Estimate For OFFICE BUILDING 3rd-NEW RATE Corrected
Estimate For OFFICE BUILDING 3rd-NEW RATE Corrected
First floor :
Column : 8 0.25 0.25 3.00 1.50 m3
Lintel : 1 28.50 0.125 0.15 0.53 m3
Roof beam : 1 36.80 0.25 0.250 2.30 m3
Chajja : 4 1.50 0.45 0.075 0.20 m3
Roof Slab : 1 10.90 5.65 0.125 7.70 m3
12.24 m3 @ Rs. 5427.23 66402.16
10 Reinforcement for reinforced concrete work
in the all sorts of structures including
distribution bars, stirrups, binders etc.
including supply of rods, initial
straightening and removal of loose rust (if
necessary), cutting to requisite length,
hooking and bending to correct shape,
placing in proper position and binding with
16 gauge black annealed wire at every
inter-section, complete as per drawing and
direction.
(a) For works in foundation basement and
upto roof of ground fllor/ upto 4 m.
(As per P.W.D. Schedule vide Pg-65,no-15)
(i) Tor Steel / Mild Steel.
( 34.00 x 1.50 x 7850 ) / 100 4002.98 kg
Say 4003.00 kg
4.003 MT @ Rs. 55888.86 223723.11
11 Hire & Labour charges for shuttering with
centering and necessary staging upto 4m
using approved stout props and thick hard
wood planks of approved thickness with
required bracing for concrete slab, beams,
columns, lintel curved or straight including
fitting, fixing and striking out after
completion of works.(upto roof of ground
floor.)
a) 25 mm to 30 mm thick wooden
shuttering as per decision & direction of
Engineer-in-Charge.
(As per P.W.D. Schedule vide Pg-7,no-6)
(a) In foundation footing :
8 6.00 0.250 12.00 m2
8 1.00 0.725 5.80 m2
17.80 m2 @ Rs. 162.42 2891.08
First Floor :
Column : 8 3.00 1.00 24.00 m2
Roof beam : 1 36.80 0.90 33.12 m2
Roof Slab : 1 10.90 5.65 61.59 m2
Lintel : 1 28.50 0.30 8.55 m2
Chajja : 4 1.50 0.45 2.70 m2
129.96 m2 @ Rs. 267.33 34740.87
35mm thick. Ground Floor : 1 9.75 3.75 36.56 m2 @ Rs. 248.89 9100.04
Total : 702570.47
Estimate is prepared on the basis of P.W.D.(W.B.) Schedule of rate for Building works, effective during the Financial Year
2010-2011
1 2220.00
2 15390.52
3 286.91
4 5149.02
6 18229.63
7 931.52
8 43726.95
9 9548.67
10 11395.30
12 116818.65
13 66402.16
14 223723.11
17 34740.87
18 15481.04
19 14813.55
20 28487.05
21 9100.04
22 12035.76
23 0.00
24 566.60
25 #REF!
26 1920.31
27 1689.97
28 0.00
29 0.00
30 0.00
31 0.00
32 0.00
33 0.00
34 0.00
35 0.00
36 0.00
37 0.00
38 0.00
39 0.00
40 0.00
41 0.00
42 0.00
43 0.00
44 0.00
Total Rs. #REF!
Total concrete (1:2:4) 21.76
12.24
34.00
125
P.L.
4 nos. 16mm O
3000
600
G.L.
6mm O
Door & Window
125 4 nos. 12mm O @ 150 c/c 725
Schedule
1500
3000
8mm O @ 200 C/C
350 Door : 1200 x 2100
P.L. 12mm O
@ 125 c/c 250
100
G.L. 75
Window : 1200 x1200
1500
Front Elevation
( Not to Scale ) Column Section
( Not to Scale )
P.L.
250 125
600
4 nos. 12mm O
6625 x 3750
4000
3000x3750 G.L.
4 nos.
300
12mm O 250
450
D D D 75
75
1200
Verandah
375 C/S of Roof Beam
10000 C/S of Wall Foundation ( Not to Scale )
( Not to Scale )
Plan
( Not to Scale )
Drawn by