PH-05 Restoration Bar Chart Nov 2020
PH-05 Restoration Bar Chart Nov 2020
PH-05 Restoration Bar Chart Nov 2020
1 Shifting of all scrap, burnt materials from ph#5 heater area Mr. Sandeep Srivastava
1 Testing of RCC column for strengthen. Mr. Sandeep Srivastava
1 Thermax team has to visit site for coil testing , RCA & coil Mr. Sandeep Srivastava
assessment.
1 Dismantling of existing structure (civil structure and new Mr. Deepak Pant
structure erection)
1 Dismantling of thermic fluid pipeline, furnace structure, PA Mr. Sandeep Srivastava
coil,IBH coil
1 Inspection of, testing of old convective coil Mr. Sandeep Srivastava
1 Dismantling of furnace refractory Mr. Sandeep Srivastava
1 Dismantling of furnace , ash Hooper Mr. Sandeep Srivastava
1 Rebuilding of ash Hooper mainframe in RCC slab Mr. Deepak Pant
Erection activities
1 Conveyor belt installation(BC-2) and trial of conveyor to be Mr. Sandeep Srivastava
taken
1 Screw feeder, charcoal feeder installation,chewt fabrication for Mr. Sandeep Srivastava
husk conveying to furnace to be made
1 Erection of MPA & Convective coil on furnace structure Mr. Sandeep Srivastava
1 Expansion tank valves for de-aeration, makeup and overflow to Mr. Sandeep Srivastava
be replaced
1 Expansion tank level indicator, transmitter to be replaced Mr. Sandeep Srivastava
0 100% -
0 100% -
0 100% - Shifting of refractory bricks a
0 100% -
Sun 9/20/20 Thu 10/15/20 25 100% 19 Pending .
Column
Column strengthening work is Column strengthening work is Column strengthening
strengthening work is
under progress under progress work is under progress
under progress
Work is under
After completion of point no 9 Work is under progress progress Completed
Valve replacement
Valve replacement work is under Valve replacement work is work is under Valve replacement work is
progress under progress under progress
progress
Valve replacement
Valve replacement work is under Valve replacement work is Valve replacement work is
progress under progress work is under under progress
progress
Material awaited Material awaited Material received Material received
Under progress
Status as on Status as on
26/12/2020 12/01/2021
Completed Completed
Completed Completed
Completed Completed
Completed Completed
Completed Completed
Completed Completed
Completed Completed
Completed Completed
Completed Completed
Completed Completed
Completed Completed
Completed Completed
Erection is under
Completed
progress
Under progress
Valve replacement
work is under progress Completed
Under progress
Under progress
Under progress
Bought out Item List PH-
S.No Material Code Material Description Qty Unit
1 3000037056 Convective coil 1 Lot
2 3000039571 Membrane Pannel Assembly 1 Lot
3 3000021154 Bellow Seal Valve 6'' 2 Nos
4 3000021153 Bellow Seal Valve 4'' 2 Nos
5 3000021152 Bellow Seal Valve 3'' 2 Nos
6 3000011878 Bellow Seal Valve 2'' 10 Nos
7 3000011877 Bellow Seal Valve 1'' 30 Nos
8 3000021245 Bellow Seal Valve 1/2'' 50 Nos
11 3000013339 Aluminium Cladding 22 gauge 600 Kg
12 3000029818 FIRE DOOR 480X375 HOLE C/C,PN-PXX0240006 12 nos
13 3000015981 Conveyor Belt 190 mtr
14 3000030301 SCREW GI 8X13MM LONG FOR INSULATION 20 Pkt
15 1000000074 SANTOTHERM-66/THERMINOL-66 76336 KG
16 3000000317 MS Plate 6mm 4 ton
17 3000031651 Conveyor Gearbox 2 nos
18 1000000203 Badarpur Sand 50 ton
19 3000028458 SS rod 6mm dia. 100 Kg
20 3000040151 EGB Damper with actuator 3 nos
21 3000030748 AIR COOLED PACKAGE UNIT 11TR 1 Nos
22 3000017347 Window AC 2TR 1 nos
23 3000031376 Air Nozzle 890 nos
24 3000026652 FIRE BRICKS IS-8 SIZE 230x115x76 MM 22,000 EA
25 3000030107 BRICKS FIRE HA 60% SIZE 230x115x76 MM 3,000 EA
26 3000007884 BRICKS FIRE INSUL. SIZE 230x115x76 MM 9,500 EA
27 3000030108 TILES IS-8 SIZE 457x150x76 MM 6 EA
28 3000030109 TIE BRICK SIZE 230x230x75 MM 135 EA
29 3000030110 BRICKS FIRE S/A 60% SIZE 230x115x76/63MM 238 EA
30 3000030111 BRICKS FIRE S/A 60% SIZE 230x115x76/51MM 76 EA
31 3000030112 BRICKS FIRE SKEW SIZE 115x115x115x60 MM 38 EA
32 3000030113 BRICKS FIRE S/A SIZE 230x115x76/51 MM 28 EA
33 3000030114 BRICKS FIRE S/A SIZE 230x115x76/63 MM 82 EA
34 3000030115 BRICKS FIRE SKEW SIZE 115x115x115x60 MM 80 EA
35 3000030116 BRICKS FIRE E/A HA 60% 230x115x76/63 MM 34 EA
36 3000030117 BRICKS FIRE S/A 60%SIZE 230x115x76/70MM 180 EA
37 3000030118 BRICKS FIRE SKEW SIZE230x230x115x76/63MM 16 EA
38 3000030119 BRICKS FIRE E/A SIZE 230x115x76/63 MM 490 EA
39 3000030120 BRICKS FIRE E/A SIZE 230x115x76/70 MM 1,730 EA
40 3000030121 BRICKS FIRE SKEW SIZE 230x230x115x60 MM 145 EA
41 3000030122 BRICKS FIRE IS-8 MPA SEAL 230x165x76 MM 170 EA
42 3000030123 BRICKS FIRE IS-8 MPA SEAL 115x165x76 MM 170 EA
43 3000030124 CERAMIC BLANKET MAKE LLOYD INSULATION 10 BOX
44 3000026660 MILL BOARD 1 X 1 MTR 5 MM THICK 105 EA
45 3000015981 Conveyor belt 200 mtr
46 3000017792 Vulcanizing Compound 2 Kg
49 3000000357 Bamboo 20feet long 25 Nos
50 3000026671 Challey wooden 20 Nos
51 3000002071 Rope coire(jute) 6 to 10 mm dia 15 Kg
52 3000039572 IBH Assembly 1 EA
53 3000019824 SCREW FEEDER,P240200303,THERMAX 2 EA
54 3000040757 PLENUM CHAMBER,VTAIF100/330 1 EA
55 3000040758 FURNACE STRUCTURE,VTAIF100/330 1 SET
56 3000040759 CHARCOAL/SAND FEEDER,VTAIF100/330 2 EA
57 3000040765 INSTRUMENTATION,HEATER 1 SET
58 3000040766 MCC PANEL&BAG FILTER,VTAIF 100 1 EA
59 3000040767 PLC PANEL,THERMAX,VTAIF 100 UNIT 1 EA
60 3000040768 VALVE,F/INST ISOLATION 1 SET
P.O Value
P.R No P.R Date P.O No Arriving Date
(Rs.)
1000065593 15.06.2020
8000070085 29.03.2020
28,750.00 10.06.2020
20,000.00 10.06.2020
10,700.00 10.06.2020
8,000.00 10.06.2020
22,500.00 10.06.2020
8000070086 29.03.2020 1000065568 12,500.00 10.06.2020
4,550.00 10.06.2020
7,250.00 10.06.2020
4,050.00 10.06.2020
18,450.00 10.06.2020
19,650.00 10.06.2020
2,495.25 05.09.2020
1,527.75 25.07.2020
5,813.10 05.09.2020
8000070165 06.04.2020
Remarks
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Not Received
Not Received
Not Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Not Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Remarks
Conditional assesment of VTAIF - 100
Date 22-Jul-20 Planned
S.no. Activity Start date
1 Ultrasonic thickness testing of convectve coil 1 18-07-2020
2 In situ Metallography of convective coil 1 21-07-2020
3 Hardness testing of convective coil 1 18-07-2020
4 DP testing of convective coil 1 19-07-2020
5 Magnetic particle inspection of convective coil 1 19-07-2020
6 Ultrasonic thickness testing of Outlet Header convectve coil 1 20-07-2020
7 In situ Metallography of Outlet Header convectve coil 1 21-07-2020
8 Ultrasonic thickness testing of convectve coil 2
9 Hardness testing of Outlet Header convectve coil 1 18-07-2020
10 DP testing of Outlet Header convectve coil 1 19-07-2020
11 Magnetic particle inspection of Outlet Header convectve coil 1 19-07-2020
12 Ultrasonic thickness testing of Outlet Header convectve coil 2 24-07-2020
13 In situ Metallography of Outlet Header convectve coil 2 21-07-2020
14 Hardness testing of Outlet Header convectve coil 2 18-07-2020
15 DP testing of Outlet Header convectve coil 2 19-07-2020
16 Magnetic particle inspection of Outlet Header convectve coil 2 19-07-2020
17 In situ Metallography of convectve coil 2 23-07-2020
18 Hardness testing of convectve coil 2 22-07-2020
19 DP testing of convectve coil 2 23-07-2020
20 Magnetic particle inspection of convectve coil 2 24-07-2020
21 Outlet header coil 2 7/23/2020
24 Ultrasonic thickness testing of MPA 23-07-2020
25 Hardness testing of MPA 23-07-2020
26 Destructive testing of MPA 23-07-2020
27 ID fan impeller visual inspection 26-07-2020
28 ID fan impeller hardness testing 26-07-2020
29 ID fan impeller Thickness testing 26-07-2020
30 FD fan impeller visual inspection 26-07-2020
31 FD fan impeller hardness testing 26-07-2020
32 FD fan impeller Thickness testing 26-07-2020
33 ENSG visual inspection 27-07-2020
34 Pnematic testing(inlet + outlet header ) CC 27-07-2020
35 Pre-eliminary report shared by regional team 27-07-2020
36 Conditional assesment report submission by our expert team at HO 05-08-2020
37 Destructive testing of convectve coil 2 23-07-2020
38 Destructive testing of convectve coil 1 23-07-2020
39 Ultrasonic thickness testing of Inlet Header convectve coil 2 24-07-2020
40 In situ Metallography of Inlet Header convectve coil 2 21-07-2020
41 Hardness testing of Inlet Header convectve coil 2 18-07-2020
42 DP testing of Inlet Header convectve coil 2 19-07-2020
43 Magnetic particle inspection of Inlet Header convectve coil 2 19-07-2020
44 Ultrasonic thickness testing of Inlet Header convectve coil 1 24-07-2020
45 In situ Metallography of Inlet Header convectve coil 1 21-07-2020
46 Hardness testing of Inlet Header convectve coil 1 18-07-2020
47 DP testing of Inlet Header convectve coil 1 19-07-2020
48 Magnetic particle inspection of Inlet Header convectve coil 1 19-07-2020
49 Roof coil hardness+thickness of convecting coil -1
50 Roof coil hardness+thickness of convecting coil -2
51 IBH inletfor
DP test and outlet
IBH header
header + MPI(hardness+thickness) test
test+(hardness & Thickness)test of IBH
52 tubes
53 Chimney grinding for inspection and thickness test
54 DP test for convective coil weld section
F - 100
Planned Actual
End date Start date End date
19-07-2020 18-07-2020 19-07-2020
21-07-2020 7/21/2020 7/22/2020
19-07-2020 7/21/2020 7/22/2020
20-07-2020 NA NA
20-07-2020 7/20/2020 7/20/2020
20-07-2020 7/21/2020 7/22/2020
21-07-2020 7/21/2020 7/22/2020
7/24/2020 7/24/2020
19-07-2020 7/22/2020 7/23/2020
20-07-2020 7/22/2020 7/23/2020
20-07-2020 7/22/2020 7/23/2020
24-07-2020 7/22/2020 7/23/2020
21-07-2020 7/21/2020 7/22/2020
19-07-2020 7/21/2020 7/22/2020
20-07-2020 7/22/2020 7/23/2020
20-07-2020 20-07-2020 20-07-2020
23-07-2020 7/24/2020 7/24/2020
23-07-2020 7/23/2020 24-07-2020
24-07-2020 NA NA
24-07-2020 7/22/2020 7/22/2020
24-07-2020 7/21/2020 20-07-2020
23-07-2020 7/28/2020 7/29/2020
23-07-2020 7/28/2020 7/29/2020
23-07-2020 NA NA
26-07-2020 NA NA
26-07-2020 NA NA
26-07-2020 NA NA
26-07-2020 NA NA
26-07-2020 NA NA
26-07-2020 NA NA
27-07-2020 NA NA
27-07-2020 7/26/2020 7/26/2020
27-07-2020
05-08-2020
26-07-2020 NA NA
25-07-2020 NA NA
24-07-2020 7/25/2020 7/25/2020
21-07-2020 7/25/2020 7/25/2020
19-07-2020 7/25/2020 7/25/2020
20-07-2020 7/25/2020 7/25/2020
20-07-2020 7/25/2020 7/25/2020
24-07-2020 7/25/2020 7/25/2020
21-07-2020 7/25/2020 7/25/2020
19-07-2020 7/25/2020 7/25/2020
20-07-2020 7/25/2020 7/25/2020
20-07-2020 7/25/2020 7/25/2020
7/25/2020 7/25/2020
7/25/2020 7/25/2020
7/26/2020 7/27/2020
7/27/2020 7/27/2020
7/28/2020 7/29/2020
7/29/2020 7/29/2020
Date: 12/01/21
PH#5 -Pending Bullet Points
Target
Sr No Description date
1 Expansion tank platform 15/01/21
2 Building roof sheet fixing 17/01/21
Control room window , door &
3 painting 17/01/21
5 Control room tile installation 20/01/21
6 Heater room flooring 20/01/21
Civil scrap & unwanted civil
7 materials shifting 25/01/21
Main incomer termination from
8 pump room to panel room 13/01/21
ID , FD -2 Nos, RAV-2 Nos, FP, husk
feeder cable laying and
9 termination. 15/01/21
Earthing pit construction &
10 termination for PLC & MCC 16/01/21
False ceiling & Lighting for control
11 room & building shed 18/01/21
DP switch installation for
convective, MPA & IBH coil ( 30
12 Nos) 21/01/21
DP pipe line tapping for
convective coil, IBH, MPA header
13 (30 nos) 18/01/21
Flow transmitter fitment in main
14 line & IBH by pass line. 19/01/21
Main line flow transmitter orifice
15 relocation as per new drg 19/01/21
PT pipe line laying at main heater
16 outlet line 19/01/21
PT fitment in main heater outlet
17 line 22/01/21
RTD instrument fitting ( HTM inlet,
outlet, convective coil both outlet,
18 APH inlet, bag filter outlet. 22/01/21
Both Bed thermocouple fitment &
19 cable laying, termination 23/01/21
FD fan 1,&2- Damper cylinder
fitment/ mounting, cabling,
20 termination
ID fan inlet pressure switch 23/01/21
21 fitment 23/01/21
Screw feeder sensor fitment &
22 cabling 23/01/21
23 Flue gas all three damper cabling. 24/01/21
Expansion tank level transmitter &
24 level switch fitment 24/01/21
Expansion tank level transmitter &
level switch cable laying and
25 termination 24/01/21
26 Refractory work installation 22/01/21
27 Refractory
Radiography dryofcuring
the pipe lines 25/01/21
28 joints
29 Flushing of the pipe lines 15/01/21
30 Pneumatic testing 19/01/21
4 Building structure room painting 15/01/21
25 & 26 /
31 HTM filling and circulation. 01/21
27 to
32 Slow firing 30/1/21
33 Heater will be taken in line 31/01/21