Subject:- Running Account Bill 05 for RCC Construction Work of PD Building Level 05, 06 & 07
(Phase 2 Work)
P. O. No. :- 940078335 Date:- January 18, 2021
Vendor code : IN30000859_IN10
SUMMARY SHEET OF FINAL BILL

TOTAL
DESCRIPTION
AMOUNT
Construction of PD Building Level 05, 06 & 07
#REF! (A)
(Inclusive of GST)
GST Breakup
SGST 9% ( 9% of A) #REF!
SGST 9% ( 9% of A) #REF!

HSN/SAC NO:- 995453


PAN No. : ACBPJ4374P
GST NO:- 27ACBPJ4374P1Z5

For Gubbi Civil Engineers

Authorised Signatory.
Project : Phonix - Higi Revamp Phase- 2 at Johnson And Johnson Pvt Ltd, Mulund, Mumbai

Construction of PD Building
Package :
Level 05, 06 & 07
ANNEXURE A - PO ABSTRACT SHEET (AS PER PO)

ORIGINAL CONTRACT PREVIOUS CLAIM CURRENT CLAIM CUMULATIVE CLAIM


Item No DESCRIPTION UNIT RATE REMARK
QTY AMOUNT QTY % AMOUNT % QTY % AMOUNT % QTY % AMOUNT %
(IN INR)

Construction of PD Building Level 05, 06 &


A 1.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
07

GRAND TOTAL (Including Taxes) #REF! #REF! #REF! #REF! #REF! #REF!
Project : Phonix - Higi Revamp Phase- 2 at Johnson And Johnson Pvt Ltd, Mulund, Mumbai

Construction of PD Building
PACKAGE :
Level 05, 06 & 07
BILL OF QUANTITY

ORIGINAL CONTRACT PREVIOUS CLAIM CURRENT CLAIM CUMMULATIVE CLAIM


Sr. No Item Code DESCRIPTION UNIT RATE % % % REMARK
QTY AMOUNT QTY AMOUNT % QTY AMOUNT % QTY AMOUNT %
(IN INR) CLAIM CLAIM CLAIM

Section 3.0 Concrete and Allied Works


Note : 1.The rates for all items covered in this section shall
include cost of dewatering, if requird till completion of works
up to ground level and chamfers in RCC works shall be
shall be provided wherever required at no extra cost
to the owner.
2. The rate also includes cost of providing offsets cutouts
pockets construction joints, making holes in or cutting
formwork for taking out dowel bars, hacking the exposed
necessary.
3. No extra will be paid if nominal mix is used instead of
design mix.
4. Q.R.O. - Quote Rate Only

1 0301001 Providing and laying plain cement concrete


(nominal mix) using specified graded coarse
aggregate of approved quality at various
locations etc. machine mixing, consolidating
with rammer/ vibrators, curing, providing
scaffolding, staging etc. complete as directed
and instructed by Engineer. (Form work
shall be paid separately under relevant item).

1.1 0301001a - do - with 1:4:8 grade concrete using 40 mm Cum QRO 6,930.00 #VALUE! - - - -
maximum size and down graded aggregate
below foundations, base slab, plinth beams, walls etc.

1.2 0301001b - do - with 1:3:6 grade concrete using 25 mm Cum QRO 7,425.00 #VALUE! - - - -
maximum size and down graded aggregate in
flooring, pavement ramp etc.

1.3 0301001c - do - with 1:2:4 grade concrete with 20 mm Cum QRO 8,415.00 #VALUE! - - - -
maximum size and down graded aggregate in
copings, sills, etc.

2 0301004 Concrete for RCC works at all levels and locations


above plinth for all structures, pedestals
equipment foundations, columns ,beams
floors, slabs, roof slabs, sunshades,lintels,
staircases, fins, chajjas, pardis, sills copings
projections, column/beam encasements etc.

2.1 0301004a Grade M15 concrete. (240 kg of cement / m3) Cum QRO 7,920.00 #VALUE! - - - -

2.2 0301004b Grade M20 concrete. (280 kg of cement / m3) Cum QRO 8,712.00 #VALUE! - - - -

2.3 0301004c Grade M25 concrete (320 kg of cement / m3) Cum 71.0 9,900.00 702,900.00 - - - -

Grade M30 concrete (360 kg of cement / m3) (Optional to


2.4 0301004d Cum QRO 11,385.00 #VALUE! - - - -
Grade M25)
Project : Phonix - Higi Revamp Phase- 2 at Johnson And Johnson Pvt Ltd, Mulund, Mumbai

Construction of PD Building
PACKAGE :
Level 05, 06 & 07
BILL OF QUANTITY

ORIGINAL CONTRACT PREVIOUS CLAIM CURRENT CLAIM CUMMULATIVE CLAIM


Sr. No Item Code DESCRIPTION UNIT RATE % % % REMARK
QTY AMOUNT QTY AMOUNT % QTY AMOUNT % QTY AMOUNT %
(IN INR) CLAIM CLAIM CLAIM

3 0301005 Extra item using RMC instead of Site Mix against item 4.0
manufactured in fully automatic batching plant and
transported to

site of work in transit mixer having continuous agitator mixer


manufactued as per mix design of specified grade for RCC
work

including pumping of RMC from transit mixer to site of laying

excluding the cost of centering, shuttering and reinforcement

including the cost of addmixer and recommended proportion


as

per IS:9103 to accelerate / retard setting of concrete, improve

workability without impairing strength and durability as per


direction
of the engineer in-charge including machine vibrating,
leveling, curing etc.
complete. Rate shall be inclusive of transporting of concrete
from Ground to
respective floor level with the help of concrete pump and
requisiting piping
arrangement.

3.1 0301005a Grade M15 concrete. (240 kg of cement / m3) Cum QRO 8,910.00 #VALUE! - - - -

3.2 0301005b Grade M20 concrete. (280 kg of cement / m3) Cum QRO 9,157.50 #VALUE! - - - -

3.3 0301005c Grade M25 concrete (320 kg of cement / m3) Cum 176.9 9,900.00 1,750,983.37 164.68 100% 1,630,360.66 93% 83.43 100% 825,931.76 248.11 140% 2,456,292.41 140% -71.24
-
4 301006 Grade M20 concrete for water tanks, Cum QRO 12,375.00 #VALUE! - - - - #VALUE!
pit, basins, sumps/sump pits, manholes etc -
including addition of waterproofing -
compound of FOSROC-CONBLAST-X4211C- or -
equivalent approved make,including pressure -
cement grouting of mix 1:1 at construction joints, -
weak spot/honeycombs and testing the same -
for water tightness as per requirement of IS 3370 -
and making good defects/leakages as instructed -
by Engineer/Owner.(Rate also to include cost of -
water proofing compound, testing and rectification -
of leakage etc. for all levels and heights -
-
5 0301007 Providing, erecting and removing form-work/shuttering Sqm QRO 643.50 #VALUE! - - - - #VALUE!
for concrete items, as per specifications, and including -
specification on striking the form work etc. complete all -
as shown on drawings or as directed by Engineer/Owner.
-
Rate shall be
inclusive of required stagging and or scaffolding. -
(Net area of concrete formed will be measured) -
-
5.1 0301007a Ordinary form work above plinth level Sqm 967.7 643.50 622,718.33 636.13 100% 409,350.19 66% 573.87 100% 369,286.41 1,210.00 125% 778,636.59 125% -242.30
-
5.2 0301007c Ordinary Form work for circular or curved Sqm QRO 990.00 #VALUE! - - - - #VALUE!
concrete surface. -
-
Project : Phonix - Higi Revamp Phase- 2 at Johnson And Johnson Pvt Ltd, Mulund, Mumbai

Construction of PD Building
PACKAGE :
Level 05, 06 & 07
BILL OF QUANTITY

ORIGINAL CONTRACT PREVIOUS CLAIM CURRENT CLAIM CUMMULATIVE CLAIM


Sr. No Item Code DESCRIPTION UNIT RATE % % % REMARK
QTY AMOUNT QTY AMOUNT % QTY AMOUNT % QTY AMOUNT %
(IN INR) CLAIM CLAIM CLAIM

6 0301008 Providing, laying & fixing in position -


reinforcement as per drawings at all locations -
and levels including preparation of bar -
bending schedules and obtaining their approval from -
Owner/Engineer,cutting, bending and binding -
with 16 G MS annealed binding wire including -
placing proper concrete cover blocks, chair -
supports etc complete as specified and -
directed by Engineer/Owner. -
-
NOTE : The rate shall include for cost of -
supplying binding wires, concrete cover blocks etc. -
-
6.1 0301008b High yield deformed bars. MT 16.7 108,900.00 1,821,348.39 16.72 100% 1,821,062.96 100% 13.555 100% 1,476,156.14 30.28 181% 3,297,219.10 181% -13.55
-
7 03010010 Providing, fabricating and fixing in position -
at required locations to correct lines and -
levels, angles, inserts, pipe sleeves, anchor -
bolts for columns, floors, machine foundations, -
cable trenches and all types of RCC, PCC & -
masonry including necessary welding, -
machining, grinding, threading etc. Rate shall -
include providing, making and positioning -
templates. (All materials including plates, pipes, -
steel & accessories required including required stagging /
-
scaffolding shall be
provided by Contractor). -
-
Anchor bolts and assemblies without pipe sleeves supplied by
7.1 03010010a MT QRO 173,250.00 #VALUE! - - - - #VALUE!
PEB vendor
-
7.2 03010010b Anchor bolt assemblies with pipe sleeves, plates, etc. MT 1.4 163,350.00 229,408.74 - - - 0% - 0% 1.40
-
7.3 03010010c Plate inserts including hold fasts. MT 4.2 148,500.00 623,700.00 0.0569 100% 8,444.90 - 0.057 8,444.90 4.14
-
7.4 03010010d M.S. pipe sleeves with necessary flanges, MT 1.0 148,500.00 148,500.00 - - - - 1.00
puddle flanges etc. -
-
7.5 03010010f Edge protection angles including hold fasts. MT 0.3 163,350.00 49,005.00 - - - - 0.30
-
7.6 03010010g G.I. pipe sleeves 50 mm dia "B" class. RM 20.0 643.50 12,870.00 - - - - 20.00
-
7.7 03010010h PVC pipe sleeves 100 mm dia (4 kg/cm2quality). RM QRO 198.00 #VALUE! - - - - #VALUE!
-
7.8 03010010i PVC pipe sleeves 150 mm dia (4 kg/cm2quality). RM QRO 544.50 #VALUE! - - - - #VALUE!
-
7.9 03010010j PVC pipe sleeves 200 mm dia (4 kg/cm2quality). RM QRO 643.50 #VALUE! - - - - #VALUE!
-
7.1 03010010k HDPE pipe sleeves 150 mm dia(4 kg/cm2 quality) Nos. 5.0 990.00 4,950.00 - - - - 5.00
lengths not exceeding 1 m with HDPE puddle flange -
and mating flange at both ends. -
-
Project : Phonix - Higi Revamp Phase- 2 at Johnson And Johnson Pvt Ltd, Mulund, Mumbai

Construction of PD Building
PACKAGE :
Level 05, 06 & 07
BILL OF QUANTITY

ORIGINAL CONTRACT PREVIOUS CLAIM CURRENT CLAIM CUMMULATIVE CLAIM


Sr. No Item Code DESCRIPTION UNIT RATE % % % REMARK
QTY AMOUNT QTY AMOUNT % QTY AMOUNT % QTY AMOUNT %
(IN INR) CLAIM CLAIM CLAIM

7.11 03010010l HDPE pipe sleeves 200 mm dia(4 kg/cm2 quality) Nos. 5.0 1,633.50 8,167.50 - - - - 5.00
lengths not exceeding 1 m with HDPE puddle flange -
and mating flange at both ends. -
-
8 03010011 Providing & laying grout with ACC 'Shrincomp' compound Cum 0.7 118,800.00 83,160.00 - 0.12 100% 13,751.10 0.12 100% 13,751.10 0.58
or approved equivalent non shrink compound under base -
plates, in pockets etc. all as per manufacturer's -
specification and approved by Engineer/Owner. Rate shall be
-
inclusive of

required shuttering / form work, scaffolding, etc. complete. -


-
9 0301021 Providing & applying epoxy bonding agent bondcrete or Kg. 5.0 841.50 4,207.50 5 100% 4,207.50 17.00 100% 14,305.50 22 100% 18,513.00 -17.00
equivalent make between old concrete to new concrete -
including preparation of surface at levels complete as per -
manufacturer's specification & as directed & instructed by -
Engineer/Owner. -
-
-
Providing and fixing reinforcement using HILTI Chemical (RE
10 301023 -
500)
including drilling holes for dowels bars 1.0 M length tor steel
-
bars,
making hole dia as per requirements, depth of holes and
-
chemical
grouting, pull out testing required, as per manufacturers -
specification and as directed. -
(Steel bar weight shall be considering in reinforcement item) -
(a) Dowels 16 mm Dia bar with and 160mm depth No. 20 544.50 10,890.00 20 100% 10,890.00 52.00 100% 28,314.00 260% 72 100% 39,204.00 -52.00
(b) Dowels 20 mm Dia bar and 200mm depth No. 452 742.50 335,610.00 - 0% 23 100% 17,077.50 5% 23 5% 17,077.50 5% 429.00

(c) Dowels 25 mm Dia bar and 200mm depth No. 48 990.00 47,520.00 - 0% - 0% - 0% - 0% 48.00

-
Sub Total Section 3 6,455,938.82 3,884,316 2,744,822 6,629,139 -
-
Section 5 : Structural Steel and Allied Works -
-
1 0500001 Providing fabricating, welding and/ MT QRO 173,250.00 #VALUE! - - - - #VALUE!
or bolting, as required, erecting -
and fixing in position all types of -
structural steel works viz columns -
beams,monorails,rafters,trusses, -
purlins,frame for louvers,bracing, equipment -
supports. ladders & cage ladders,sag rods -
pipe & cable racks, pipe bridges,etc -
(except checkered plates,grating & pipe -
railing only) made up of rolled or built up -
sections with moment or shear -
connections, shop/site fabricated including -
all accessories viz nuts, bolts, cleats, -
gussets, suspenders etc as per -
specification complete as directed by -
Engineer/Owner. The rate to include for -
welding weights,site connection, nut & -
bolts, scaffolding, working platform, etc and -
same will not be measured for payment. -
(Painting & sand blasting shall be paid -
separately under relevant item.) The rate -
Project : Phonix - Higi Revamp Phase- 2 at Johnson And Johnson Pvt Ltd, Mulund, Mumbai

Construction of PD Building
PACKAGE :
Level 05, 06 & 07
BILL OF QUANTITY

ORIGINAL CONTRACT PREVIOUS CLAIM CURRENT CLAIM CUMMULATIVE CLAIM


Sr. No Item Code DESCRIPTION UNIT RATE % % % REMARK
QTY AMOUNT QTY AMOUNT % QTY AMOUNT % QTY AMOUNT %
(IN INR) CLAIM CLAIM CLAIM

shall include for preparing & providing -


detailed fabrication drawings based on -
design drawings & getting the same -
approved from the Engineer/Owner. -
-
Project : Phonix - Higi Revamp Phase- 2 at Johnson And Johnson Pvt Ltd, Mulund, Mumbai

Construction of PD Building
PACKAGE :
Level 05, 06 & 07
BILL OF QUANTITY

ORIGINAL CONTRACT PREVIOUS CLAIM CURRENT CLAIM CUMMULATIVE CLAIM


Sr. No Item Code DESCRIPTION UNIT RATE % % % REMARK
QTY AMOUNT QTY AMOUNT % QTY AMOUNT % QTY AMOUNT %
(IN INR) CLAIM CLAIM CLAIM

1.2 0500001a Same as item 0500001a above for grating -


made out of M.S. flats of specified thickness. MT QRO 188,100.00 #VALUE! - - - - #VALUE!
-
1.3 0500001b Same as item 0500001c above for grating MT QRO 247,500.00 #VALUE! - - - - #VALUE!
made out of M.S. flats of specified thickness -
with FRP coating -
-
1.4 0500001c Same as item no. 0500001a above but with MT QRO 183,150.00 #VALUE! - - - - #VALUE!
m.s. chequered plate of specified thickness. -
-
2 0500002 Providing & painting to structural steel -
work with primer & paint of approved quality -
& make including preparation of surface as -
per IS 2074 or as per approved paint -
manufacturer specification and including -
scaffolding etc all complete as directed & -
instructed by Owner/Engineer. Thickness -
of each coat of primer and paint and -
application shall be as per approved paint -
manufacturer's specifications(Rate shall -
include cost of supply of paint) -
-
2.1 0500002a One shop coat of red oxide zinc chromate MT QRO 9,900.00 #VALUE! - - - - #VALUE!
primer including preparation of steel -
surface to the requirement of paint -
manufacturer's speciication. -
-
2.2 0500002b One site coat of red oxide zinc chromate MT QRO 12,375.00 #VALUE! - - - - #VALUE!
primer after erection is completed and -
approved by Engineer. -
-
2.3 0500002c Two coats of approved shade of synthetic MT QRO 8,415.00 #VALUE! - - - - #VALUE!
enamel paint of Akzo Nobel/ICI make or -
approved equivalent make. -
trusses and purlins Twister -
-
3 0500003 Providing,fabricating & erecting pipe -
railing made out of M.S. "B" class pipes -
(approximately 1000mm high) with 50 NB -
dia pipe hand rail, 32 mm dia pipe knee -
rail and 75 x 6 mm thk toe plate with 32 NB -
pipevertical support spaced at approx. -
1200 c/c and at corners & change of -
direction. Also including assembly for -
fixing to inserts or stringer beams / concrete -
supports complete in all respects including surface -
preparation for painting and 2 coats of red oxide zinc -
chromate primer & two coats of 1st quality -
synthetic enamel paint of approved make & -
shade all as directed & instructed by -
Engineer.(Pipe contractors supply) -
-
Note :-Items shall be measured as total length of -
completed pipe railing(not individual pipe lengths) -
-
Project : Phonix - Higi Revamp Phase- 2 at Johnson And Johnson Pvt Ltd, Mulund, Mumbai

Construction of PD Building
PACKAGE :
Level 05, 06 & 07
BILL OF QUANTITY

ORIGINAL CONTRACT PREVIOUS CLAIM CURRENT CLAIM CUMMULATIVE CLAIM


Sr. No Item Code DESCRIPTION UNIT RATE % % % REMARK
QTY AMOUNT QTY AMOUNT % QTY AMOUNT % QTY AMOUNT %
(IN INR) CLAIM CLAIM CLAIM

3.1 500003a do- but with railing in SS 304 grade RM QRO 6,435.00 #VALUE! - - - - #VALUE!
-
4 500004 Same as item 0500005 but with 40 NB. RM 195.0 2,970.00 579,150.00 - - - - 195.00
M.S. 'C' class pipe.(Pipe contractors supply) -
-
4.1 0500004a Same as item 0500005b but with 50 NB. RM 25.0 6,435.00 160,875.00 - - - - 25.00
S.S. 304. Hand drail (Pipe contractors supply) -
-
5 500005 Same as item 0500005 but with 40 NB. RM 643.50 - - - - - -
M.S. 'C' class pipe.(Pipe, Bend, Toe plate -
free supply by client) -
-
6 Designing, providing, fabricating, painting (pre & post -
errection) trasporting till the site and erecting PEB -
structural members as per the structural data sheet -
provided herewith etc. complete as per requirement of -
structural consultant and project engineer / incharge. -
Rates shall be inclusive of all necessary arrangements -
required for onsite errection and jointing to RCC / -
structural columns & beam as per the design and site -
requirement. -
-
Design (against Approval from structural consultant) LS - 1,848,825.00 - - 100% - 100% - 100% -
Supply / delivery of structural elements (prefabricated) at site MT 26.2 114,840.00 3,011,104.80 15.76 100% 1,809,878.40 60% 100% - 0% 15.76 100% 1,809,878.40 60% 10.46
Erection / installation at site including all required
MT 36.6 34,827.21 1,275,082.67 26.153 100% 910,848.71 71% 100% - 0% 26.15 100% 910,848.71 10.46
connections
-
7 800012 Providing, Fabricationg & erecting bare galvalume Deck sheet sqm 674.9 1,831.50 1,235,999.31 496.32 100% 909,017.22 74% 100% - 0% 496.32 100% 909,017.22 74% 178.53
as per relevant drg and/or as instructed by
-
Client/Consultants
-
-
Sub Total of Section 5 6,262,211.78 3,629,744.33 58% - 0% 3,629,744.33 58%
Item Code
Grade M25 Concrete
0301005c
LENGTH BREADTH DEPTH QUANTITY
SR NO DESCRIPTION NO REMARK
(M) (M) (M) (Cum)
RA02
Level 16.75M to 20.95M -
1 Column -
1 Stub Column (M25) -
COLUMN-C6 Pedestral 1 0.900 0.40 0.800 0.29
COLUMN-C8 Pedestral 1 1.000 0.40 0.800 0.32
COLUMN-C7 Pedestral 1 1.000 0.45 0.800 0.36
COLUMN-C9 Pedestral 1 1.300 0.45 0.800 0.47
COLUMN-C9 Pedestral 1 1.300 0.40 0.800 0.42

-
2 16.75 to 20.95 M Column (M25) -
COLUMN-C2 3 0.600 0.30 3.600 1.94
COLUMN-C4 1 0.750 0.30 3.600 0.81
COLUMN-C7 2 1.000 0.30 3.600 2.16
COLUMN-C8 1 1.000 0.30 3.600 1.08

TOTAL 7.85
RA04
COLUMN
Level 16.75M to 20.95M
COLUMN-C2 (GRID A/9) 1 0.600 0.30 3.600 0.65
COLUMN-C4 (GRID C/9) 1 0.750 0.30 3.600 0.81

3 Certtain Ht to 20.95M (M25) -


COLUMN-C3 (GRID A/5, A/7) 2 0.750 0.30 1.350 0.61
COLUMN-C7 (GRID C/5, C/7) 2 1.000 0.30 1.350 0.81

TOTAL 2.88
BEAM
Level 20.95M
CONTINOUS BEAM (300X625)
B5-B6-B5 (A-1 TO F-1) 1 15.630 0.30 0.475 2.23

CONTINOUS BEAM (300X625)


B5-B6-B5 (A-9 TO F-9) 1 15.630 0.30 0.475 2.23

CONTINOUS BEAM (300X625)


B1-B2-B1 (F-1 TO F-9) 1 35.230 0.30 0.475 5.02

CONTINOUS BEAM (300X625)


B1-B2-B1 (A-1 TO A-9) 1 35.230 0.30 0.475 5.02

SIMPLY SUPPORTED BEAM (300X625)


B4 (C-1 TO C-2) 1 6.645 0.30 0.475 0.95

SIMPLY SUPPORTED BEAM (300X625)


B7 (A-2 TO C-2) 1 3.880 0.30 0.475 0.55

SIMPLY SUPPORTED BEAM (300X625)


B10 (A-5 TO C-5) 1 3.880 0.30 0.475 0.55

SIMPLY SUPPORTED BEAM (300X625)


B09 (C-5 TO C-7) 1 5.800 0.30 0.475 0.83

SIMPLY SUPPORTED BEAM (300X625)


B10 (A-7 TO C-7) 1 3.880 0.30 0.475 0.55

SIMPLY SUPPORTED BEAM (300X625)


Item Code
Grade M25 Concrete
0301005c
LENGTH BREADTH DEPTH QUANTITY
SR NO DESCRIPTION NO REMARK
(M) (M) (M) (Cum)
B8 (D-5 TO F-5) 1 5.450 0.30 0.475 0.78

SIMPLY SUPPORTED BEAM (300X625)


B8 (D-7 TO F-7) 1 5.450 0.30 0.475 0.78

SIMPLY SUPPORTED BEAM (300X625)


B3 (D-7 TO F-7) 1 5.715 0.30 0.850 1.46

TOTAL 20.94
SLAB
Level 20.95M
Total Area 1 35.830 16.83 603.02
Deduction -
Staircase -1 -1 4.314 5.45 (23.51)
Staircase -2 -1 3.880 6.31 (24.50)
Lift-1 -1 2.342 2.23 (5.23)
Lift-2 -1 2.200 2.41 (5.31)
Cutout (2/3-A) TWO OPENING -2 0.650 0.25 (0.33)
Cutout (2/3-F) -1 0.900 0.30 (0.27)
Cutout (3/4-F) -1 0.700 0.28 (0.19)
Cutout (7/8-F) -1 1.300 0.30 (0.39)
Cutout (7/9-A) -1 0.700 0.20 (0.14)

543.16
TOTAL 0.150 81.47

RA01 (PO 2021)


SLAB 20.95
1 DECK SHEET UNDULATION 118 0.008 15.63 14.75 Area of Trapezoid=
DEDUCTION OPENING a=0.13
STAIRCASE-1 -13 0.008 5.45 (0.57) b=0.19
STAIRCASE-2 -20 0.008 3.88 (0.62) h=0.05

TOTAL 13.57
COLUMN
2 Level 16.75M to 20.95M
COLUMN-C2 (GRID D/9) 1 0.600 0.30 3.100 0.56
COLUMN-C2 (GRID F/9) 1 0.600 0.30 1.000 0.18
COLUMN-C4 (GRID F/7) 1 0.750 0.30 0.450 0.10
COLUMN-C4 (GRID F/5) 1 0.750 0.30 0.250 0.06
COLUMN-C7 (GRID D/5) 1 1.000 0.30 0.600 0.18
COLUMN-C5 (GRID D/7) 1 0.900 0.30 0.450 0.12
COLUMN-C7 (GRID A/2) 1 1.000 0.30 0.200 0.06
COLUMN-C7 (GRID C/2) 1 1.000 0.30 0.550 0.17
COLUMN-C2 (GRID A/1) 1 0.600 0.30 0.500 0.09
COLUMN-C4 (GRID C/1) 1 0.750 0.30 0.150 0.03
COLUMN-C1 (GRID B/6) 1 0.450 0.23 4.000 0.41
COLUMN-C1 (GRID E/8) 1 0.450 0.23 4.000 0.41
TOTAL 2.37

3 LINTEL BEAM
LB1 (1-2/F) 1 6.015 0.30 0.200 0.36
LB1 (2-3/F) 1 5.135 0.30 0.200 0.31
LB1 (3-4/F) 1 6.200 0.30 0.200 0.37
LB1 (4-5/F) 1 4.650 0.30 0.200 0.28
LB1 (7-9/F) 1 3.865 0.30 0.200 0.23
LB1 (D-F/9) 1 5.450 0.30 0.200 0.33
Item Code
Grade M25 Concrete
0301005c
LENGTH BREADTH DEPTH QUANTITY
SR NO DESCRIPTION NO REMARK
(M) (M) (M) (Cum)
LB1 (C-D/9) 1 5.165 0.30 0.200 0.31
LB1 (A-C/9) 1 3.365 0.30 0.200 0.20
LB1 (7-9/A) 1 4.500 0.30 0.200 0.27
LB1 (5-7/A) 1 3.795 0.30 0.200 0.23
LB1 (4-5/A) 1 4.135 0.30 0.200 0.25
LB1 (3-4/A) 1 6.375 0.30 0.200 0.38
LB1 (2-3/A) 1 5.780 0.30 0.200 0.35
LB1 (C-D/1) 1 5.385 0.30 0.200 0.32
LB1 (D-F/1) 1 5.315 0.30 0.200 0.32
LB2 (A-C/7) 1 3.180 0.30 0.200 0.19
LB2 (D-F/7) 1 5.450 0.30 0.200 0.33
TOTAL 5.03

RA02 (PO 2021)


COLUMN
Level 20.95M to 25.15M Column (M25)

COLUMN-C2 (GRID D/1) 1 0.600 0.30 4.050 0.73


COLUMN-C2 (GRID F/1) 1 0.600 0.30 4.050 0.73
COLUMN-C2 (GRID F/4) 1 0.600 0.30 4.050 0.73
COLUMN-C4 (GRID F/3) 1 0.750 0.30 4.050 0.91
COLUMN-C7 (GRID F/2) 1 1.000 0.30 4.050 1.22
COLUMN-C7 (GRID A/4) 1 1.000 0.30 4.050 1.22
COLUMN-C8 (GRID A/3) 1 1.000 0.30 4.050 1.22
COLUMN-C2 (GRID A/9) 1 0.600 0.30 4.050 0.73
COLUMN-C4 (GRID C/9) 1 0.750 0.30 4.050 0.91
COLUMN-C3 (GRID A/5) 1 0.750 0.30 4.050 0.91
COLUMN-C3 (GRID A/7) 1 0.750 0.30 4.050 0.91
COLUMN-C7 (GRID C/5) 1 1.000 0.30 4.050 1.22
COLUMN-C7 (GRID C/7) 1 1.000 0.30 4.050 1.22
COLUMN-C2 (GRID D/9) 1 0.600 0.30 4.050 0.73
COLUMN-C2 (GRID F/9) 1 0.600 0.30 4.050 0.73
COLUMN-C4 (GRID F/7) 1 0.750 0.30 4.050 0.91
COLUMN-C4 (GRID F/5) 1 0.750 0.30 4.050 0.91
COLUMN-C7 (GRID D/5) 1 1.000 0.30 4.050 1.22
COLUMN-C5 (GRID D/7) 1 0.900 0.30 4.050 1.09
COLUMN-C7 (GRID A/2) 1 1.000 0.30 4.050 1.22
COLUMN-C7 (GRID C/2) 1 1.000 0.30 4.050 1.22
COLUMN-C2 (GRID A/1) 1 0.600 0.30 4.050 0.73
COLUMN-C4 (GRID C/1) 1 0.750 0.30 4.050 0.91
COLUMN-C1 (GRID B/6) 1 0.450 0.23 4.050 0.42
COLUMN-C1 (GRID E/8) 1 0.450 0.23 4.050 0.42

23.13

BEAM
Level 25.15M
BEAM B5 (A/1 TO C/1) (300X600) 1 3.280 0.30 0.450 0.44
BEAM B6 (C/1 TO D/1) (300X600) 1 5.385 0.30 0.450 0.73
BEAM B5 (D/1 TO F/1) (300X600) 1 5.315 0.30 0.450 0.72

BEAM B5 (A/9 TO C/9) (300X600) 1 3.365 0.30 0.450 0.45


BEAM B6 (C/9 TO D/9) (300X600) 1 5.165 0.30 0.450 0.70
BEAM B5 (D/9 TO F/9) (300X600) 1 5.450 0.30 0.450 0.74

BEAM B1 (F/1 TO F/2) (300X600) 1 6.015 0.30 0.450 0.81


BEAM B2 (F/2 TO F/3) (300X600) 1 5.135 0.30 0.450 0.69
BEAM B2 (F/3 TO F/4) (300X600) 1 6.200 0.30 0.450 0.84
Item Code
Grade M25 Concrete
0301005c
LENGTH BREADTH DEPTH QUANTITY
SR NO DESCRIPTION NO REMARK
(M) (M) (M) (Cum)
BEAM B2 (F/4 TO F/5) (300X600) 1 4.650 0.30 0.450 0.63
BEAM B2 (F/5 TO F/7) (300X600) 1 4.315 0.30 0.450 0.58
BEAM B1 (F/7 TO F/9) (300X600) 1 3.865 0.30 0.450 0.52

BEAM B1 (A/1 TO A/2) (300X600) 1 5.545 0.30 0.450 0.75


BEAM B2 (A/2 TO A/3) (300X600) 1 5.780 0.30 0.450 0.78
BEAM B2 (A/3 TO A/4) (300X600) 1 6.375 0.30 0.450 0.86
BEAM B2 (A/4 TO A/5) (300X600) 1 4.135 0.30 0.450 0.56
BEAM B2 (A/5 TO A/7) (300X600) 1 3.795 0.30 0.450 0.51
BEAM B1 (A/7 TO A/9) (300X600) 1 4.500 0.30 0.450 0.61

BEAM B4 (C/1 TO C/2) (300X600) 1 5.545 0.30 0.450 0.75

BEAM B7 (A-2 TO C-2) (300X600) 1 3.880 0.30 0.450 0.52

BEAM B10 (A-5 TO C-5) (300X600) 1 3.880 0.30 0.450 0.52

BEAM B09 (C-5 TO C-7) (300X600) 1 4.500 0.30 0.450 0.61

BEAM B10 (A-7 TO C-7) (300X600) 1 3.180 0.30 0.450 0.43

BEAM B8 (D-5 TO F-5) (300X600) 1 5.450 0.30 0.450 0.74

BEAM B8 (D-7 TO F-7) (300X600) 1 5.450 0.30 0.450 0.74

BEAM B3 (D-5 TO F-7) (300X975) 1 3.815 0.30 0.825 0.94

TOTAL 17.17

Level 25.15M
Total Area 1 35.830 16.83 603.02
Deduction -
Staircase -1 -1 4.314 5.45 (23.51)
Staircase -2 -1 3.880 6.31 (24.50)
Lift-1 -1 5.450 4.62 (25.15)
Lift-2 -1 4.500 3.88 (17.46)
Cutout (2/3-A) TWO OPENING -2 0.650 0.25 (0.33)
Cutout (2/3-F) -1 0.900 0.30 (0.27)
Cutout (3/4-F) -1 0.700 0.28 (0.19)
Cutout (7/9-A) -1 0.700 0.20 (0.14)
Cutout (D-F/2-3) -2 0.970 0.85 (1.65)
Cutout (D-F/3-4) -2 0.930 0.60 (1.12)
509.82
TOTAL 0.150 76.47

SLAB 25.15
1 DECK SHEET UNDULATION 118 0.008 15.63 14.75 Area of Trapezoid=
DEDUCTION OPENING a=0.13
STAIRCASE-1 -13 0.008 5.45 (0.57) b=0.19
STAIRCASE-2 -20 0.008 3.88 (0.62) h=0.05
Item Code
Grade M25 Concrete
0301005c
LENGTH BREADTH DEPTH QUANTITY
SR NO DESCRIPTION NO REMARK
(M) (M) (M) (Cum)
Lift-1 -15 0.008 5.45 (0.65)
Lift-2 -15 0.008 3.88 (0.47)

TOTAL 12.91

TOTAL ONE FLOOR QTY 89.39

STAIRCASE-1 LEVEL 16.75 to 20.95 M -


Flight-1 (16.750M TO 18.100M)
Bottom Trangle 0.5 0.200 0.150 1.565 0.023
Bottom Trangle 0.5 0.115 0.225 1.565 0.020
Waist Slab 1 2.569 0.225 1.565 0.90
Top Trangle 0.5 0.140 0.28 1.565 0.03
Steps 4 0.300 0.15 1.565 0.28

Mid Landing 18.100M


Mid landing 1 1.565 1.545 0.225 0.54

Flight-1 (18.100M TO 18.850M)


Bottom Trangle 0.5 0.053 0.225 1.545 0.009
Bottom Trangle 0.5 0.053 0.225 1.545 0.009
Waist Slab 1 1.342 0.225 1.545 0.47
Top Trangle 0.5 0.140 0.32 1.545 0.03
Steps 2 0.300 0.15 1.565 0.14

Mid Landing 18.850M


Mid landing 1 1.550 1.545 0.225 0.54

Flight-1 (18.850M TO 20.20M)


Bottom Trangle 0.5 0.053 0.225 1.550 0.009
Bottom Trangle 0.5 0.053 0.225 1.550 0.009
Waist Slab 1 2.683 0.225 1.550 0.94
Top Trangle 0.5 0.140 0.32 1.550 0.03
Steps 4 0.300 0.15 1.565 0.28

Mid Landing 20.20M


Mid landing 1 1.550 1.575 0.225 0.55

Flight-1 (20.20M TO 20.95M)


Bottom Trangle 0.5 0.053 0.225 1.575 0.009
Bottom Trangle 0.5 0.053 0.225 1.575 0.009
Waist Slab 1 1.342 0.225 1.575 0.48
Top Trangle 0.5 0.140 0.32 1.575 0.04
Steps 2 0.300 0.15 1.565 0.14

Mid Landing 20.95M


Mid landing 1 1.575 1.565 0.225 0.55

Mid Landing Beam


Beam (230x975) 1 4.315 0.230 0.975 0.97

7.02

2 20.95 to 25.15 M Column (M25) -


Flight-1 (20.950M TO 22.300M)
Item Code
Grade M25 Concrete
0301005c
LENGTH BREADTH DEPTH QUANTITY
SR NO DESCRIPTION NO REMARK
(M) (M) (M) (Cum)
Bottom Trangle 0.5 0.200 0.150 1.565 0.023
Bottom Trangle 0.5 0.115 0.225 1.565 0.020
Waist Slab 1 2.569 0.225 1.565 0.90
Top Trangle 0.5 0.140 0.28 1.565 0.03
Steps 4 0.300 0.15 1.565 0.28

Mid Landing 22.300M


Mid landing 1 1.565 1.545 0.225 0.54

Flight-1 (22.300M TO 23.050M)


Bottom Trangle 0.5 0.053 0.225 1.545 0.009
Bottom Trangle 0.5 0.053 0.225 1.545 0.009
Waist Slab 1 1.342 0.225 1.545 0.47
Top Trangle 0.5 0.140 0.32 1.545 0.03
Steps 2 0.300 0.15 1.565 0.14

Mid Landing 23.050M


Mid landing 1 1.550 1.545 0.225 0.54

Flight-1 (23.050M TO 24.40M)


Bottom Trangle 0.5 0.053 0.225 1.550 0.009
Bottom Trangle 0.5 0.053 0.225 1.550 0.009
Waist Slab 1 2.683 0.225 1.550 0.94
Top Trangle 0.5 0.140 0.32 1.550 0.03
Steps 4 0.300 0.15 1.565 0.28

Mid Landing 24.40M


Mid landing 1 1.565 1.575 0.225 0.55

Flight-1 (24.40M TO 25.15M)


Bottom Trangle 0.5 0.053 0.225 1.575 0.009
Bottom Trangle 0.5 0.053 0.225 1.575 0.009
Waist Slab 1 1.342 0.225 1.575 0.48
Top Trangle 0.5 0.140 0.32 1.575 0.04
Steps 2 0.300 0.15 1.565 0.14

Mid Landing 25.15M


Mid landing 1 1.575 1.565 0.225 0.55

Mid Landing Beam


Beam (230x975) 1 4.315 0.230 0.975 0.97

7.02

RA03 (PO 2021)

Level 25.15M
Lift-1 1 5.450 4.62 25.15
Lift-1 Opening -1 2.325 2.30 (5.35)
Lift-2 1 4.500 3.88 17.46
Lift-2 Opening -1 2.396 2.20 (5.27)
31.99
TOTAL 0.150 4.80

LINTEL BEAM (25.15 M)


LB1 (C/1 TO D/1) (200X300) 1 5.385 0.20 0.300 0.32
LB1 (D/1 TO F/1) (200X300) 1 5.315 0.20 0.300 0.32

LB1 (A/9 TO C/9) (200X300) 1 3.365 0.20 0.300 0.20


Item Code
Grade M25 Concrete
0301005c
LENGTH BREADTH DEPTH QUANTITY
SR NO DESCRIPTION NO REMARK
(M) (M) (M) (Cum)
LB1 (C/9 TO D/9) (200X300) 1 5.165 0.20 0.300 0.31
LB1 (D/9 TO F/9) (200X300) 1 5.450 0.20 0.300 0.33

LB1 (F/1 TO F/2) (200X300) 1 6.015 0.20 0.300 0.36


LB1 (F/2 TO F/3) (200X300) 1 5.135 0.20 0.300 0.31
LB1 (F/3 TO F/4) (200X300) 1 6.200 0.20 0.300 0.37
LB1 (F/4 TO F/5) (200X300) 1 4.650 0.20 0.300 0.28
LB1 (F/7 TO F/9) (200X300) 1 3.865 0.20 0.300 0.23

LB1 (A/2 TO A/3) (200X300) 1 5.780 0.20 0.300 0.35


LB1 (A/3 TO A/4) (200X300) 1 6.375 0.20 0.300 0.38
LB1 (A/4 TO A/5) (200X300) 1 4.135 0.20 0.300 0.25
LB1 (A/5 TO A/7) (200X300) 1 3.795 0.20 0.300 0.23
LB1 (A/7 TO A/9) (200X300) 1 4.500 0.20 0.300 0.27

LB2 (C/1 TO C/2) (200X300) 1 5.545 0.20 0.300 0.33

LB2 (A-7 TO C-7) (200X300) 1 3.180 0.20 0.300 0.19

5.03

2 25.15 to 29.5 M Column -


COLUMN-C2 (GRID D/1) 1 0.600 0.30 1.000 0.18
COLUMN-C2 (GRID F/1) 1 0.600 0.30 1.000 0.18
COLUMN-C2 (GRID F/4) 1 0.600 0.30 1.000 0.18
COLUMN-C4 (GRID F/3) 1 0.750 0.30 1.000 0.23
COLUMN-C7 (GRID F/2) 1 1.000 0.30 1.000 0.30
COLUMN-C7 (GRID A/4) 1 1.000 0.30 1.000 0.30
COLUMN-C8 (GRID A/3) 1 1.000 0.30 1.000 0.30
COLUMN-C2 (GRID A/9) 1 0.600 0.30 1.000 0.18
COLUMN-C4 (GRID C/9) 1 0.750 0.30 1.000 0.23
COLUMN-C3 (GRID A/5) 1 0.750 0.30 4.200 0.95
COLUMN-C3 (GRID A/7) 1 0.750 0.30 4.200 0.95
COLUMN-C7 (GRID C/5) 1 1.000 0.30 4.200 1.26
COLUMN-C7 (GRID C/7) 1 1.000 0.30 4.200 1.26
COLUMN-C2 (GRID D/9) 1 0.600 0.30 4.150 0.75
COLUMN-C2 (GRID F/9) 1 0.600 0.30 4.150 0.75
COLUMN-C4 (GRID F/7) 1 0.750 0.30 4.150 0.93
COLUMN-C4 (GRID F/5) 1 0.750 0.30 4.150 0.93
COLUMN-C7 (GRID D/5) 1 1.000 0.30 4.150 1.25
COLUMN-C5 (GRID D/7) 1 0.900 0.30 4.150 1.12
COLUMN-C7 (GRID A/2) 1 1.000 0.30 4.150 1.25
COLUMN-C7 (GRID C/2) 1 1.000 0.30 4.150 1.25
COLUMN-C2 (GRID A/1) 1 0.600 0.30 4.150 0.75
COLUMN-C4 (GRID C/1) 1 0.750 0.30 4.150 0.93
COLUMN-C1 (GRID B/6) 1 0.450 0.23 0.350 0.04
COLUMN-C1 (GRID E/8) 1 0.450 0.23 0.350 0.04

16.45

BEAM
Level 25.65M
Lift-1
BEAM B1 (F/7 TO F/9) (230X500) 1 3.870 0.23 0.350 0.31
BEAM B4 (D/9 TO F/9) (230X500) 1 5.450 0.23 0.350 0.44
BEAM B2 (E/8 TO E/9) (230X500) 1 2.370 0.23 0.350 0.19
BEAM B3 (E/8 TO F/8) (230X500) 1 2.150 0.23 0.350 0.17

Lift-2
Item Code
Grade M25 Concrete
0301005c
LENGTH BREADTH DEPTH QUANTITY
SR NO DESCRIPTION NO REMARK
(M) (M) (M) (Cum)
BEAM B1 (F/7 TO F/9) (230X500) 1 3.795 0.23 0.350 0.31
BEAM B4 (D/9 TO F/9) (230X500) 1 3.180 0.23 0.350 0.26
BEAM B2 (E/8 TO E/9) (230X500) 1 2.370 0.23 0.350 0.19
BEAM B3 (E/8 TO F/8) (230X500) 1 2.150 0.23 0.350 0.17

TOTAL 2.04
SLAB
Level 25.65M
Lift-1 1 2.830 2.830 0.150 1.20
Lift-2 1 2.830 2.830 0.150 1.20

TOTAL 2.40

BEAM
Level 29.5 M
STAIRCASE-2
BEAM B9 (A/1 TO C/1) (300X600) 1 3.280 0.30 0.400 0.39
BEAM B7 (A/1 TO A/2) (300X600) 1 5.545 0.30 0.400 0.67
BEAM B7 (C/1 TO C/2) (300X600) 1 5.545 0.30 0.400 0.67
BEAM B9 (A-2 TO C-2) (300X600) 1 3.880 0.30 0.400 0.47
BEAM B8 (A-C/1 TO A-C/2) (300X600) 1 6.245 0.30 0.400 0.75

STAIRCASE-1
BEAM B1 (F/5 TO F/7) (300X600) 1 4.315 0.30 0.400 0.52
BEAM B1 (F/7 TO F/9) (300X600) 1 3.865 0.30 0.400 0.46
BEAM B1 (D-5 TO D-7) (300X600) 1 3.830 0.30 0.400 0.46
BEAM B1 (D/7 TO D/9) (300X600) 1 4.030 0.30 0.400 0.48
BEAM B3 (D-5 TO F-5) (300X600) 1 5.450 0.30 0.400 0.65
BEAM B4 (D/5-7 TO F/5-7) (300X600) 1 5.450 0.30 0.400 0.65
BEAM B5 (D-7 TO F-7) (300X600) 1 5.450 0.30 0.400 0.65
BEAM B6 (D/7-9 TO F/7-9) (230X600) 1 5.450 0.23 0.400 0.50
BEAM B3 (D/9 TO F/9) (300X600) 1 5.450 0.30 0.400 0.65

LIFT-2
BEAM B2 (A/5 TO A/7) (230X600) 1 3.795 0.23 0.450 0.39
BEAM B2 (C/5 TO C/7) (230X600) 1 4.500 0.23 0.450 0.47
BEAM B6 (A/5-7 TO C/5-7) (230X600) 1 4.020 0.23 0.450 0.42
BEAM B10 (A-5 TO C-5) (230X600) 1 3.880 0.23 0.450 0.40
BEAM B10 (A-7 TO C-7) (230X600) 1 3.180 0.23 0.450 0.33

TOTAL 9.99

SLAB
Level 29.5 M
STAIRCASE-1 1 10.730 6.950 0.200 14.91
-
STAIRCASE-2 1 7.745 5.380 0.200 8.33

Lift-2 1 6.330 5.380 0.150 5.11

TOTAL 28.36

STAIRCASE-2
2 16.75 to 20.95 M Column (M25) -
Flight-1 (16.750M TO 18.550M)
Bottom Trangle 0.5 0.200 0.150 1.600 0.024
Bottom Trangle 0.5 0.115 0.225 1.600 0.021
Item Code
Grade M25 Concrete
0301005c
LENGTH BREADTH DEPTH QUANTITY
SR NO DESCRIPTION NO REMARK
(M) (M) (M) (Cum)
Waist Slab 1 3.575 0.225 1.600 1.29
Top Trangle 0.5 0.140 0.315 1.600 0.04
Steps 5.5 0.300 0.15 1.600 0.40

Mid Landing 18.550M


Mid landing 1 1.500 1.560 0.225 0.53

Flight-2 (18.550M TO 19.150M)


Bottom Trangle 0.5 0.053 0.225 1.600 0.010
Bottom Trangle 0.5 0.053 0.225 1.600 0.010
Waist Slab 1 1.000 0.225 1.600 0.36
Top Trangle 0.5 0.140 0.320 1.600 0.04
Steps 1.5 0.300 0.15 1.600 0.11

Mid Landing 19.150M


Mid landing 1 1.500 1.500 0.225 0.51

Flight-1 (19.150M TO 20.95M)


Bottom Trangle 0.5 0.053 0.225 1.600 0.010
Bottom Trangle 0.5 0.053 0.225 1.600 0.010
Waist Slab 1 3.690 0.225 1.600 1.33
Top Trangle 0.5 0.140 0.32 1.600 0.04
Steps 5.5 0.300 0.15 1.600 0.40

Floor Landing 20.95M


Mid landing 1 3.950 1.515 0.225 1.35

Mid Landing Beam


Beam (230x975) 1 3.880 0.230 0.825 0.74

7.18

STAIRCASE-2
2 20.95 to 25.15 M Column (M25) -
Flight-1 (20.950M TO 22.750M)
Bottom Trangle 0.5 0.200 0.150 1.600 0.024
Bottom Trangle 0.5 0.115 0.225 1.600 0.021
Waist Slab 1 3.575 0.225 1.600 1.29
Top Trangle 0.5 0.140 0.315 1.600 0.04
Steps 5.5 0.300 0.15 1.600 0.40

Mid Landing 22.750M


Mid landing 1 1.500 1.560 0.225 0.53

Flight-2 (22.750M TO 23.350M)


Bottom Trangle 0.5 0.053 0.225 1.600 0.010
Bottom Trangle 0.5 0.053 0.225 1.600 0.010
Waist Slab 1 1.000 0.225 1.600 0.36
Top Trangle 0.5 0.140 0.320 1.600 0.04
Steps 1.5 0.300 0.15 1.600 0.11

Mid Landing 23.350M


Mid landing 1 1.500 1.500 0.225 0.51

Flight-1 (23.350M TO 25.15M)


Bottom Trangle 0.5 0.053 0.225 1.600 0.010
Bottom Trangle 0.5 0.053 0.225 1.600 0.010
Waist Slab 1 3.690 0.225 1.600 1.33
Top Trangle 0.5 0.140 0.32 1.600 0.04
Item Code
Grade M25 Concrete
0301005c
LENGTH BREADTH DEPTH QUANTITY
SR NO DESCRIPTION NO REMARK
(M) (M) (M) (Cum)
Steps 5.5 0.300 0.15 1.600 0.40

Floor Landing 25.15M


Mid landing 1 3.950 1.515 0.225 1.35

Mid Landing Beam


Beam (230x975) 1 3.880 0.230 0.825 0.74

7.18

TOTAL QTY 361.25


PREVIOUS CLAIM 7.85 RA BILL NO 02
PREVIOUS CLAIM 105.29 RA BILL NO 04
RA BILL NO 01
PREVIOUS CLAIM
20.96 (PO 2021)
RA BILL NO 02
PREVIOUS CLAIM
143.72 (PO 2021)
RA BILL NO 03
THIS BILL QTY
83.43 (PO 2021)
Item Code
Ordinary form work
0301007a
LENGTH BREADTH DEPTH QUANTITY
DESCRIPTION NO REMARK
SR NO (M) (M) (M) (Sqm)

RA02
Level 16.75M to 20.95M -
1 Column -
1 Stub Column -
COLUMN-C6 Pedestral 1 0.900 0.40 0.800 2.08
COLUMN-C8 Pedestral 1 1.000 0.40 0.800 2.24
COLUMN-C7 Pedestral 1 1.000 0.45 0.800 2.32
COLUMN-C9 Pedestral 1 1.300 0.45 0.800 2.80
COLUMN-C9 Pedestral 1 1.300 0.40 0.800 2.72

-
2 16.75 to 20.95 M Column -
COLUMN-C2 3 0.600 0.30 3.600 19.44
COLUMN-C4 1 0.750 0.30 3.600 7.56
COLUMN-C7 2 1.000 0.30 3.600 18.72
COLUMN-C8 1 1.000 0.30 3.600 9.36
-
RA04
COLUMN
2 16.75 to 20.95 M Column -
COLUMN-C2 (GRID A/9) 1 0.600 0.30 3.600 6.48
COLUMN-C4 (GRID C/9) 1 0.750 0.30 3.600 7.56

Certtain Ht to 20.95M (M25)


COLUMN-C3 2 0.750 0.30 1.350 5.67
COLUMN-C7 2 1.000 0.30 1.350 7.02

BEAM
1 CONTINOUS BEAM (300X625)
B5-B6-B5 (A-1 TO F-1)
Outter Side 1 16.230 0.475 7.71
Inner Side 1 15.630 0.475 7.42
bottom 1 15.630 0.30 4.69
DEDUCTION COLUMN LENGTH
COLUMN C2 -1 0.600 0.30 (0.18)
COLUMN C4 -1 0.750 0.30 (0.23)

2 CONTINOUS BEAM (300X625)


B5-B6-B5 (A-9 TO F-9)
Outter Side 1 16.230 0.475 7.71
Inner Side 1 15.630 0.475 7.42
bottom 1 15.630 0.30 4.69
DEDUCTION COLUMN LENGTH
COLUMN C2 -1 0.600 0.30 (0.18)
COLUMN C4 -1 0.750 0.30 (0.23)

3 CONTINOUS BEAM (300X625)


B1-B2-B1 (F-1 TO F-9)
Outter Side 1 35.230 0.475 16.73
Inner Side 1 34.630 0.475 16.45
bottom 1 34.630 0.30 10.39
DEDUCTION COLUMN LENGTH
COLUMN C7 -1 1.000 0.30 (0.30)
Item Code
Ordinary form work
0301007a
LENGTH BREADTH DEPTH QUANTITY
DESCRIPTION NO REMARK
SR NO (M) (M) (M) (Sqm)
COLUMN C4 -1 0.750 0.30 (0.23)
COLUMN C2 -1 0.600 0.30 (0.18)
COLUMN C4 -1 0.750 0.30 (0.23)
COLUMN C4 -1 0.750 0.30 (0.23)

4 CONTINOUS BEAM (300X625)


B1-B2-B1 (A-1 TO A-9)
Outter Side 1 35.230 0.475 16.73
Inner Side 1 34.630 0.475 16.45
bottom 1 34.630 0.30 10.39
DEDUCTION COLUMN LENGTH
COLUMN C7 -1 1.000 0.30 (0.30)
COLUMN C8 -1 1.000 0.30 (0.30)
COLUMN C7 -1 1.000 0.30 (0.30)
COLUMN C3 -1 0.750 0.30 (0.23)
COLUMN C3 -1 0.750 0.30 (0.23)

5 SIMPLY SUPPORTED BEAM (300X625)


B4 (C-1 TO C-2)
Side 2 6.645 0.475 6.31
Bottom 1 6.645 0.30 1.99
DEDUCTION COLUMN LENGTH
COLUMN C7 -1 1.000 0.30 (0.30)

6 SIMPLY SUPPORTED BEAM (300X625)


B7 (A-2 TO C-2)
outter Side 1 4.180 0.475 1.99
Inner Side 1 3.880 0.475 1.84
Bottom 1 3.880 0.30 1.16

7 SIMPLY SUPPORTED BEAM (300X625)


B10 (A-5 TO C-5)
outter Side 1 3.880 0.475 1.84
Inner Side 1 3.880 0.475 1.84
Bottom 1 3.880 0.30 1.16

8 SIMPLY SUPPORTED BEAM (300X625)


B09 (C-5 TO C-7)
outter Side 1 5.800 0.475 2.76
Inner Side 1 5.500 0.475 2.61
Bottom 1 5.500 0.30 1.65
DEDUCTION COLUMN LENGTH
COLUMN C7 -1 1.000 0.30 (0.30)

9 SIMPLY SUPPORTED BEAM (300X625)


B10 (A-7 TO C-7)
outter Side 1 3.880 0.475 1.84
Inner Side 1 3.880 0.475 1.84
Bottom 1 3.880 0.30 1.16
DEDUCTION COLUMN LENGTH
COLUMN C7 -1 0.700 0.30 (0.21)

10 SIMPLY SUPPORTED BEAM (300X625)


B8 (D-5 TO F-5)
Item Code
Ordinary form work
0301007a
LENGTH BREADTH DEPTH QUANTITY
DESCRIPTION NO REMARK
SR NO (M) (M) (M) (Sqm)
outter Side 1 5.450 0.475 2.59
Inner Side 1 5.400 0.475 2.57
Bottom 1 5.400 0.30 1.62

11 SIMPLY SUPPORTED BEAM (300X625)


B8 (D-7 TO F-7)
outter Side 1 5.450 0.475 2.59
Inner Side 1 5.400 0.475 2.57
Bottom 1 5.400 0.30 1.62

12 SIMPLY SUPPORTED BEAM (300X625)


B3 (D-7 TO F-7)
Side 2 5.715 0.85 9.72
Bottom 1 5.715 0.30 1.71
DEDUCTION COLUMN LENGTH
COLUMN C7 -1 1.000 0.30 (0.30)
COLUMN C5 -1 0.9 0.30 (0.27)

SLAB CHAJJA (20.95M)


GRID F & A 2 35.83 0.3 21.50
GRID 1 & 9 2 16.23 0.3 9.74

RA01 (PO 2021)


SLAB
PERIMETER SIDES
GRID F 1 34.23 0.15 5.13
GRID A 1 33.83 0.15 5.07
GRID 1 1 15.73 0.15 2.36
GRID 9 1 16.23 0.15 2.43
STAIRCASE-1
2 4.315 0.15 1.29
2 5.45 0.15 1.64
STAIRCASE-2
2 6.315 0.15 1.89
2 3.380 0.15 1.01
OPENING SIDES
GRID 1-2 1 1.600 0.15 0.24 ALL PERIMETERS
1 1.200 0.15 0.18 ALL PERIMETERS

GRID 2-3 1 1.800 0.15 0.27 ALL PERIMETERS


1 0.800 0.15 0.12 ALL PERIMETERS
1 1.800 0.15 0.27 ALL PERIMETERS
1 0.800 0.15 0.12 ALL PERIMETERS

GRID 3-4 1 0.800 0.15 0.12 ALL PERIMETERS


1 0.800 0.15 0.12 ALL PERIMETERS
1 1.950 0.15 0.29 ALL PERIMETERS

GRID 7-9 1 1.800 0.15 0.27 ALL PERIMETERS


1 0.600 0.15 0.09 ALL PERIMETERS
1 1.000 0.15 0.15 ALL PERIMETERS
1 3.200 0.15 0.48 ALL PERIMETERS

COLUMN
Item Code
Ordinary form work
0301007a
LENGTH BREADTH DEPTH QUANTITY
DESCRIPTION NO REMARK
SR NO (M) (M) (M) (Sqm)
2 Level 16.75M to 20.95M
COLUMN-C2 (GRID D/9) 1 0.600 0.30 3.100 5.58
COLUMN-C2 (GRID F/9) 1 0.600 0.30 1.000 1.80
COLUMN-C4 (GRID F/7) 1 0.750 0.30 0.450 0.95
COLUMN-C4 (GRID F/5) 1 0.750 0.30 0.250 0.53
COLUMN-C7 (GRID D/5) 1 1.000 0.30 0.600 1.56
COLUMN-C5 (GRID D/7) 1 0.900 0.30 0.450 1.08
COLUMN-C7 (GRID A/2) 1 1.000 0.30 0.200 0.52
COLUMN-C7 (GRID C/2) 1 1.000 0.30 0.550 1.43
COLUMN-C2 (GRID A/1) 1 0.600 0.30 0.500 0.90
COLUMN-C4 (GRID C/1) 1 0.750 0.30 0.150 0.32
COLUMN-C1 (GRID B/6) 1 0.450 0.23 4.200 5.71
COLUMN-C1 (GRID E/8) 1 0.450 0.23 4.200 5.71

LINTEL BEAM
LB1 (1-2/F)
Both Side 2 6.015 0.30 3.61
Bottom 1 6.015 0.200 1.20
LB1 (2-3/F) -
Both Side 2 5.135 0.30 3.08
Bottom 1 5.135 0.200 1.03
LB1 (3-4/F) -
Both Side 2 6.200 0.30 3.72
Bottom 1 6.200 0.200 1.24
LB1 (4-5/F) -
Both Side 2 4.650 0.30 2.79
Bottom 1 4.650 0.20 0.93
LB1 (7-9/F) -
Both Side 2 3.865 0.30 2.32
Bottom 1 3.865 0.20 0.77
LB1 (D-F/9) -
Both Side 2 5.450 0.30 3.27
Bottom 1 5.450 0.20 1.09
LB1 (C-D/9) -
Both Side 2 5.165 0.30 3.10
Bottom 1 5.165 0.20 1.03
LB1 (A-C/9) -
Both Side 2 3.365 0.30 2.02
Bottom 1 3.365 0.20 0.67
LB1 (7-9/A) -
Both Side 2 4.500 0.30 2.70
Bottom 1 4.500 0.20 0.90
LB1 (5-7/A) -
Both Side 2 3.795 0.30 2.28
Bottom 1 3.795 0.20 0.76
LB1 (4-5/A) -
Both Side 2 4.135 0.30 2.48
Bottom 1 4.135 0.20 0.83
LB1 (3-4/A) -
Both Side 2 6.375 0.30 3.83
Bottom 1 6.375 0.20 1.28
LB1 (2-3/A) -
Both Side 2 5.780 0.30 3.47
Bottom 1 5.780 0.20 1.16
LB1 (C-D/1) -
Item Code
Ordinary form work
0301007a
LENGTH BREADTH DEPTH QUANTITY
DESCRIPTION NO REMARK
SR NO (M) (M) (M) (Sqm)
Both Side 2 5.385 0.30 3.23
Bottom 1 5.385 0.20 1.08
LB1 (D-F/1) -
Both Side 2 5.315 0.30 3.19
Bottom 1 5.315 0.20 1.06
LB2 (A-C/7) -
Both Side 2 3.180 0.30 1.91
Bottom 1 3.180 0.20 0.64
LB2 (D-F/7) -
Both Side 2 5.450 0.30 3.27
Bottom 1 5.450 0.20 1.09

RA02 (PO 2021)


SLAB LEVEL 20.95M
PERIMETER SIDES
LIFT-1
2 2.345 0.15 0.70 NOT GIVEN IN RA05
2 2.230 0.15 0.67 BZ NOT CASTED
LIFT-2
2 2.410 0.15 0.72
2 2.200 0.15 0.66

COLUMN
Level 20.95M to 25.15M Column (M25)
COLUMN-C2 (GRID D/1) 1 0.600 0.30 4.050 7.29
COLUMN-C2 (GRID F/1) 1 0.600 0.30 4.050 7.29
COLUMN-C2 (GRID F/4) 1 0.600 0.30 4.050 7.29
COLUMN-C4 (GRID F/3) 1 0.750 0.30 4.050 8.51
COLUMN-C7 (GRID F/2) 1 1.000 0.30 4.050 10.53
COLUMN-C7 (GRID A/4) 1 1.000 0.30 4.050 10.53
COLUMN-C8 (GRID A/3) 1 1.000 0.30 4.050 10.53
COLUMN-C2 (GRID A/9) 1 0.600 0.30 4.050 7.29
COLUMN-C4 (GRID C/9) 1 0.750 0.30 4.050 8.51
COLUMN-C3 (GRID A/5) 1 0.750 0.30 4.050 8.51
COLUMN-C3 (GRID A/7) 1 0.750 0.30 4.050 8.51
COLUMN-C7 (GRID C/5) 1 1.000 0.30 4.050 10.53
COLUMN-C7 (GRID C/7) 1 1.000 0.30 4.050 10.53
COLUMN-C2 (GRID D/9) 1 0.600 0.30 4.050 7.29
COLUMN-C2 (GRID F/9) 1 0.600 0.30 4.050 7.29
COLUMN-C4 (GRID F/7) 1 0.750 0.30 4.050 8.51
COLUMN-C4 (GRID F/5) 1 0.750 0.30 4.050 8.51
COLUMN-C7 (GRID D/5) 1 1.000 0.30 4.050 10.53
COLUMN-C5 (GRID D/7) 1 0.900 0.30 4.050 9.72
COLUMN-C7 (GRID A/2) 1 1.000 0.30 4.050 10.53
COLUMN-C7 (GRID C/2) 1 1.000 0.30 4.050 10.53
COLUMN-C2 (GRID A/1) 1 0.600 0.30 4.050 7.29
COLUMN-C4 (GRID C/1) 1 0.750 0.30 4.050 8.51
COLUMN-C1 (GRID B/6) 1 0.450 0.23 4.050 5.51
COLUMN-C1 (GRID E/8) 1 0.450 0.23 4.050 5.51

BEAM
Level 25.15M
Item Code
Ordinary form work
0301007a
LENGTH BREADTH DEPTH QUANTITY
DESCRIPTION NO REMARK
SR NO (M) (M) (M) (Sqm)
1 BEAM B5 (A/1 TO C/1) (300X600)
BOTTOM 1 3.280 0.30 0.98
SIDE 2 3.280 0.450 2.95

2 BEAM B6 (C/1 TO D/1) (300X600)


BOTTOM 1 5.385 0.30 1.62
SIDE 2 5.385 0.450 4.85

3 BEAM B5 (D/1 TO F/1) (300X600)


BOTTOM 1 5.315 0.30 1.59
SIDE 2 5.315 0.450 4.78

4 BEAM B5 (A/9 TO C/9) (300X600)


BOTTOM 1 3.365 0.30 1.01
SIDE 2 3.365 0.450 3.03

5 BEAM B6 (C/9 TO D/9) (300X600)


BOTTOM 1 5.165 0.30 1.55
SIDE 2 5.165 0.450 4.65

6 BEAM B5 (D/9 TO F/9) (300X600)


BOTTOM 1 5.450 0.30 1.64
SIDE 2 5.450 0.450 4.91

7 BEAM B1 (F/1 TO F/2) (300X600)


BOTTOM 1 6.015 0.30 1.80
SIDE 2 6.015 0.450 5.41

8 BEAM B2 (F/2 TO F/3) (300X600)


BOTTOM 1 5.135 0.30 1.54
SIDE 2 5.135 0.450 4.62

9 BEAM B2 (F/3 TO F/4) (300X600)


BOTTOM 1 6.200 0.30 1.86
SIDE 2 6.200 0.450 5.58

10 BEAM B2 (F/4 TO F/5) (300X600)


BOTTOM 1 4.650 0.30 1.40
SIDE 2 4.650 0.450 4.19

11 BEAM B2 (F/5 TO F/7) (300X600)


BOTTOM 1 4.315 0.30 1.29
SIDE 2 4.315 0.450 3.88

12 BEAM B1 (F/7 TO F/9) (300X600)


BOTTOM 1 3.865 0.30 1.16
SIDE 2 3.865 0.450 3.48

13 BEAM B1 (A/1 TO A/2) (300X600)


BOTTOM 1 5.545 0.30 1.66
SIDE 2 5.545 0.450 4.99
Item Code
Ordinary form work
0301007a
LENGTH BREADTH DEPTH QUANTITY
DESCRIPTION NO REMARK
SR NO (M) (M) (M) (Sqm)
14 BEAM B2 (A/2 TO A/3) (300X600)
BOTTOM 1 5.780 0.30 1.73
SIDE 2 5.780 0.450 5.20

15 BEAM B2 (A/3 TO A/4) (300X600)


BOTTOM 1 6.375 0.30 1.91
SIDE 2 6.375 0.450 5.74

16 BEAM B2 (A/4 TO A/5) (300X600)


BOTTOM 1 4.135 0.30 1.24
SIDE 2 4.135 0.450 3.72

17 BEAM B2 (A/5 TO A/7) (300X600)


BOTTOM 1 3.795 0.30 1.14
SIDE 2 3.795 0.450 3.42

18 BEAM B1 (A/7 TO A/9) (300X600)


BOTTOM 1 4.500 0.30 1.35
SIDE 2 4.500 0.450 4.05

19 BEAM B4 (C/1 TO C/2) (300X600)


BOTTOM 1 5.545 0.30 1.66
SIDE 2 5.545 0.450 4.99

20 BEAM B7 (A-2 TO C-2) (300X600)


BOTTOM 1 3.880 0.30 1.16
SIDE 2 3.880 0.450 3.49

21 BEAM B10 (A-5 TO C-5) (300X600)


BOTTOM 1 3.880 0.30 1.16
SIDE 2 3.880 0.450 3.49

22 BEAM B09 (C-5 TO C-7) (300X600)


BOTTOM 1 4.500 0.30 1.35
SIDE 2 4.500 0.450 4.05

23 BEAM B10 (A-7 TO C-7) (300X600)


BOTTOM 1 3.180 0.30 0.95
SIDE 2 3.180 0.450 2.86

24 BEAM B8 (D-5 TO F-5) (300X600)


BOTTOM 1 5.450 0.30 1.64
SIDE 2 5.450 0.450 4.91
Item Code
Ordinary form work
0301007a
LENGTH BREADTH DEPTH QUANTITY
DESCRIPTION NO REMARK
SR NO (M) (M) (M) (Sqm)

25 BEAM B8 (D-7 TO F-7) (300X600)


BOTTOM 1 5.450 0.30 1.64
SIDE 2 5.450 0.450 4.91

26 BEAM B3 (D-5 TO F-7) (300X975)


BOTTOM 1 3.815 0.30 1.14
SIDE 2 3.815 0.825 6.29

SLAB CHAJJA (25.15M)


GRID F & A 2 35.83 0.3 21.50
GRID 1 & 9 2 16.23 0.3 9.74

PERIMETER SIDES
GRID F & A 2 35.83 0.15 10.75
GRID 1 & 9 2 16.23 0.15 4.87
STAIRCASE-1
2 4.315 0.15 1.29
2 5.45 0.15 1.64
STAIRCASE-2
2 6.315 0.15 1.89
2 3.380 0.15 1.01
LIFT-1
2 5.45 0.15 1.64
2 4.615 0.15 1.38
LIFT-2
2 3.880 0.15 1.16
2 4.500 0.15 1.35
OPENING SIDES
Cutout (2/3-A) TWO OPENING 2 1.800 0.15 0.54 ALL PERIMETERS
Cutout (2/3-F) (900x300) 1 2.400 0.15 0.36 ALL PERIMETERS
Cutout (3/4-F) (700x275) 1 1.950 0.15 0.29 ALL PERIMETERS
Cutout (7/9-A) (700x200) 1 1.800 0.15 0.27 ALL PERIMETERS
Cutout (D-F/2-3) (970x850) 2 3.640 0.15 1.09 ALL PERIMETERS
Cutout (D-F/3-4) (930x600) 2 3.060 0.15 0.92 ALL PERIMETERS

STAIRCASE-1 LEVEL 16.75 to 20.95 M

Flight-1 (16.750M TO 18.100M)


Bottom
Bottom 1 0.200 1.565 0.313
Waist Slab 1 2.851 1.565 4.462
Sides -
Waist Slab both sides 2 2.683 0.225 1.207
Top Trangle Both Sides 1 0.353 0.177 0.062
Steps both side 8 0.300 0.150 0.360
Raiser 9 0.150 1.565 2.113

Mid Landing 18.100M


Item Code
Ordinary form work
0301007a
LENGTH BREADTH DEPTH QUANTITY
DESCRIPTION NO REMARK
SR NO (M) (M) (M) (Sqm)
Bottom 1 1.192 1.618 1.929
Side 1 1.545 0.225 0.348

Flight-2 (18.100M TO 18.850M)


Bottom 1 1.677 1.545 2.591
Sides -
Waist Slab one sides 1 1.342 0.225 0.302
Top Trangle one Sides 0.5 0.353 0.177 0.031
Steps one side 2 0.300 0.15 0.090
Raiser 5 0.150 1.545 1.159

Mid Landing 18.850M


Bottom 1 1.200 1.600 1.920
side 1 1.545 0.225 0.348

Flight-3 (18.850M TO 20.20M)


Bottom 1 3.019 1.550 4.679
Sides -
Waist Slab both sides 2 2.683 0.225 1.207
Top Trangle both Sides 1 0.353 0.177 0.062
Steps both side 8 0.300 0.15 0.360
Raiser 9 0.150 1.550 2.093

Mid Landing 20.20M


Bottom 1 1.222 1.600 1.955
side 1 1.575 0.225 0.354

Flight-4 (20.20M TO 20.95M)


Bottom 1 1.677 1.575 2.641
Sides -
Waist Slab one sides 1 1.342 0.225 0.302
Top Trangle one Sides 0.5 0.353 0.177 0.031
Steps one side 2 0.300 0.15 0.090
Raiser 5 0.150 1.575 1.181

Mid Landing 20.95M


Bottom 1 1.212 1.630 1.976
side 1 1.575 0.225 0.354

Mid Landing Beam (230x975)


Bottom 1 4.315 0.230 0.992
Sides 2 4.315 0.975 8.414

STAIRCASE-1 LEVEL 20.95 to 25.15 M


2 20.95 to 25.15 M Column (M25) -
Item Code
Ordinary form work
0301007a
LENGTH BREADTH DEPTH QUANTITY
DESCRIPTION NO REMARK
SR NO (M) (M) (M) (Sqm)

Flight-1 (20.950M TO 22.300M)


Bottom
Bottom 1 0.200 1.565 0.313
Waist Slab 1 2.851 1.565 4.462
Sides -
Waist Slab both sides 2 2.683 0.225 1.207
Top Trangle Both Sides 1 0.353 0.177 0.062
Steps both side 8 0.300 0.150 0.360
Raiser 9 0.150 1.565 2.113

Mid Landing 22.300M


Bottom 1 1.192 1.618 1.929
Side 1 1.545 0.225 0.348

Flight-1 (22.300M TO 23.050M)


Bottom 1 1.677 1.545 2.591
Sides -
Waist Slab one sides 1 1.342 0.225 0.302
Top Trangle one Sides 0.5 0.353 0.177 0.031
Steps one side 2 0.300 0.15 0.090
Raiser 5 0.150 1.545 1.159

Mid Landing 23.050M


Bottom 1 1.200 1.600 1.920
side 1 1.545 0.225 0.348

Flight-1 (23.050M TO 24.40M)


Bottom 1 3.019 1.550 4.679
Sides -
Waist Slab both sides 2 2.683 0.225 1.207
Top Trangle both Sides 1 0.353 0.177 0.062
Steps both side 8 0.300 0.15 0.360
Raiser 9 0.150 1.550 2.093

Mid Landing 24.40M


Bottom 1 1.222 1.600 1.955
side 1 1.575 0.225 0.354

Flight-1 (24.40M TO 25.15M)


Bottom 1 1.677 1.575 2.641
Sides -
Waist Slab one sides 1 1.342 0.225 0.302
Top Trangle one Sides 0.5 0.353 0.177 0.031
Steps one side 2 0.300 0.15 0.090
Raiser 5 0.150 1.575 1.181

Mid Landing 25.15M


Bottom 1 1.212 1.630 1.976
side 1 1.575 0.225 0.354
Item Code
Ordinary form work
0301007a
LENGTH BREADTH DEPTH QUANTITY
DESCRIPTION NO REMARK
SR NO (M) (M) (M) (Sqm)
Mid Landing Beam (230x975)
Bottom 1 4.315 0.230 0.992
Sides 2 4.315 0.975 8.414

RA03 (PO 2021)

LINTEL BEAM (LEVEL 20.15 M)


1 LB1 (C/1 TO D/1) (200X300)
BOTTOM 1 5.385 0.20 1.08
SIDE 2 5.385 0.300 3.23

2 LB1 (D/1 TO F/1) (200X300)


BOTTOM 1 5.315 0.20 1.06
SIDE 2 5.315 0.300 3.19

3 LB1 (A/9 TO C/9) (200X300)


BOTTOM 1 3.365 0.20 0.67
SIDE 2 3.365 0.300 2.02

4 LB1 (C/9 TO D/9) (200X300)


BOTTOM 1 5.165 0.20 1.03
SIDE 2 5.165 0.300 3.10

5 LB1 (D/9 TO F/9) (200X300)


BOTTOM 1 5.450 0.20 1.09
SIDE 2 5.450 0.300 3.27

6 LB1 (F/1 TO F/2) (200X300)


BOTTOM 1 6.015 0.20 1.20
SIDE 2 6.015 0.300 3.61

7 LB1 (F/2 TO F/3) (200X300)


BOTTOM 1 5.135 0.20 1.03
SIDE 2 5.135 0.300 3.08

8 LB1 (F/3 TO F/4) (200X300)


BOTTOM 1 6.200 0.20 1.24
SIDE 2 6.200 0.300 3.72

9 LB1 (F/4 TO F/5) (200X300)


BOTTOM 1 4.650 0.20 0.93
SIDE 2 4.650 0.300 2.79

10 LB1 (F/7 TO F/9) (200X300)


BOTTOM 1 3.865 0.20 0.77
SIDE 2 3.865 0.300 2.32

11 LB1 (A/2 TO A/3) (200X300)


BOTTOM 1 5.780 0.20 1.16
SIDE 2 5.780 0.300 3.47

12 LB1 (A/3 TO A/4) (200X300)


Item Code
Ordinary form work
0301007a
LENGTH BREADTH DEPTH QUANTITY
DESCRIPTION NO REMARK
SR NO (M) (M) (M) (Sqm)
BOTTOM 1 6.375 0.20 1.28
SIDE 2 6.375 0.300 3.83

13 LB1 (A/4 TO A/5) (200X300)


BOTTOM 1 4.135 0.20 0.83
SIDE 2 4.135 0.300 2.48

14 LB1 (A/5 TO A/7) (200X300)


BOTTOM 1 3.795 0.20 0.76
SIDE 2 3.795 0.300 2.28

15 LB1 (A/7 TO A/9) (200X300)


BOTTOM 1 4.500 0.20 0.90
SIDE 2 4.500 0.300 2.70

16 LB2 (C/1 TO C/2) (200X300)


BOTTOM 1 5.545 0.20 1.11
SIDE 2 5.545 0.300 3.33

17 LB2 (A-7 TO C-7) (200X300)


BOTTOM 1 3.180 0.20 0.64
SIDE 2 3.180 0.300 1.91

COLUMN
25.15 to 29.5 M Column (M25) -
COLUMN-C2 (GRID D/1) 1 0.600 0.30 1.000 1.80
COLUMN-C2 (GRID F/1) 1 0.600 0.30 1.000 1.80
COLUMN-C2 (GRID F/4) 1 0.600 0.30 1.000 1.80
COLUMN-C4 (GRID F/3) 1 0.750 0.30 1.000 2.10
COLUMN-C7 (GRID F/2) 1 1.000 0.30 1.000 2.60
COLUMN-C7 (GRID A/4) 1 1.000 0.30 1.000 2.60
COLUMN-C8 (GRID A/3) 1 1.000 0.30 1.000 2.60
COLUMN-C2 (GRID A/9) 1 0.600 0.30 1.000 1.80
COLUMN-C4 (GRID C/9) 1 0.750 0.30 1.000 2.10
COLUMN-C3 (GRID A/5) 1 0.750 0.30 4.200 8.82
COLUMN-C3 (GRID A/7) 1 0.750 0.30 4.200 8.82
COLUMN-C7 (GRID C/5) 1 1.000 0.30 4.200 10.92
COLUMN-C7 (GRID C/7) 1 1.000 0.30 4.200 10.92
COLUMN-C2 (GRID D/9) 1 0.600 0.30 4.150 7.47
COLUMN-C2 (GRID F/9) 1 0.600 0.30 4.150 7.47
COLUMN-C4 (GRID F/7) 1 0.750 0.30 4.150 8.72
COLUMN-C4 (GRID F/5) 1 0.750 0.30 4.150 8.72
COLUMN-C7 (GRID D/5) 1 1.000 0.30 4.150 10.79
COLUMN-C5 (GRID D/7) 1 0.900 0.30 4.150 9.96
COLUMN-C7 (GRID A/2) 1 1.000 0.30 4.150 10.79
COLUMN-C7 (GRID C/2) 1 1.000 0.30 4.150 10.79
COLUMN-C2 (GRID A/1) 1 0.600 0.30 4.150 7.47
COLUMN-C4 (GRID C/1) 1 0.750 0.30 4.150 8.72
COLUMN-C1 (GRID B/6) 1 0.450 0.23 0.350 0.48
COLUMN-C1 (GRID E/8) 1 0.450 0.23 0.350 0.48

BEAM
Level 25.65M
Item Code
Ordinary form work
0301007a
LENGTH BREADTH DEPTH QUANTITY
DESCRIPTION NO REMARK
SR NO (M) (M) (M) (Sqm)
Lift-1
B1 (F/7 TO F/9) (230X500) OUTER SIDES 1 3.870 0.500 1.94
B4 (D/9 TO F/9) (230X500) OUTER SIDES 1 5.450 0.500 2.73
B2 (E/8 TO E/9) (230X500) OUTER SIDES 1 2.370 0.500 1.19
B3 (E/8 TO F/8) (230X500) OUTER SIDES 1 2.150 0.500 1.08

B1 (F/7 TO F/9) (230X500) INNER SIDES 1 3.870 0.350 1.35


B4 (D/9 TO F/9) (230X500) INNER SIDES 1 5.450 0.350 1.91
B2 (E/8 TO E/9) (230X500) INNER SIDES 1 2.370 0.350 0.83
B3 (E/8 TO F/8) (230X500) INNER SIDES 1 2.150 0.350 0.75

Lift-2
B1 (F/7 TO F/9) (230X500) OUTER SIDES 1 3.795 0.500 1.90
B4 (D/9 TO F/9) (230X500) OUTER SIDES 1 3.180 0.500 1.59
B2 (E/8 TO E/9) (230X500) OUTER SIDES 1 2.370 0.500 1.19
B3 (E/8 TO F/8) (230X500) OUTER SIDES 1 2.150 0.500 1.08

B1 (F/7 TO F/9) (230X500) INNER SIDES 1 3.795 0.350 1.33


B4 (D/9 TO F/9) (230X500) INNER SIDES 1 3.180 0.350 1.11
B2 (E/8 TO E/9) (230X500) INNER SIDES 1 2.370 0.350 0.83
B3 (E/8 TO F/8) (230X500) INNER SIDES 1 2.150 0.350 0.75

SLAB
Level 25.65M
Lift-1
BOTTOM 1 2.370 2.370 5.62

Lift-2
BOTTOM 1 2.370 2.370 5.62

BEAM
Level 29.5 M
STAIRCASE-2
1 BEAM B9 (A/1 TO C/1) (300X600)
BOTTOM 1 3.280 0.30 0.98
SIDE 2 3.280 0.40 2.62

2 BEAM B7 (A/1 TO A/2) (300X600)


BOTTOM 1 5.545 0.30 1.66
SIDE 2 5.545 0.40 4.44

3 BEAM B7 (C/1 TO C/2) (300X600)


BOTTOM 1 5.545 0.30 1.66
SIDE 2 5.545 0.40 4.44

4 BEAM B9 (A-2 TO C-2) (300X600)


BOTTOM 1 3.880 0.30 1.16
SIDE 2 3.880 0.40 3.10

5 BEAM B8 (A-C/1 TO A-C/2) (300X600)


BOTTOM 1 6.245 0.30 1.87
SIDE 2 6.245 0.40 5.00

STAIRCASE-1
Item Code
Ordinary form work
0301007a
LENGTH BREADTH DEPTH QUANTITY
DESCRIPTION NO REMARK
SR NO (M) (M) (M) (Sqm)
6 BEAM B1 (F/5 TO F/7) (300X600)
BOTTOM 1 4.315 0.30 1.29
SIDE 2 4.315 0.40 3.45

7 BEAM B1 (F/7 TO F/9) (300X600)


BOTTOM 1 3.865 0.30 1.16
SIDE 2 3.865 0.40 3.09

8 BEAM B1 (D-5 TO D-7) (300X975)


BOTTOM 1 3.830 0.30 1.15
SIDE 2 3.830 0.40 3.06

9 BEAM B1 (D/7 TO D/9) (300X600)


BOTTOM 1 4.030 0.30 1.21
SIDE 2 4.030 0.40 3.22

10 BEAM B3 (D-5 TO F-5) (300X600)


BOTTOM 1 5.450 0.30 1.64
SIDE 2 5.450 0.40 4.36

11 BEAM B4 (D/5-7 TO F/5-7) (300X600)


BOTTOM 1 5.450 0.30 1.64
SIDE 2 5.450 0.40 4.36

12 BEAM B5 (D-7 TO F-7) (300X600)


BOTTOM 1 5.450 0.30 1.64
SIDE 2 5.450 0.40 4.36

13 BEAM B6 (D/7-9 TO F/7-9) (230X600)


BOTTOM 1 5.450 0.23 1.25
SIDE 2 5.450 0.40 4.36

14 BEAM B3 (D/9 TO F/9) (300X600)


BOTTOM 1 5.450 0.30 1.64
SIDE 2 5.450 0.40 4.36

LIFT-2
15 BEAM B2 (A/5 TO A/7) (230X600)
BOTTOM 1 3.795 0.23 0.87
SIDE 2 3.795 0.45 3.42

16 BEAM B2 (C/5 TO C/7) (230X600)


BOTTOM 1 4.500 0.23 1.04
SIDE 2 4.500 0.45 4.05

17 BEAM B6 (A/5-7 TO C/5-7) (230X600)


BOTTOM 1 4.020 0.23 0.92
SIDE 2 4.020 0.45 3.62

18 BEAM B10 (A-5 TO C-5) (230X600)


BOTTOM 1 3.880 0.23 0.89
SIDE 2 3.880 0.45 3.49

19 BEAM B10 (A-7 TO C-7) (230X600)


BOTTOM 1 3.180 0.23 0.73
Item Code
Ordinary form work
0301007a
LENGTH BREADTH DEPTH QUANTITY
DESCRIPTION NO REMARK
SR NO (M) (M) (M) (Sqm)
SIDE 2 3.180 0.45 2.86

SLAB
Level 29.5 M
STAIRCASE-1
BOTTOM
SPAN-1 1 5.450 2.100 11.45
SPAN-2 1 5.450 1.915 10.44
SPAN-3 1 5.450 2.085 11.36
SPAN-4 1 5.450 2.300 12.54
CHAJJA ALONG GRID-F 1 10.73 0.300 3.22
CHAJJA ALONG GRID-D 1 10.73 0.600 6.44
CHAJJA ALONG GRID-5 1 6.950 0.600 4.17
CHAJJA ALONG GRID-7 1 6.950 0.300 2.09
SIDES
LONG SIDE 2 10.73 0.200 4.29
SHORT SIDE 2 6.950 0.200 2.78

STAIRCASE-2
BOTTOM
SPAN-1 1 6.245 1.790 11.18
SPAN-2 1 6.245 1.790 11.18
CHAJJA ALONG GRID-A 1 7.745 0.300 2.32
CHAJJA ALONG GRID-C 1 7.745 0.600 4.65
CHAJJA ALONG GRID-1 1 5.380 0.300 1.61
CHAJJA ALONG GRID-2 1 5.380 0.600 3.23
SIDES
LONG SIDE 2 7.745 0.200 3.10
SHORT SIDE 2 5.380 0.200 2.15

Lift-2
BOTTOM
SPAN-1 1 4.020 1.900 7.64
SPAN-2 1 4.020 2.370 9.53
CHAJJA ALONG GRID-A 1 6.330 0.300 1.90
CHAJJA ALONG GRID-C 1 6.330 0.600 3.80
CHAJJA ALONG GRID-5 1 5.380 0.770 4.14
CHAJJA ALONG GRID-7 1 5.380 0.600 3.23
SIDES
LONG SIDE 2 6.330 0.150 1.90
SHORT SIDE 2 5.380 0.150 1.61

STAIRCASE-2
2 16.75 to 20.95 M Column -

Flight-1 (16.750M TO 18.55M)


Bottom
Bottom 1 0.200 1.500 0.300
Waist Slab 1 3.857 1.500 5.786
Sides -
Waist Slab both sides 2 3.692 0.225 1.661
Top Trangle Both Sides 1 0.353 0.177 0.062
Steps both side 11 0.300 0.150 0.495
Raiser 12 0.150 1.500 2.700
Item Code
Ordinary form work
0301007a
LENGTH BREADTH DEPTH QUANTITY
DESCRIPTION NO REMARK
SR NO (M) (M) (M) (Sqm)

Mid Landing 18.550M


Bottom 1 1.146 1.613 1.848
Side 1 1.500 0.225 0.338

Flight-2 (18.550M TO 19.150M)


Bottom 1 1.342 1.500 2.013
Sides -
Waist Slab one sides 1 1.000 0.225 0.225
Top Trangle one Sides 0.5 0.353 0.177 0.031
Steps one side 1.5 0.300 0.15 0.068
Raiser 4 0.150 1.500 0.900

Mid Landing 19.150M


Bottom 1 1.137 1.552 1.765
side 1 1.500 0.225 0.338

Flight-3 (19.150M TO 20.95M)


Bottom 1 4.025 1.500 6.038
Sides -
Waist Slab both sides 2 3.690 0.225 1.661
Top Trangle both Sides 1 0.353 0.177 0.062
Steps both side 11 0.300 0.15 0.495
Raiser 12 0.150 1.500 2.700

Floor Landing 20.20M


Bottom 1 1.162 1.500 1.743
Bottom 1 2.450 1.500 3.675
side 1 2.450 0.225 0.551

Mid Landing Beam (230x975)


Bottom 1 3.880 0.230 0.892
Sides 2 3.880 0.825 6.402

STAIRCASE-2
2 20.95 to 25.15 M Column (M25) -

Flight-1 (20.950M TO 22.750M)


Bottom
Bottom 1 0.200 1.500 0.300
Waist Slab 1 3.857 1.500 5.786
Sides -
Waist Slab both sides 2 3.692 0.225 1.661
Top Trangle Both Sides 1 0.353 0.177 0.062
Steps both side 11 0.300 0.150 0.495
Raiser 12 0.150 1.500 2.700

Mid Landing 22.750M


Bottom 1 1.146 1.613 1.848
Side 1 1.500 0.225 0.338

Flight-2 (22.750M TO 23.350M)


Bottom 1 1.342 1.500 2.013
Item Code
Ordinary form work
0301007a
LENGTH BREADTH DEPTH QUANTITY
DESCRIPTION NO REMARK
SR NO (M) (M) (M) (Sqm)
Sides -
Waist Slab one sides 1 1.000 0.225 0.225
Top Trangle one Sides 0.5 0.353 0.177 0.031
Steps one side 1.5 0.300 0.15 0.068
Raiser 4 0.150 1.500 0.900

Mid Landing 23.350M


Bottom 1 1.137 1.552 1.765
side 1 1.500 0.225 0.338

Flight-1 (23.350M TO 25.15M)


Bottom 1 4.025 1.500 6.038
Sides -
Waist Slab both sides 2 3.690 0.225 1.661
Top Trangle both Sides 1 0.353 0.177 0.062
Steps both side 11 0.300 0.15 0.495
Raiser 12 0.150 1.500 2.700

Floor Landing 25.15M


Bottom 1 1.162 1.500 1.743
Bottom 1 2.450 1.500 3.675
side 1 2.450 0.225 0.551

Mid Landing Beam (230x975)


Bottom 1 3.880 0.230 0.892
Sides 2 3.880 0.825 6.402

TOTAL QTY 1,512.29


PREVIOUS CLAIM 67.24 RA BILL NO 02
PREVIOUS CLAIM 235.05 RA BILL NO 04

PREVIOUS CLAIM RA BILL NO 01 (PO


116.66 2021)
PREVIOUS CLAIM RA BILL NO 02 (PO
519.48 2021)
RA BILL NO 03 (PO
THIS BILL QTY 573.87 2021)
Item Code
03010010c
Plate Inserts Including Hold Fasts
TOTAL
SR NO DESCRIPTION NO L B H QUANTITY (kg) REMARK
WEIGHT (Kg)

Level 25.15 M
2 Bracket no-1 Refer PEB Drawing Number
1 PLATE 2 0.45 0.3 0.012 25.434 50.868 BKT:01
2 ANCHORE BOLT (20MM DIA -150MM) 12 0.5 6 BKT:01

PREVIOUS CLAIM 0.06 RA BILL NO 02 (PO 2021)


Item Code
PEB Structural Members
301023
TOTAL
SR NO DESCRIPTION NO QUANTITY (kg) REMARK
WEIGHT (Kg)

RA02
Level 16.75M to 25.15M
1 Column Refer PEB Drawing Number
1 MEZZANINE COLUMN 1 996.42 996.42 SAN-J-229-MC 201-R0
2 MEZZANINE COLUMN 1 972.71 972.71 SAN-J-229-MC 202-R0
3 MEZZANINE COLUMN 1 972.71 972.71 SAN-J-229-MC 203-R0
4 MEZZANINE COLUMN 1 972.71 972.71 SAN-J-229-MC 204-R0
5 MEZZANINE COLUMN 1 970.74 970.74 SAN-J-229-MC 205-R0

Level 20.95 M
2 Bracket no-1 Refer PEB Drawing Number
1 AT Column C7 (Grid no:- F-2) 1 91.09 91.09 BKT:01
2 AT Column C4 (Grid no:- F-3) 1 91.09 91.09 BKT:01
3 AT Column C2 (Grid no:- F-4) 1 91.09 91.09 BKT:01
4 AT Column C3 (Grid no:- A-7) 1 91.09 91.09 BKT:01
5 AT Column C3 (Grid no:- A-5) 1 91.09 91.09 BKT:01
6 AT Column C7 (Grid no:- A-4) 1 91.09 91.09 BKT:01
7 AT Column C8 (Grid no:- A-3) 1 91.09 91.09 BKT:01
8 AT Column C7 (Grid no:- C-7) 2 91.09 182.18 BKT:01
9 AT Column C7 (Grid no:- C-5) 2 91.09 182.18 BKT:01
10 AT Column C6 (Grid no:- D-7) 1 91.09 91.09 BKT:01
11 AT Column C7 (Grid no:- D-5) 1 91.09 91.09 BKT:01

Level 20.95 M
3 Bracket no-2 Refer PEB Drawing Number
1 AT Column C7 (Grid no:- C-2) 1 99.27 99.27 BKT:02

Level 20.95 M
4 Bracket no-3 Refer PEB Drawing Number
1 BEAM B7 A/2 TO C/2 5 18.2 91 BKT:03
2 BEAM B6 C/1 TO D/1 5 18.2 91 BKT:03
3 BEAM B5 D/1 TO F/1 5 18.2 91 BKT:03
4 COLUMN C7 (Grid no:- C-5) 2 18.2 36.4 BKT:03
5 BEAM B8 D/5 TO F/5 5 18.2 91 BKT:03
6 COLUMN C1 (Grid no:- B-6) 3 18.2 54.6 BKT:03
7 BEAM B2 A/5 TO A/7 1 18.2 18.2 BKT:03
8 COLUMN C7 (Grid no:- C-7) 4 18.2 72.8 BKT:03
9 COLUMN C5 (Grid no:- D-7) 1 18.2 18.2 BKT:03
10 BEAM B8 D/7 TO F/7 4 18.2 72.8 BKT:03
11 COLUMN C1 (Grid no:- E-8) 3 18.2 54.6 BKT:03
12 BEAM B1 F/7 TO F/9 1 18.2 18.2 BKT:03
13 BEAM B5 D/9 TO F/9 3 18.2 54.6 BKT:03
14 BEAM B6 C/9 TO D/9 5 18.2 91 BKT:03
15 BEAM B5 A/9 TO C/9 4 18.2 72.8 BKT:03

Level 25.15 M
2 Bracket no-1 Refer PEB Drawing Number
1 AT Column C7 (Grid no:- F-2) 1 91.09 91.09 BKT:01
2 AT Column C4 (Grid no:- F-3) 1 91.09 91.09 BKT:01
3 AT Column C2 (Grid no:- F-4) 1 91.09 91.09 BKT:01
4 AT Column C3 (Grid no:- A-7) 1 91.09 91.09 BKT:01
5 AT Column C3 (Grid no:- A-5) 1 91.09 91.09 BKT:01
6 AT Column C7 (Grid no:- A-4) 1 91.09 91.09 BKT:01
7 AT Column C8 (Grid no:- A-3) 1 91.09 91.09 BKT:01
8 AT Column C7 (Grid no:- C-7) 2 91.09 182.18 BKT:01
9 AT Column C7 (Grid no:- C-5) 2 91.09 182.18 BKT:01
10 AT Column C6 (Grid no:- D-7) 1 91.09 91.09 BKT:01
11 AT Column C7 (Grid no:- D-5) 1 91.09 91.09 BKT:01
Item Code
PEB Structural Members
301023
TOTAL
SR NO DESCRIPTION NO QUANTITY (kg) REMARK
WEIGHT (Kg)
Level 25.15 M
3 Bracket no-2 Refer PEB Drawing Number
1 AT Column C7 (Grid no:- C-2) 1 99.27 99.27 BKT:02

Level 25.15 M
4 Bracket no-3 Refer PEB Drawing Number
1 BEAM B7 A/2 TO C/2 5 18.2 91 BKT:03
2 BEAM B6 C/1 TO D/1 5 18.2 91 BKT:03
3 BEAM B5 D/1 TO F/1 5 18.2 91 BKT:03
4 COLUMN C7 (Grid no:- C-5) 2 18.2 36.4 BKT:03
5 BEAM B8 D/5 TO F/5 5 18.2 91 BKT:03
6 COLUMN C1 (Grid no:- B-6) 3 18.2 54.6 BKT:03
7 BEAM B2 A/5 TO A/7 1 18.2 18.2 BKT:03
8 COLUMN C7 (Grid no:- C-7) 4 18.2 72.8 BKT:03
9 COLUMN C5 (Grid no:- D-7) 1 18.2 18.2 BKT:03
10 BEAM B8 D/7 TO F/7 4 18.2 72.8 BKT:03
11 COLUMN C1 (Grid no:- E-8) 3 18.2 54.6 BKT:03
12 BEAM B1 F/7 TO F/9 1 18.2 18.2 BKT:03
13 BEAM B5 D/9 TO F/9 3 18.2 54.6 BKT:03
14 BEAM B6 C/9 TO D/9 5 18.2 91 BKT:03
15 BEAM B5 A/9 TO C/9 4 18.2 72.8 BKT:03

Level 16.75 M
5 Template Refer PEB Drawing Number
1 COLUMN-C6 Pedestral 1 11.304 11.304 AB:02
2 COLUMN-C8 Pedestral 1 11.304 11.304 AB:02
3 COLUMN-C7 Pedestral 1 11.304 11.304 AB:02
4 COLUMN-C9 Pedestral 1 11.304 11.304 AB:02
5 COLUMN-C9 Pedestral 1 11.304 11.304 AB:02

RA03
1 Portal Column Refer PEB Drawing Number
1 PC-301 3 640.42 1921.26 SAN-J-229-PC 301-R0
2 Portal Beam Refer PEB Drawing Number
2 PB-401 2 666.47 1332.94 SAN-J-229-PB 401-R0
2 Beam Refer PEB Drawing Number
3 MB-301 2 553.75 1107.5 SAN-J-229-MB 301-R0
4 MB-302 2 689.14 1378.28 SAN-J-229-MB 302-R0
5 MB-303 4 607.96 2431.84 SAN-J-229-MB 303-R0
6 MB-304 2 679.50 1359 SAN-J-229-MB 304-R0
7 MB-305 2 409.99 819.98 SAN-J-229-MB 305-R0
8 MB-306 2 671.86 1343.72 SAN-J-229-MB 306-R0
9 MB-307 2 417.62 835.24 SAN-J-229-MB 307-R0
10 MB-308 4 613.61 2454.44 SAN-J-229-MB 308-R0
3 Joist Refer PEB Drawing Number
11 MJ-501 11 239.78 2637.58 SAN-J-229-MJ 501-R0
12 MJ-502 12 226.16 2713.92 SAN-J-229-MJ 502-R0
13 MJ-503 5 224.07 1120.35 SAN-J-229-MJ 503-R0
14 MJ-504 13 351.55 4570.15 SAN-J-229-MJ 504-R0
15 MJ-504A 2 348.75 697.5 SAN-J-229-MJ 504A-R0
16 MJ-505 6 187.68 1126.08 SAN-J-229-MJ 505-R0
17 MJ-505A 1 190.45 190.45 SAN-J-229-MJ 505A-R0
Item Code
PEB Structural Members
301023
TOTAL
SR NO DESCRIPTION NO QUANTITY (kg) REMARK
WEIGHT (Kg)
18 MJ-505B 1 190.45 190.45 SAN-J-229-MJ 505B-R0
19 MJ-506 5 183.04 915.2 SAN-J-229-MJ 506-R0
20 MJ-507 2 175.29 350.58 SAN-J-229-MJ 507-R0
21 MJ-508 1 139.5 139.5 SAN-J-229-MJ 508-R0
22 MJ-509 5 165.91 829.55 SAN-J-229-MJ 509-R0
23 MJ-511 2 161.29 322.58 SAN-J-229-MJ 511-R0
24 MJ-512 2 66.81 133.62 SAN-J-229-MJ 512-R0
25 MJ-513 2 83.89 167.78 SAN-J-229-MJ 513-R0
26 MJ-514 2 70.49 140.98 SAN-J-229-MJ 514-R0
27 MJ-515 2 70.55 141.1 SAN-J-229-MJ 515-R0
28 MJ-516 10 158.73 1587.3 SAN-J-229-MJ 516-R0
29 MJ-517 2 154.22 308.44 SAN-J-229-MJ 517-R0
30 MJ-518 1 139.66 139.66 SAN-J-229-MJ 518-R0
31 MJ-519 2 161.49 322.98 SAN-J-229-MJ 519-R0
32 MJ-520 2 76.8 153.6 SAN-J-229-MJ 520-R0
33 MJ-521 2 69.53 139.06 SAN-J-229-MJ 521-R0
34 MJ-522 2 71.58 143.16 SAN-J-229-MJ 522-R0
35 MJ-523 2 73.7 147.4 SAN-J-229-MJ 523-R0
36 MJ-524 2 62.27 124.54 SAN-J-229-MJ 524-R0
5 Bracket Refer PEB Drawing Number
37 BKT-03 2 18.2 36.4 SAN-J-229-BKT 03-R0
38 DeductTemplate Refer PEB Drawing Number
1 COLUMN-C6 Pedestral -1 11.304 -11.304 AB:02
2 COLUMN-C8 Pedestral -1 11.304 -11.304 AB:02
3 COLUMN-C7 Pedestral -1 11.304 -11.304 AB:02
4 COLUMN-C9 Pedestral -1 11.304 -11.304 AB:02
5 COLUMN-C9 Pedestral -1 11.304 -11.304 AB:02

RA01 (PO 2021)


Level 16.75M to 25.15M

Level 20.95 M
1 Bracket no-3 Refer PEB Drawing Number
1 BEAM B10 A/5 TO C/5 8 18.2 145.6 BKT:03
2 BEAM A/7 TO C/7 3 18.2 54.6 BKT:03

Level 25.15 M
2 Bracket no-3 Refer PEB Drawing Number
3 BEAM B10 A/5 TO C/5 8 18.2 145.6 BKT:03
4 BEAM A/7 TO C/7 3 18.2 54.6 BKT:03

1 Portal Column Refer PEB Drawing Number


5 PC-301 1 640.42 640.42 SAN-J-229-PC 301-R0
2 Portal Beam Refer PEB Drawing Number
6 PB-401 2 666.47 1332.94 SAN-J-229-PB 401-R0
3 Joist Refer PEB Drawing Number
7 MJ-501 9 239.78 2158.02 SAN-J-229-MJ 501-R0
8 MJ-502 8 226.16 1809.28 SAN-J-229-MJ 502-R0
9 MJ-503 5 224.07 1120.35 SAN-J-229-MJ 503-R0
10 MJ-504 9 351.55 3163.95 SAN-J-229-MJ 504-R0
11 MJ-505 6 187.68 1126.08 SAN-J-229-MJ 505-R0
12 MJ-505A 1 190.45 190.45 SAN-J-229-MJ 505A-R0
13 MJ-505B 1 190.45 190.45 SAN-J-229-MJ 505B-R0
14 MJ-506 3 183.04 549.12 SAN-J-229-MJ 506-R0
15 MJ-508 1 139.5 139.5 SAN-J-229-MJ 508-R0
16 MJ-509 5 165.91 829.55 SAN-J-229-MJ 509-R0
17 MJ-516 4 158.73 634.92 SAN-J-229-MJ 516-R0
18 MJ-517 2 154.22 308.44 SAN-J-229-MJ 517-R0
19 MJ-518 1 139.66 139.66 SAN-J-229-MJ 518-R0
Item Code
PEB Structural Members
301023
TOTAL
SR NO DESCRIPTION NO QUANTITY (kg) REMARK
WEIGHT (Kg)
20 MJ-519 2 161.49 322.98 SAN-J-229-MJ 519-R0
Item Code
PEB Structural Members
301023
TOTAL
SR NO DESCRIPTION NO QUANTITY (kg) REMARK
WEIGHT (Kg)

3 Structural bolt
BO:04 (M20MM Ø X 75MM + NUT+
1060 0.38 402.8
21 WASHERS)
BO:07 (M24MM Ø X 100MM +
70 0.68 47.6
22 NUT+ WASHERS)
BO:08 (M30MM Ø X 120MM +
400 1.74 696
23 NUT+ WASHERS)

RA02 (PO 2021)


Level 20.95 M
Bracket no-1 Refer PEB Drawing Number
1 AT Column C3 (Grid no:- A-7) -1 91.09 -91.09 BKT:01
2 AT Column C3 (Grid no:- A-5) -1 91.09 -91.09 BKT:01
1 AT Column C7 (Grid no:- C-7) -1 91.09 -91.09 BKT:01
2 AT Column C7 (Grid no:- C-5) -1 91.09 -91.09 BKT:01

Level 25.15 M
Bracket no-1 Refer PEB Drawing Number
1 AT Column C3 (Grid no:- A-7) -1 91.09 -91.09 BKT:01
2 AT Column C3 (Grid no:- A-5) -1 91.09 -91.09 BKT:01
1 AT Column C7 (Grid no:- C-7) -1 91.09 -91.09 BKT:01
2 AT Column C7 (Grid no:- C-5) -1 91.09 -91.09 BKT:01

EXTRA JOIST
LEVEL-6 ( MJ:513 ) (LIFT-2) 1 83.89 83.89 SAN-J-229-MJ 513-R0
LEVEL-6 ( MJ:520 ) (LIFT-1) 1 76.8 76.8 SAN-J-229-MJ 520-R0

SPLICE PLATE
1 LEVEL-5
MJ:514 ( 350MM WEB )
WEB 2 3.5325 7.065 SPLICE PLATE DETAIL
FLANGE 4 12.0576 48.2304 SPLICE PLATE DETAIL

2 LEVEL-6
PB:401 JOIN MC-202 TO MC204
( 400 MM WEB )
WEB 2 6.28 12.56 SPLICE PLATE DETAIL
FLANGE 4 14.0672 56.2688 SPLICE PLATE DETAIL

TOTAL QTY 59.54 MT


PREVIOUS CLAIM 34.42 RA BILL NO 03
PREVIOUS CLAIM 9.36 RA BILL NO 02
PREVIOUS CLAIM 16.21 RA BILL NO 01 (PO 2021)
PREVIOUS CLAIM -0.45 RA BILL NO 02 (PO 2021)
Item Code
PEB Structural Members Erection
800012
TOTAL
SR NO DESCRIPTION NO QUANTITY (kg) REMARK
WEIGHT (Kg)

RA04
Level 16.75M to 25.15M
1 Column Refer PEB Drawing Number
1 MEZZANINE COLUMN 1 996.42 996.42 SAN-J-229-MC 201-R0
2 MEZZANINE COLUMN 1 972.71 972.71 SAN-J-229-MC 202-R0
3 MEZZANINE COLUMN 1 972.71 972.71 SAN-J-229-MC 203-R0
4 MEZZANINE COLUMN 1 972.71 972.71 SAN-J-229-MC 204-R0
5 MEZZANINE COLUMN 1 970.74 970.74 SAN-J-229-MC 205-R0

Level 20.95 M
2 Bracket no-1 Refer PEB Drawing Number
1 AT Column C7 (Grid no:- F-2) 1 91.09 91.09 BKT:01
2 AT Column C4 (Grid no:- F-3) 1 91.09 91.09 BKT:01
3 AT Column C2 (Grid no:- F-4) 1 91.09 91.09 BKT:01
6 AT Column C7 (Grid no:- A-4) 1 91.09 91.09 BKT:01
7 AT Column C8 (Grid no:- A-3) 1 91.09 91.09 BKT:01
8 AT Column C7 (Grid no:- C-7) 1 91.09 91.09 BKT:01
9 AT Column C7 (Grid no:- C-5) 1 91.09 91.09 BKT:01
10 AT Column C6 (Grid no:- D-7) 1 91.09 91.09 BKT:01
11 AT Column C7 (Grid no:- D-5) 1 91.09 91.09 BKT:01

Level 20.95 M
3 Bracket no-2 Refer PEB Drawing Number
1 AT Column C7 (Grid no:- C-2) 1 99.27 99.27 BKT:02

Level 20.95 M
4 Bracket no-3 Refer PEB Drawing Number
1 BEAM B7 A/2 TO C/2 5 18.2 91 BKT:03
2 BEAM B6 C/1 TO D/1 5 18.2 91 BKT:03
3 BEAM B5 D/1 TO F/1 5 18.2 91 BKT:03
4 COLUMN C7 (Grid no:- C-5) 2 18.2 36.4 BKT:03
5 BEAM B8 D/5 TO F/5 5 18.2 91 BKT:03
6 COLUMN C1 (Grid no:- B-6) 3 18.2 54.6 BKT:03
7 BEAM B2 A/5 TO A/7 1 18.2 18.2 BKT:03
8 COLUMN C7 (Grid no:- C-7) 4 18.2 72.8 BKT:03
9 COLUMN C5 (Grid no:- D-7) 1 18.2 18.2 BKT:03
10 BEAM B8 D/7 TO F/7 4 18.2 72.8 BKT:03
11 COLUMN C1 (Grid no:- E-8) 3 18.2 54.6 BKT:03
12 BEAM B1 F/7 TO F/9 1 18.2 18.2 BKT:03
13 BEAM B5 D/9 TO F/9 3 18.2 54.6 BKT:03
14 BEAM B6 C/9 TO D/9 5 18.2 91 BKT:03
15 BEAM B5 A/9 TO C/9 5 18.2 91 BKT:03
16 BEAM B5 A/5 TO C/5 8 18.2 145.6 BKT:03
17 BEAM B5 A/7 TO C/7 5 18.2 91 BKT:03

Level 20.95 M
1 Portal Column Refer PEB Drawing Number
1 PC-301 4 640.42 2561.68 SAN-J-229-PC 301-R0
2 Portal Beam Refer PEB Drawing Number
2 PB-401 2 666.47 1332.94 SAN-J-229-PB 401-R0
2 Beam Refer PEB Drawing Number
3 MB-301 1 553.75 553.75 SAN-J-229-MB 301-R0
4 MB-302 1 689.14 689.14 SAN-J-229-MB 302-R0
Item Code
PEB Structural Members Erection
800012
TOTAL
SR NO DESCRIPTION NO QUANTITY (kg) REMARK
WEIGHT (Kg)
5 MB-303 2 607.96 1215.92 SAN-J-229-MB 303-R0
6 MB-304 1 679.50 679.5 SAN-J-229-MB 304-R0
7 MB-305 1 409.99 409.99 SAN-J-229-MB 305-R0
8 MB-306 1 671.86 671.86 SAN-J-229-MB 306-R0
9 MB-307 1 417.62 417.62 SAN-J-229-MB 307-R0
10 MB-308 2 613.61 1227.22 SAN-J-229-MB 308-R0
3 Joist Refer PEB Drawing Number
11 MJ-501 10 239.78 2397.8 SAN-J-229-MJ 501-R0
12 MJ-502 10 226.16 2261.6 SAN-J-229-MJ 502-R0
13 MJ-503 5 224.07 1120.35 SAN-J-229-MJ 503-R0
14 MJ-504 11 351.55 3867.05 SAN-J-229-MJ 504-R0
15 MJ-504A 1 348.75 348.75 SAN-J-229-MJ 504A-R0
16 MJ-505 6 187.68 1126.08 SAN-J-229-MJ 505-R0
17 MJ-505A 1 190.45 190.45 SAN-J-229-MJ 505A-R0
18 MJ-505B 1 190.45 190.45 SAN-J-229-MJ 505B-R0
19 MJ-506 4 183.04 732.16 SAN-J-229-MJ 506-R0
20 MJ-507 1 175.29 175.29 SAN-J-229-MJ 507-R0
21 MJ-508 1 139.5 139.5 SAN-J-229-MJ 508-R0
22 MJ-509 5 165.91 829.55 SAN-J-229-MJ 509-R0
23 MJ-511 1 161.29 161.29 SAN-J-229-MJ 511-R0
24 MJ-512 1 66.81 66.81 SAN-J-229-MJ 512-R0
25 MJ-513 1 83.89 83.89 SAN-J-229-MJ 513-R0
26 MJ-514 1 70.49 70.49 SAN-J-229-MJ 514-R0
27 MJ-515 1 70.55 70.55 SAN-J-229-MJ 515-R0
28 MJ-516 7 158.73 1111.11 SAN-J-229-MJ 516-R0
29 MJ-517 2 154.22 308.44 SAN-J-229-MJ 517-R0
30 MJ-518 1 139.66 139.66 SAN-J-229-MJ 518-R0
31 MJ-519 2 161.49 322.98 SAN-J-229-MJ 519-R0
32 MJ-520 1 76.8 76.8 SAN-J-229-MJ 520-R0
33 MJ-521 1 69.53 69.53 SAN-J-229-MJ 521-R0
34 MJ-522 1 71.58 71.58 SAN-J-229-MJ 522-R0
35 MJ-523 1 73.7 73.7 SAN-J-229-MJ 523-R0
36 MJ-524 1 62.27 62.27 SAN-J-229-MJ 524-R0

Level 20.95 M
3 Structural bolt
BO:04 (M20MM Ø X 75MM + NUT+
530 0.38 201.4
21 WASHERS)
BO:07 (M24MM Ø X 100MM +
35 0.68 23.8
22 NUT+ WASHERS)
BO:08 (M30MM Ø X 120MM +
200 1.74 348
23 NUT+ WASHERS)

RA02 (PO2021)

DEDUCTION IN RA04

1 COLUMN C7 (Grid no:- C-5) -1 18.2 -18.2 BKT:03


2 COLUMN C7 (Grid no:- C-7) -1 18.2 -18.2 BKT:03

Level 25.15 M
2 Bracket no-1 Refer PEB Drawing Number
1 AT Column C7 (Grid no:- F-2) 1 91.09 91.09 BKT:01
2 AT Column C4 (Grid no:- F-3) 1 91.09 91.09 BKT:01
Item Code
PEB Structural Members Erection
800012
TOTAL
SR NO DESCRIPTION NO QUANTITY (kg) REMARK
WEIGHT (Kg)
3 AT Column C2 (Grid no:- F-4) 1 91.09 91.09 BKT:01
6 AT Column C7 (Grid no:- A-4) 1 91.09 91.09 BKT:01
7 AT Column C8 (Grid no:- A-3) 1 91.09 91.09 BKT:01
8 AT Column C7 (Grid no:- C-7) 1 91.09 91.09 BKT:01
9 AT Column C7 (Grid no:- C-5) 1 91.09 91.09 BKT:01
10 AT Column C6 (Grid no:- D-7) 1 91.09 91.09 BKT:01
11 AT Column C7 (Grid no:- D-5) 1 91.09 91.09 BKT:01

Level 25.15 M
3 Bracket no-2 Refer PEB Drawing Number
1 AT Column C7 (Grid no:- C-2) 1 99.27 99.27 BKT:02

Level 25.15 M
4 Bracket no-3 Refer PEB Drawing Number
1 BEAM B7 A/2 TO C/2 5 18.2 91 BKT:03
2 BEAM B6 C/1 TO D/1 5 18.2 91 BKT:03
3 BEAM B5 D/1 TO F/1 5 18.2 91 BKT:03
4 COLUMN C7 (Grid no:- C-5) 1 18.2 18.2 BKT:03
5 BEAM B8 D/5 TO F/5 5 18.2 91 BKT:03
6 COLUMN C1 (Grid no:- B-6) 3 18.2 54.6 BKT:03
7 BEAM B2 A/5 TO A/7 1 18.2 18.2 BKT:03
8 COLUMN C7 (Grid no:- C-7) 3 18.2 54.6 BKT:03
9 COLUMN C5 (Grid no:- D-7) 1 18.2 18.2 BKT:03
10 BEAM B8 D/7 TO F/7 4 18.2 72.8 BKT:03
11 COLUMN C1 (Grid no:- E-8) 3 18.2 54.6 BKT:03
12 BEAM B1 F/7 TO F/9 1 18.2 18.2 BKT:03
13 BEAM B5 D/9 TO F/9 3 18.2 54.6 BKT:03
14 BEAM B6 C/9 TO D/9 5 18.2 91 BKT:03
15 BEAM B5 A/9 TO C/9 5 18.2 91 BKT:03
16 BEAM B5 A/5 TO C/5 8 18.2 145.6 BKT:03
17 BEAM B5 A/7 TO C/7 5 18.2 91 BKT:03

Level 25.15 M
1 Portal Column Refer PEB Drawing Number
2 Portal Beam Refer PEB Drawing Number
2 PB-401 2 666.47 1332.94 SAN-J-229-PB 401-R0
2 Beam Refer PEB Drawing Number
3 MB-301 1 553.75 553.75 SAN-J-229-MB 301-R0
4 MB-302 1 689.14 689.14 SAN-J-229-MB 302-R0
5 MB-303 2 607.96 1215.92 SAN-J-229-MB 303-R0
6 MB-304 1 679.50 679.5 SAN-J-229-MB 304-R0
7 MB-305 1 409.99 409.99 SAN-J-229-MB 305-R0
8 MB-306 1 671.86 671.86 SAN-J-229-MB 306-R0
9 MB-307 1 417.62 417.62 SAN-J-229-MB 307-R0
10 MB-308 2 613.61 1227.22 SAN-J-229-MB 308-R0
3 Joist Refer PEB Drawing Number
11 MJ-501 10 239.78 2397.8 SAN-J-229-MJ 501-R0
12 MJ-502 10 226.16 2261.6 SAN-J-229-MJ 502-R0
13 MJ-503 5 224.07 1120.35 SAN-J-229-MJ 503-R0
14 MJ-504 11 351.55 3867.05 SAN-J-229-MJ 504-R0
15 MJ-504A 1 348.75 348.75 SAN-J-229-MJ 504A-R0
16 MJ-505 6 187.68 1126.08 SAN-J-229-MJ 505-R0
17 MJ-505A 1 190.45 190.45 SAN-J-229-MJ 505A-R0
18 MJ-505B 1 190.45 190.45 SAN-J-229-MJ 505B-R0
Item Code
PEB Structural Members Erection
800012
TOTAL
SR NO DESCRIPTION NO QUANTITY (kg) REMARK
WEIGHT (Kg)
19 MJ-506 4 183.04 732.16 SAN-J-229-MJ 506-R0
20 MJ-507 1 175.29 175.29 SAN-J-229-MJ 507-R0
21 MJ-508 1 139.5 139.5 SAN-J-229-MJ 508-R0
22 MJ-509 5 165.91 829.55 SAN-J-229-MJ 509-R0
23 MJ-511 1 161.29 161.29 SAN-J-229-MJ 511-R0
24 MJ-512 1 66.81 66.81 SAN-J-229-MJ 512-R0
25 MJ-513 1 83.89 83.89 SAN-J-229-MJ 513-R0
26 MJ-514 1 70.49 70.49 SAN-J-229-MJ 514-R0
27 MJ-515 1 70.55 70.55 SAN-J-229-MJ 515-R0
28 MJ-516 7 158.73 1111.11 SAN-J-229-MJ 516-R0
29 MJ-517 2 154.22 308.44 SAN-J-229-MJ 517-R0
30 MJ-518 1 139.66 139.66 SAN-J-229-MJ 518-R0
31 MJ-519 2 161.49 322.98 SAN-J-229-MJ 519-R0
32 MJ-520 1 76.8 76.8 SAN-J-229-MJ 520-R0
33 MJ-521 1 69.53 69.53 SAN-J-229-MJ 521-R0
34 MJ-522 1 71.58 71.58 SAN-J-229-MJ 522-R0
35 MJ-523 1 73.7 73.7 SAN-J-229-MJ 523-R0
36 MJ-524 1 62.27 62.27 SAN-J-229-MJ 524-R0

Level 25.15 M
3 Structural bolt
BO:04 (M20MM Ø X 75MM + NUT+
530 0.38 201.4
21 WASHERS)
BO:07 (M24MM Ø X 100MM +
35 0.68 23.8
22 NUT+ WASHERS)
BO:08 (M30MM Ø X 120MM +
200 1.74 348
23 NUT+ WASHERS)

EXTRA JOIST
LEVEL-6 ( MJ:513 ) (LIFT-2) 1 83.89 83.89 SAN-J-229-MJ 513-R0
LEVEL-6 ( MJ:520 ) (LIFT-1) 1 76.8 76.8 SAN-J-229-MJ 520-R0

SPLICE PLATE
LEVEL-5
MJ:514 ( 350MM WEB )
WEB 2 3.5325 7.065 SPLICE PLATE DETAIL
FLANGE 4 12.0576 48.2304 SPLICE PLATE DETAIL

PB:401 JOIN MC-202 TO MC204


( 400 MM WEB )
WEB 2 6.28 12.56 SPLICE PLATE DETAIL
FLANGE 4 14.0672 56.2688 SPLICE PLATE DETAIL

THIS BILL QUATITY 59.54


PREVIOUS CLAIM 33.39 MT -RA BILL NO -04
PREVIOUS CLAIM 26.15 RA BILL NO-02 (PO2021)
Item Code
DECKSHEET
800012
LENGTH BREADTH DEPTH QUANTITY
SR NO DESCRIPTION NO REMARK
(M) (M) (M) (Sqm)

RA04

1 LEVEL 20.95M -
-
Level 20.95M 1 34.630 15.63 541.27
deduction -
Staircase -1 -1 5.750 4.90 (28.18)
Staircase -2 -1 6.545 4.18 (27.36)
Lift-1 -1 2.325 2.30 (5.35)
Lift-2 -1 2.383 2.20 (5.24)

-
1 LEVEL 25.15 M -
-
Level 25.15M 1 34.630 15.63 541.27
deduction -
Staircase -1 -1 5.750 4.90 (28.18)
Staircase -2 -1 6.545 4.18 (27.36)
Lift-1 1 2.325 2.30 5.35
Lift-2 1 2.383 2.20 5.24

TOTAL QTY 971.47


PREVIOUS CLAIM 475.14 RA04
PREVIOUS CLAIM 496.32 RA02 (PO2021)
Johnson And Johnson ( Labours Weekly Medical Examination, MANAV CLINIC )
PERSO
Sr. No Date Paid Date Status Details NS Amount
1 15-Sep-20 16-Sep-20 Paid From 14/9/20 To 20/9/20 16 3200
2 22-Sep-20 23-Sep-20 Paid From 21/9/20 To 26/9/20 15 3000
3 29-Sep-20 30-Sep-20 Paid From 28/9/20 To 3/10/20 16 3000
4 6-Oct-20 7-Oct-20 Paid From 5/10/20 To 10/10/20 13 3000
5 13-Oct-20 14-Oct-20 Paid From 12/10/20 To 17/10/20 16 2500
6 20-Oct-20 21-Oct-20 Paid From 19/10/20 To 24/10/20 32 4000
7 27-Oct-20 28-Oct-20 Paid From 26/10/20 To 31/10/20 24 3000
8 3-Nov-20 4-Nov-20 Paid From 2/11/20 To 7/11/20 27 3000
9 10-Nov-20 11-Nov-20 Paid From 9/11/20 To 14/11/20 8 1600
10 18-Nov-20 19-Nov-20 Paid From 17/11/20 To 21/11/20 23 3000
11 25-Nov-20 26-Nov-20 Paid From23/11/20 To 28/11/20 23 3000
12 1-Dec-20 2-Dec-20 Paid From 30/11/20 To 5/12/20 25 3000
13 9-Dec-20 10-Dec-20 Paid From 7/12/20 To 12/12/20 20 3000
14 16-Dec-20 17-Dec-20 Paid From 14/12/20 To 19/12/20 23 3000
15 23-Dec-20 24-Dec-20 Paid From 21/12/20 to 26/12/20 30 3000
16 7-Jan-21 10-Jan-21 Paid From 28/12/20 to 2/1/21 32 3000
17 7-Jan-21 10-Jan-21 Paid From 4/1/21 to 9/1/21 12 1500
18 12-Jan-21 14-Jan-21 Paid From 11/1/21 to 16/1/21 24 3000
19 20-Jan-21 21-Jan-21 Paid From 18/1/21 to 23/1/21 14 1500
20 1-Feb-21 2-Feb-21 Paid From 25/01/21 to 30/01/21 22 2500
21 2-Feb-21 8-Feb-21 Paid From 01/02/21 to 06/02/21 19 2500
22 11-Feb-21 15-Feb-21 Paid From 8/2/21 to 13/2/21 35 3500
23 16-Feb-21 23-Feb-21 Paid From 15/2/21 to 20/2/21 38 4500
24 25-Feb-21 2-Mar-21 Paid From 22/2/21 to 27/2/21 37 4000
25 3-Mar-21 5-Mar-21 Paid From 1/3/21 to 6/3/21 28 3000
26 10-Mar-21 13-Mar-21 Paid From 8/3/21 to 13/3/21 38 4000
27 22-Mar-21 23-Mar-21 Paid From 15/3/21 to 20/3/21 38 4000
28 23-Mar-21 24-Mar-21 Paid From 22/3/21 to 27/3/21 32 3500
29 30-Mar-21 31-Mar-21 Paid From 29/3/21 to 3/3/21 22 2500
30 6-Apr-21 7-April-21 Paid From 5/4/21 to 10/4/21 25 3000
31 3-May-21 14-May-21 Paid From 26/4/21 To 1/5/21 15 2250
32 3-May-21 14-May-21 Paid From 3/5/21 To 8/5/21 13 1950
33 13-May-21 14-May-21 Paid From 10/5/21 To 15/5/21 20 2600
34 20-May-21 21-May-21 Paid From 17/5/21 To 22/5/21 13 1950
35 31-May-21 1-June-21 Paid From 23/5/21 to 31/5/21 18 2340
36 10-June-21 11-June-21 Paid From 31/5/21 To 10/6/21 15 2250
37 27-June-21 28-June-21 Paid From 10/6/21 To 18/6/21 12 2100
38 29-June-21 30-June-21 Paid From 18/6/21 To 27/6/21 14 1800
39 7-July-21 8-July-21 Paid From 27/6/21 To 07/7/21 9 1350
40 16-July-21 17-July-21 Paid From 07/7/21 To 14/7/21 5 750
41 18-July-21 19-July-21 Paid From 14/7/21 To 18/7/21 6 1350
42 19-July-21 20-July-21 Paid From 18/7/21 To 20/5/21 7 900

Total 874 111890


For Manav Clinic; Receipt

Received the aforesaid ammount of Rs 1,11,890 vide respective


RTGS, as professional fees, towards the visit & covid symptoms
examination of various employees of M/s Gubbi Civil engineers for
the period of 16/09/2020 to 20/07/2021, for Johnson & Johnson;
Mulund.
Received the aforesaid ammount of Rs 1,11,890 vide respective
RTGS, as professional fees, towards the visit & covid symptoms
examination of various employees of M/s Gubbi Civil engineers for
DR. G. D. Maheshwari the period of 16/09/2020 to 20/07/2021, for Johnson & Johnson;
Mulund.

You might also like