Executive Summary - Pkg-1 23.02
Executive Summary - Pkg-1 23.02
090 (design
chainage km 6.945) to Km 53.585 (design chainage Km 54.990) on Hybrid
(Annuity) mode in the State of Gujarat
STUP Consultants P. Ltd.
EXECUTIVE SUMMARY
1.0 BACKGROUND
As a consequence of liberalization and rapid socio-economic development in India,
opening of various central/state undertakings and bank offices, there has been tremendous
growth of economic activities in the urban centers. This has resulted in a spurt of freight
and passenger transport activities. National Highway Authority of India (NHAI) has
decided to take up the development of various National Highways.
National Highways Authority of India (NHAI) has taken up the up-gradation of existing 2-
lane road to 4 lane with paved shoulder configuration of Bhavnagar – Talaja section of
NH-8E from Km 7.090 (design chainage km 6.945) to Km 53.585 (design chainage Km
54.990) in the State of Gujarat. This project stretch length is 48.045 Km.
The entire project road in its present condition is a two lane road. The layout plan
indicating the project road is presented in Figure – 1.1.
Four laning of Bhavnagar – Talaja section of NH-8E from Km 7.090 (design
chainage km 6.945) to Km 53.585 (design chainage Km 54.990) on Hybrid
(Annuity) mode in the State of Gujarat
STUP Consultants P. Ltd.
2
Four laning of Bhavnagar – Talaja section of NH-8E from Km 7.090 (design
chainage km 6.945) to Km 53.585 (design chainage Km 54.990) on Hybrid
(Annuity) mode in the State of Gujarat
STUP Consultants P. Ltd.
All these districts contribute traffic to the project road section in varied proportion. These
districts thus form an immediate influence area of the Project Road. This influence area is
termed as Project influence Area (PIA). This chapter deals with Socio – economic profile
of the immediate PIA. Gross domestic product (GDP) at factor cost at constant (2004-05)
prices in 2009-10 is estimated at Rs. 44, 93,743 crore as against Rs. 41, 62,509 crore in
2008-09 registering a growth of 8.0 per cent during the year as against the growth rate of
6.8 per cent during the previous year. At current prices, GDP in 2009-10 is estimated at
Rs. 61, 33,230 crore as against Rs. 52, 82,086 crore in 2008-09, showing an increase of
16.1 per cent during the year. At constant (2004-05) prices the gross national income at
factor cost in 2009-10 is estimated at Rs 44, 64,854 crore as against Rs. 41, 37,125 crore
in 2008-09 showing a rise of 7.9 per cent during the year. At current prices, the gross
national income in 2009-10 is estimated at Rs. 60,95,230 crore as compared to Rs
52,49,163 crore in 2008-09, showing a rise of 16.1 per cent during the year. The growth
rate of 8.0 per cent in the GDP during 2009-10 has been achieved due to high growth in
transport, storage and communication (15.0%), community, social and personal services
(11.8%), financing, insurance, real estate & business services (9.2%), and manufacturing
(8.8%).
The per capita income (per capita net national income at factor cost) in real terms, i.e. at
2004-05 prices, is estimated at Rs. 33,731 for 2009-10 as against Rs. 31,801 in 2008-09,
registering an increase of 6.1 per cent during the year. The per capita income at current
prices is estimated at Rs. 46,492 in 2009-10 as against Rs. 40,605 for the previous year
depicting a growth of 14.5 per cent.
3
Four laning of Bhavnagar – Talaja section of NH-8E from Km 7.090 (design
chainage km 6.945) to Km 53.585 (design chainage Km 54.990) on Hybrid
(Annuity) mode in the State of Gujarat
STUP Consultants P. Ltd.
4
Four laning of Bhavnagar – Talaja section of NH-8E from Km 7.090 (design
chainage km 6.945) to Km 53.585 (design chainage Km 54.990) on Hybrid
(Annuity) mode in the State of Gujarat
STUP Consultants P. Ltd.
New Alignment –
1 8.587 11.047 2.46 8.442 11.116 2.674 TCS- 3
Proposed Bypass for Budhel
Based on condition and widening requirement of the project road, different types of cross
sections have been proposed.
5
Four laning of Bhavnagar – Talaja section of NH-8E from Km 7.090 (design
chainage km 6.945) to Km 53.585 (design chainage Km 54.990) on Hybrid
(Annuity) mode in the State of Gujarat
STUP Consultants P. Ltd.
Traffic studies at Mid-Blocks are conducted at different locations in the Year 2016 for
classified traffic volume count after a detailed site investigation.
The Mid-Block locations for Bhavnagar – Talaja Section are listed below:
6
Four laning of Bhavnagar – Talaja section of NH-8E from Km 7.090 (design
chainage km 6.945) to Km 53.585 (design chainage Km 54.990) on Hybrid
(Annuity) mode in the State of Gujarat
STUP Consultants P. Ltd.
3 Axle Commercial
Vehicle 321 369 690
MAV/ HCM/ EME (4 to 6
Axle) 649 643 1292
Oversized Vehicle (7 or
more axle) 2 2 4
Two Wheeler 2169 2029 4198
Auto Rickshaw/ 6 Seater 389 374 763
Tractor 7 6 13
Tractor + Trailer 98 97 195
Slow Moving
Bicycle 8 7 15
Vehicles
Cycle Rickshaw 0 0 0
Hand Driven Vehicle/
Bullock Carts/ Horse
Carts 0 1 1
PCU's Vehicles
7
Four laning of Bhavnagar – Talaja section of NH-8E from Km 7.090 (design
chainage km 6.945) to Km 53.585 (design chainage Km 54.990) on Hybrid
(Annuity) mode in the State of Gujarat
STUP Consultants P. Ltd.
The axle load survey data have been analyzed to arrive at the VDF values for each
category of vehicles. The following VDF values have been arrived for various categories
of vehicles.
Table – 1.6: Vehicle Damage Factor
3 TCS – 3 Typical cross section of 4-lane without service road (New Construction)
4 TCS – 4 Typical cross section of 4-lane without service road (Eccentric widening)
5 TCS-5 Typical cross section of 4-lane without service road (New Construction)
6 TCS – 6 Typical cross section of 4-lane without service road (New Construction)
7 TCS – 7 Typical cross section of 4-lane Flyover/Underpass with slip road
8 TCS – 8 Typical cross section of 4-lane Flyover/Underpass with slip road
9 TCS – 9 Typical cross section of 6-Lane Flyover / Underpass with Slip Road
10 TCS – 10 Typical cross section of 6-Lane Flyover / Underpass with Slip Road
4.2.2 Pavement
This section provides pavement structure proposed for the improvement of the project
road. The entire stretch of project highway has rigid pavement.
Pavement Structure for New Construction
8
Four laning of Bhavnagar – Talaja section of NH-8E from Km 7.090 (design
chainage km 6.945) to Km 53.585 (design chainage Km 54.990) on Hybrid
(Annuity) mode in the State of Gujarat
STUP Consultants P. Ltd.
The pavement compositions proposed for new construction of rigid pavement for
widening it to 4 lanes are indicated in Table 1.8.
Table 1.8: Pavement Composition for New Construction
9
Four laning of Bhavnagar – Talaja section of NH-8E from Km 7.090 (design
chainage km 6.945) to Km 53.585 (design chainage Km 54.990) on Hybrid
(Annuity) mode in the State of Gujarat
STUP Consultants P. Ltd .
Existing Design Bridge / Proposed Proposed Span Total Length Total width Remarks
Chainage Chainage structure Structure arrangement (c/c of bridge of structure
Sl. No
Location Location No. configuration of bridge)
(Km) (Km) (m) (m) (m)
Existing Design Bridge / Proposed Proposed Span Total Length Total width Remarks
Chainage Chainage structure Structure arrangement (c/c of bridge of structure
Sl. No
Location Location No. configuration of bridge)
(Km) (Km) (m) (m) (m)
NIL
Sl. No
Existing Design Bridge / Proposed Total Length Total width Remarks
Chainage Chainage structure Structure Proposed Span of bridge of structure
arrangement
Location Location No. configuration (c/c of bridge)
(Km) (Km) (m) (m) (m)
Four laning of Bhavnagar – Talaja section of NH-8E from Km 7.090 (design
chainage km 6.945) to Km 53.585 (design chainage Km 54.990) on Hybrid
(Annuity) mode in the State of Gujarat
STUP Consultants P. Ltd .
NIL
11
Four laning of Bhavnagar – Talaja section of NH-8E from Km 7.090 (design
chainage km 6.945) to Km 53.585 (design chainage Km 54.990) on Hybrid
(Annuity) mode in the State of Gujarat
STUP Consultants P. Ltd .
New 6 Lane
3. - 11.268 -
bridge
1 x 10.4 10.4 2x16.0 New 6 Lane bridge proposed
for main carriageway
Sl. No
Existing Design Bridge / Proposed Total Length Total width Remarks
Chainage Chainage structure Structure Proposed Span of bridge of structure
arrangement
Location Location No. configuration (c/c of bridge)
(Km) (Km) (m) (m) (m)
New 6 Lane bridge proposed
for main carriageway on
11. - 30.126 -
New 6 Lane 10 x 6.0 Tansa bypass
bridge 60 2x16.0
New 6 Lane bridge proposed
12. - 30.330 - New 6 Lane for Main carriageway on
bridge 5 x 7.6 38 2x16.0 Tansa bypass
New New 6 Lane bridge proposed
13. 31.966 33.224 32/2
6 Lane bridge 1x7.8 7.8 2x16.0 for main carriageway
New
14. 32.674 33.938 33/2 6 Lane bridge New 6 Lane bridge proposed
1x6 6 2x16.0 for main carriageway
New New 6 Lane bridge proposed
15. - 34.126 - 6 Lane bridge for main carriageway on
1x6 6 2x16.0 Rajpara realignment
New 6 Lane bridge proposed
for Main carriageway on
New Rajpara realignment
16. - 34.938 -
6 Lane bridge
3 x 6.0 18 2x16.0
Sl. No
Existing Design Bridge / Proposed Total Length Total width Remarks
Chainage Chainage structure Structure Proposed Span of bridge of structure
arrangement
Location Location No. configuration (c/c of bridge)
(Km) (Km) (m) (m) (m)
New New 6 Lane bridge proposed
6 Lane bridge for Main carriageway on
5 x 5.8 29 2x16.0 Trapaj bypass
21. - 41.138 -
New New 4 Lane bridge proposed
4 Lane bridge for Main carriageway on
5 x 5.8 29 2x10.8 Trapaj bypass
New 6 Lane bridge proposed
New
22. - 41.346 -
6 Lane bridge
for Main carriageway on
2 x 5.6 11.2 2x16.0 Trapaj bypass
New
23. 41.383 42.494 42/1 6 Lane bridge New 4 Lane bridge proposed
1x10.2 10.2 2x12.5 for main carriageway
14
Four laning of Bhavnagar – Talaja section of NH-8E from Km 7.090 (design
chainage km 6.945) to Km 53.585 (design chainage Km 54.990) on Hybrid
(Annuity) mode in the State of Gujarat
STUP Consultants P. Ltd.
Entry / exit ramps and Overpasses for the entering into or exiting from the project highway at Start and End point of
proposed bypasses have been proposed at the following locations as mention in Table 2.7.;
Table 2.7: Proposed Ramps and Overpasses
Avg. Skew Angle
Proposed Total width Gradient (Degree)
Sr. Design Proposed (%)
Bypass Span of
No. Chainage Structure
Location arrangement proposed
Location configuration
(c/c of bridge) structure
(Km)
(m) (m)
15
Four laning of Bhavnagar – Talaja section of NH-8E from Km 7.090 (design
chainage km 6.945) to Km 53.585 (design chainage Km 54.990) on Hybrid
(Annuity) mode in the State of Gujarat
STUP Consultants P. Ltd.
16
Four laning of Bhavnagar – Talaja section of NH-8E from Km 7.090 (design
chainage km 6.945) to Km 53.585 (design chainage Km 54.990) on Hybrid
(Annuity) mode in the State of Gujarat
STUP Consultants P. Ltd.
Existing Proposed
SI. Design Chainage Proposed
Chainage Size (LXH) Total Width of Structure (m)
No (Km) Structure
(Km) (m)
Budhel
1 9.583 6 lane 12 X 5.5 2 X 14.5 + 3.5
Bypass
Talaja
2 52.750 4 lane 12 X 5.5 2 X 12.5 + 3.5
Bypass
17
Four laning of Bhavnagar – Talaja section of NH-8E from Km 7.090 (design
chainage km 6.945) to Km 53.585 (design chainage Km 54.990) on Hybrid
(Annuity) mode in the State of Gujarat
STUP Consultants P. Ltd.
Proposed
Existing Design Chainage Proposed
SI. No Size (LXH) Total Width of Structure (m)
Chainage (Km) (Km) Structure
(m)
9.0 ROB
NIL
18