HWA LUN SAFETY DAILY ACTIVITY MONITORING AND MANPOWER HEADCOUNT

CORPORA TION 安全日常活动监控 和人力资源


2705 Bandong Tower, 366 Barraca San Nicolas Manila - Tel No.: 83612710

DATE :Augus 05, 2021 INCHARGE : gubing


DURATION : 7am to 5pm TOTAL MANPOWER : Filipino workers 27 / Chinese 3 / staff 3

ACTIVITY LOCATION MANPOWER REMARKS POSITION HEADCOUNT


Installation of curtain wall glass Right elevation & Front 13 PROJECT MANAGER x
幕墙玻璃的安装 Elevation
Sealant application Front elevation 8 PROJECT IN CHARGE 1
密封胶应用
Vip room installation Roofdeck 6 SITE ENGINEER / QA QC 1
贵宾室安装
Chinese monitoring 家政 3 SAFETY & HEALTH OFFICER 1
中文监控
Housekeeping X X FOREMAN 1
家政
SUPERVISOR 1

TRANSLATOR 13

SITE SECRETARY x

WELDER x

INSTALLER / HELPER 27

TOTAL 33

NOTE :

THIS ACTIVITY IS VALID ONLY ON THE DATE & TIME IT WAS APPROVED. ANY EXTENSION SHOULD BE COORDINATED WITH THE MANAGEMENT. WORK
LOCATION SPECIFIED ON THIS DOCUMENT IS SAFE TO PROCEED. ALL NECESSARY SAFETY PRECAUTIONED WAS INITIATED.

PREPARED BY : APPROVED BY :