RQM-Report-MiddingPasu-Lower Subansiri-Arunachal Pradesh
RQM-Report-MiddingPasu-Lower Subansiri-Arunachal Pradesh
Submitted to
REC Limited
(A Government of India Enterprises)
Regd. Office: Core-4, SCOPE Complex, 7, Lodhi Road,
New Delhi – 110003
January 2021
Contents
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
1. INTRODUCTION &BACKGROUND.....................................................................................................4
2. APPROACH& METHODOLOGY.........................................................................................................5
3. INSPECTION NOTICE ISSUED BY REC................................................................................................5
4. BRIEF PROFILES:...............................................................................................................................6
4.1 Brief profile of Inspecting Officer:................................................................................................6
4.2 Reviewer of Inspection Report....................................................................................................6
4.3 Finalizer of Inspection Report......................................................................................................6
5. TECHNICAL DETAILS OF THE INSTALLED STANDALONE SYSTEMS....................................................7
6. KONTIIVILLAGE DETAILS...................................................................................................................8
7. GOOGLE MAP LOCATION OF THE BLOCK & INSPECTING PERSON PHOTOGRAPH...........................9
8. DETAILS OF THE MATERIAL INSTALLED AND MAINTAINACE ACTIVITIES........................................10
9. ONSITE OBSERVATIONS.................................................................................................................11
10. FIELD INSPECTION CHECKLIST........................................................................................................11
11. CONSUMER FEEDBACK..................................................................................................................15
12. DETAILS OF DEFECTS AND PHOTOGRAPHS....................................................................................15
12.1 DEFECTS PHOTOGRAPHS...........................................................................................................16
13. SITE VIST PHOTOGRAPHS...............................................................................................................17
14. LIST OF BENEFICIARY.....................................................................................................................23
List of Figures
Figure 1 : Single line Diagram......................................................................................................................7
Figure 2 : Google Map Location of the Block...............................................................................................9
Figure 3 : Inspecting Person photograph...................................................................................................10
Figure 4 ..Beneficiary Household was found locked & only MMS Pole found...........................................17
Figure 5 ..Panel was installed over MMS support......................................................................................17
Figure 6 .. MMS pole was found with proper cement grouting.................................................................18
Figure 7 ..Solar PV Panel termination of cables from Pane........................................................................18
Figure 8 ..Solar PV Panel specification details& termination of cables from Panel....................................19
Figure 9 ..Beneficiary Household was found locked ,solar panel was inst.................................................19
2
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
Figure 10 ..Inspecting officer standing infront of Solar PV Panel installed over MMS Support.................20
Figure 11 .. Solar PV Panel was installed over MMS Pole..........................................................................20
Figure 12 ..Beneficiary household was found locked.................................................................................21
Figure 13 ..Beneficiary Household was found locked, solar panel was installed.......................................22
Figure 14 ..beneficiary migrated , only MMS Pole found...........................................................................22
Figure 15 : Village Site view.......................................................................................................................23
List of Tables
Table 1 : Village Details under assessment..................................................................................................8
Table 2 : Details of the Material Installed..................................................................................................10
Table 3 : Onsite Observation.....................................................................................................................11
Table 4 : Field Inspection Checklist............................................................................................................11
Table 5 : Consumer’s Feedback.................................................................................................................15
Table 6 : List of defects..............................................................................................................................15
Table 7 : List of beneficiary........................................................................................................................23
3
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
In order to execute DDUGJY project at various locations in the State of Arunachal Pradesh, SECI had
floated tender for Supply, Installation, Testing and Commissioning of such systems including Insurance,
Warranty, Spare Parts and Operation & Maintenance. Subsequent to the successful tendering process,
following Contractor was awarded the contract to execute the Project.
TÜV SÜD South Asia Pvt. Ltd. has been appointed as ‘REC Quality Monitor for Decentralized Distribution
Generation Projects under DDUGJY’ vides Letter of Award dated October 23, 2019. As per LOA, TÜV SÜD
shall envisage Quality Assurance Mechanism (QAM) for the DDG projects as REC Quality Monitors (RQM)
on behalf of REC.
4
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
TUV SUD Inspection engineers are visiting each village’s and verifying all components of installed
standalone system and communicating with beneficiaries regarding working status of system. If any
problem is observed during site visit, same has been presented in report.
5
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
4. BRIEF PROFILES:
Brief summary of Inspection officer, Reviewer and finalizer of the report are provided in this section.
6
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
7
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
Sr.
Particulars Details
No.
1 Village Midding Pasu
2 Block Ziro – l
3 District Lower Subansiri
4 State Arunachal Pradesh
5 Census Code 264691
6 Scheme DDUGJY-NEW
BPL/APL Total
7 Total No. of House Holds / Standalone Systems
05 05
8 Type of System Installed Stand Alone
9 Aggregate Capacity of Stand Alone 0.96 kWp
Brief Note on Village : The Census code of Midding Pasu Village is 264691. Midding Pasu in Ziro-l block
of Lower Subansiri district of Arunachal Pradesh. There were total 05 households. The total connected
load provided per household is 50 W. A standalone system has been installed Under Deen Dayal
Upadhyay Gram Jyoti Yojana to meet electricity demand of the village.
8
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
9
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
As shown in above table, total Standalone System sanctioned/approved for the village are 05. In which
03 of the households were locked only Panel found outside rest 02 household beneficiary relocated with
system only MMS pole found.
10
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
9. ONSITE OBSERVATIONS
Table 3 : Onsite Observation
2 Charge controller
3 Battery
6 System Running
Status
UoM/
Sr.N
Item/Parameter Response Response
o
Type
DC Side of Standalone System
05
1 Total no. of Solar Modules Nos 03(Locked)
02(Migrated)
2 Capacity of each Solar Module Wp 320
3 Total capacity Wp 1600
4 Name of Manufacturer of Solar Module Name NAVITAS-SOLAR
5 Photograph of name plate of module (1 sample) Photograph Yes,Figure-8
11
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
UoM/
Sr.N
Item/Parameter Response Response
o
Type
6 Whether any snail trails/cracks can be observed on solar cells? Yes/No No
Taken
photographs of
7 Sample photograph of cell cracks/snail trails Photograph
the Panels but no
cracks were found
Whether panels/modules are found clean and maintained
No, Cleaned & no
8 condition at time of inspection? Is there any vegetation Yes/No
Vegetation found
growing around the panels?
9 Whether panels/modules are easily accessible for cleaning? Yes/No No
10 Photograph of the dirty modules (For cleanliness aspect) Photograph No
Photograph of any major shadow on the modules at the time
11 Photograph No
of inspection
Check direction of panel (write correct direction) aligned with
12 Yes/No South Direction
sun-rays
Provision of movement of panel – mechanical provisions (not
13 Yes/No No
automatic to set direction of panel)
14 Photograph of steel structure holding solar panel Photograph Yes
Photographs of cable termination and inside of the junction
15 Photograph
box.
Out of 05 no’s of
Photograph of cable route between panel and inverter/battery systems
16 Photograph
showing dressing of cable with structure. Sanctioned/installe
Check foundation of steel structure as per approved drawing. d, 03 of the
17 Yes/No
Describe discrepancy if any households were
Whether systems are operating or not? In case of standalone locked on one was
18 found only Panel
systems, mention % systems in operation.
found over MMS
support, remaining
02 household
In case systems are not in operation, mention tentative period beneficiary
19
from which they are not in operation migrated/relocated
with system only
MMS Support found
Batteries for Stand Alone System
20 How many batteries are connected Nos
21 Capacity of single battery Ah
22 Nominal Voltage of single battery V
23 Type of Battery (Lithium Ferro phosphate/Lithium ion/Lead Type Out of 05 no’s of
12
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
UoM/
Sr.N
Item/Parameter Response Response
o
Type
Acid/Sealed Gel battery)
24 Photograph of battery specification/model sheet Photograph
Whether proper arrangement is made for mounting batteries?
25 Yes/No
(Eg. Battery stand), take photo.
Yes/No and
26 Check capacity of individual battery
specified
27 Calculate overall capacity of battery bank Yes/No systems
Check and review pre-dispatch inspection report of Sanctioned/installe
28 Yes/No d, 03 of the
battery/battery bank, give comments after cross verification
households were
29 Battery bank Photograph locked on one was
found only Panel
Yes/No
30 Voltage v/s % battery charging found over MMS
V support, remaining
Households(HHs) Connection
05
How many connections are provided in the village? Nos 03(Locked)
31 02(Migrated)
32 Whether each Household is metered? Yes/No
33 Whether each household’s meter is earthed properly? Yes/No
34 Whether Proper home wiring is done for each Household? Yes/No
If “No” for above points, then no. of HHs where
Nos Out of 05 no’s of
35 connections/Earthling/metering not done properly
systems
Type and size of PVC pipe/GI pipe support is not as per Yes/No Sanctioned/installe
39 specification d, 03 of the
Household has been provided with internal house wiring and Yes/No households were
accessories between switch board and Angle Holder as per locked on one was
40 specifications found only Panel
found over MMS
Proper ground clearance of service line as per the guidelines Yes/No support, remaining
41
02 household
Proper tensioning of service cable at consumer premises Yes/No beneficiary
42
Check and record wattage of LED lamp provided at consumer migrated/relocated
Yes/No with system only
43 premises
MMS Support found
All the construction activities related to power supply in the
44 households have been performed as per REC construction Yes/No
standards.
General Parameters
13
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
UoM/
Sr.N
Item/Parameter Response Response
o
Type
45 Whether data logger is installed? Yes/No
If yes for above point, then Daily generation at the day of
46 kWh
inspection
47 Monthly generation of current/previous month kWh
Average no. of hours of power supply per day to the
48 No of hrs Out of 05 no’s of
beneficiaries
Whether any customer care number has been provided to systems
Sanctioned/installe
49 beneficiary for complaint registration, if yes provide the Yes/No
d, 03 of the
contact number.
households were
50 No. of HHs not getting electricity due to system failure Nos locked on one was
51 Date of installation Date found only Panel
52 Date of commissioning Date found over MMS
53 No. of Street lights installed Nos support, remaining
02 household
54 Whether installation of Street lights is proper Yes/No
beneficiary
55 Photograph of the complete structure of street light Photograph migrated/relocated
56 Whether all street lights are glowing/working properly Yes/No with system only
Take Copy of design calculation of capacity of battery bank and MMS Support found
57 Yes/No
panel.
If it is “No” for above parameter, then no. of Street lights not
58 Nos
working
Check Protection system on DC and AC network in the control
59 photograph
room.
Distance of nearby grid connectivity from the inspected
60 In km 1 km
village/habitation.
Any household connected with grid connection in the
61 Yes/No No
inspected village? If Yes, details.
14
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
1. PV Module/Panel
2. Household Appliances
3. Household Wiring
5. Charge Controller
7. Total defects
Note:Defects not found as the all the consumer’s house were found Locked .
15
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
Figure 4 ..Beneficiary Household was found locked & only MMS Pole found
16
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
17
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
Figure 9 ..Beneficiary Household was found locked ,solar panel was inst
18
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
Figure 10 ..Inspecting officer standing infront of Solar PV Panel installed over MMS Support
19
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
20
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
Figure 13 ..Beneficiary Household was found locked, solar panel was installed
21
QUALITY MONITORING REPORT FOR DECENTRALIZED DISTRIBUTION GENERATION PROJECT UNDER
DDUGJY AT VILLAGE :MIDDING PASU , DISTRICT LOWER SUBANSIRI, ARUNACHAL PRADESH
22