH/RH ARC
WELDING
WELDING ST 10 Phase
ST310 ASSEMBLY: 1
ST300 + PT4 UPPER ST 01

26. TOWER-SUPPORT
X4 20. ARB-CRUSH- 100% Visual
TUBE Check
(worker 2)

ARC
WELDING

ST 10 Phase
2

28 -27
TOWER-BDY- Subassembly ST10
MNT-BRKT- ARC
RH/LH Phase 1
WELDING
ARC
WELDING
ASSEMBLY: ST 01
ST400 ST310 + tower
support ST01 +
100%
RR BDY MNT
NOK
WORKER 2
Sub ST 310 29 RR-BDY-MNT Subassembly tower
ST01
OK

ST 17

ARC
WELDING

ST04
WORKER 5

36 NUT-WELD-8MM-HF-THDLS
Z520782VTU

ARC WELDING

WELDING ASSEMBLY LINE 2


34-35 , LLP-LOWER- 32 -33 LLP-ATTACH-LH/RH
SUPPORT-LH/RH
ST03

WORKER 5

WELDING ASSEMBLY LINE 1

ARC
WELDING

ST410

ARC
WELDING

ST350

ST450 Welding finished

MACHINING
ST 500

WORKER 6

Rework / inspection

ST600 NOK
Rework
station
SCRAP
100% OK
Visual
OK
MARKING
ST

SMART RAY
Final control of the parts with Optical Control System, in
ST order to ensure the proper level of Weld quality

MAPVISION
ST

ST900 POWER AND FREE


CONVEYOR

ST KTL

ST POWER AND FREE


CONVEYOR

BUSHING ZONE 1 BUSHING ZONE 2


ST200 ST200
NOK NOK
Rework Rework
station station
SCRAP SCRAP
OK OK
OK OK

MARKING MARKING
ST250 ST250

ST300
PACKAGING