Flight Plan Vision: A More Capable and Credible Air Force Responsive to National Security and Development

A. AEB DESIRED PROCESSING/EXECUTION TIMELINES FOR VALIDATION

NO. OF CALENDAR DAYS / PROJECT COST MANPOWER REQUIREMENTS


ACTIVITY PhP1M - PhP11M – PhP50M and
ACTUAL DESIRED
PhP10M PhP50M Above
1. Check the
completeness and Admin NCOIC – 1 Admin NCOIC – 1
1 CD 2 CD 3 CD 2 2
receive the request Admin App – 1 Admin App – 1
from Admin Branch.
Architect – 1
Architect – 1
Civil Engineer – 1
14 CD 28 CD 42 CD 4 Structural Engineer – 1
2. Evaluation/ validation Electrical Engineer – 1
Electrical Engineer – 1
of submitted DAEP, Master Plumber – 1
Mechanical Engineer – 1
BOME, SOW, 7
Master Plumber – 1
Timeline, S-Curve, (Additional Manpower)
Electronics and
and PERT-CPM. +14 CD +28 CD +42 CD Sanitary -1 3
Communications Engr – 1
Mechanical - 1
Sanitary Engineer - 1
ECE -1
Architect – 1
Structural Engineer – 1
Electrical Engineer – 1
Architect – 1
Mechanical Engineer – 1
Civil Engineer – 1
Master Plumber – 1
3. Approval (signing & Electrical Engineer – 1
3 CD 4 CD 5 CD 6 Electronics and 9
sealing of plans) Master Plumber – 1
Communications Engr – 1
C, AEB - 1
Sanitary Engineer – 1
AAFCE - 1
C, AEB - 1
AFCE - 1
AAFCE -1
AFCE - 1
4. Draft STL for the
lower unit with the
1 CD Admin – 1 1 Admin – 1 1
attached validation 2 CD 3 CD
remarks.
TOTAL 18 CD 36 CD 53 CD 13 19
Flight Plan Vision: A More Capable and Credible Air Force Responsive to National Security and Development

* Note: No. of calendar days may vary based on project cost and manpower requirements identified during checking of completeness
and acceptance of the request.

Prepared by: Certified by:

EULYSSES M MERCADO PIO C GOMEZ


Major PAF Colonel PAF (GSC)
Chief, Arch’l and Eng’g Br Air Force Chief of Engineers