Floor Works: Objective of The Project
Floor Works: Objective of The Project
Floor works
clean swimming pool floor and remove spoiled individual mosaic tiles for
latter recycle and use
removed mosaic tiles must be washed and cleaned and store in safe store
until recycle use again
Site work
to prevent unauthorized persons students and keeps entering swimming pool and to
avoid accidents fence and gait should be constructed
unleveled terrazzo tails should be removed and placed correctly again
visitations herbs over the terrazzo working area should be completely removed
old paints /deteriorated surfaces should be painted again
for warning purpose the depth information should be written where there is change
in depth
Sanitary work
Additional inlet connected from underground water supply installed to the
swimming pool with in a short period of time
The water in pumping house should be removed completely for operational and
maintenance purpose
Existing booster pumps should be taste if they are functional or not
If the pumps are not functional should be maintain
Since there are no shower trace in the site
There for New trace should be fixed
Remove old shower out let and replace with new one
Repaint shower stand pipes
Electrical work
Check all the installations and availability of power to pole lights and booster
pumps
Check pole lights and removed and replaced defected bulb