TESTS ON THE FIRST 500kV COMPACT

TRANSMISSION LINE IN CHINA


Xuehai Gong Huiren Wang Zhangkui Zhang
Jinping Wang Jian Wang Yichao Yuan
North China Electric Power Research Institute
Beijing 100045, P.R.CHINA

ABSTRACT of 83 km. It was put into operation after the


commissioning on 18 Nov. 1999. The
The paper deals with the tests on the first construction of this 500kV compact line is
500kV compact transmission line in China. based on the experience of first 220 kV
The transmission line is located in north China compact transmission line which was put into
power network. It is from Fangshan substation operation in Sept.1994 and four years research
to Changping substation nearby Beijing . The work.
transmission distance of the line is 83 km.In
order to investigate the characteristics of the As compared with the conventional 500kV
transmission line, many tests were performed transmission line in north China power grid,
on the line before and after its operation. The its advantage is:
electrical parameters including the positive 0 The natural transmission power is
sequence and zero sequence impedance were increased by 34% attaining 1340MW
measured before operation. The results are the without the increase of total conductor
same as the designed ones. The electrical field size, which is beneficial for long distance
nearby the transmission line when it is power transmission.
energized is not higher than the conventional 0 The right of way (ROW) is restricted to
transmission line. As compared with the 17.9m and the cost per unit natural
conventional transmission line, the insulation transmission power is reduced by 22%.
distance of the compact transmission line is
considerably short; the switching surges of The main characteristics of this compact line
phase to earth and phase to phase were are as follows:
investigated carefully during switching The conductors of 3 phases are in the
operation. Different operation modes of the same window of the tower without cross
breaker are considered. The phase to earth arms (see fig.l).
overvoltage is less than 1.79p.u. The phase The clearance of phase to phase is greatly
to phase overvoltage is not greater than 3.45 reduced from 12.3m of conventional line
p.u. to 6.7m of compact line.
The number of ACSR sub-conductors per
The voltage and current unbalance between phase is increased from four LGJ-400/35
the phases of the transmission line is very (aluminum areaheel area in mm2) to six
small when it is energized. The audible noise LG 5-240130.
and radio interference is not higher than The number of sub-conductors is 6 and
designed one. The transmission line was put the bundle diameter is 750".
into operation in the end of last year. The insulator along the whole line is
composite insulator.
KEY WORDS When the span exceeds 800m, an
insulated interphase spacer is installed at
Compact Transmission Line, Overvoltage, the mid-point of the span to prevent the
Switching Surge, Parameters flashover due to non-synchronous swing.

1. INTRODUCTION order to demonstrate the electric


characteristic of the line, a test line with the
The first 500kV compact transmission line in length of 1 km was constructed before the
China is nearby Beijing from Changping construction of the line. A lot of tests were
substation to Fangshan substation with length conducted on the test line including switching

0-7803-6338-8/00/$10.00(~)2000IEEE 173
surge flashover of phase to earth and phase to line is different from conventional line. The
phase. The test results show many specific calculation of relay protection set value must
characteristics, which are different from the be based on the measurement of power
conventional line due to the decrease of frequency parameter. The measurement was
clearance of phase to phase. For example, performed in 7 Nov. 1999. Table 1 is the
switching surge flashover voltage to earth is measured results.
much influenced by the voltage and polarity of
the other phases. As compared with
conventional line, under the same clearance to
earth, the switching surge flashover voltage is
reduced 10%. Type of line Compact line Conventional
line
Positive sequence inductance 0 664 090
(m") L,
Zero sequence inductance 3 33 24
(m") Lo
Positive sequence 0 0207 0 032
capacitance (yF/km) C,
Zero sequence 0 00798 0 00892
capacitance(pFlkm) CO
Positive sequence resistance 0 0207 0 032
(Qkm)R,
Zero sequence resistance 0 143 03
(Qkm)%

In table 1 , the measured result of a


conventional line, which is from Sha Lingzi to
Changping, is also illustrated. The difference
is obvious.

The surge impedance is as follows:

----(F1)
C is the capacitance per unit length
From table 1 , the surge impedance can be
calculated (see table 2).

Fig. 1 The configuration of the tower


Type of line
The lightning surge test is also conducted on
the model tower of compact line. The Compact line 191.5
withstand level of lightning surge due to the 518.7
lightning flashover overvoltage is about
170kA, which is the same as conventional From surge impedance, the natural
line. transmission power can be estimated.

During the commissioning, the power


frequency parameters, the switching surge
overvoltage, the electric field nearby ------(F2)
transmission line, and the radio interference Where, PNis natural transmission power of the
and audible noise are measured. line
U is nominal voltage
2. THE MEASUREMENT OF POWER z is surge impedance
FREQUENCY PARAMETERS From table 2, the positive sequence surge
impedance of compact line is 27% less than
The power frequency parameter of compact

174
conventional line. Hence, the natural cycle by 5 times, single phase opening-
transmission power will be increased more closing-opening cycle 3 times.
than 30% by F2. Fangshan substation as power source,
switching no-load transmission line with
3. SWITCHING OPERATION TEST ON breaker 5041. The reactor is out of
COMPACT LINE operation. The switching operation is
closing, opening and closing-opening
From table 1, the positive sequence cycle 5 times separately, single phase
capacitance of compact line is larger than opening-closing-opening cycle 3 times.
conventional line, so Ferrite effect of compact Fangshan substation as power source,
line should be more serious than conventional switching no-load transmission line, the
line. In order to reduce the power frequency reactor is out of operation.
overvoltage of the line, a reactor is installed in Fangshan substation as power source,
Changping substation. A MOA (metal oxide switching no-load transmission line with
arrester) is installed on both sides of the line. breaker 5041, the reactor is put into
The rated voltage of MOA is 444kV. The operation. The switching operation is
circuit breakers on both sides of the line are closing, opening and closing-opening 5
SF6 breakers without closing resistor. times separately, single phase opening-
closing-opening 3 times.
The switching test was performed in 15
Nov. 1999. Four different switching operation The test results according to operation modes
modes are considered. The one-line diagram mentioned above are shown in table 3 and
of transmission line and related equipment is table 4.
shown in fig.2. Table 3. Test result switching in Changping
3tion

Fig.2 One-line diagram of the operation mode

0 Changping substation as power source,


switching no-load transmission line with
breaker 5013, the reactor is out of
operation. The switching operation is
closing, opening and closing-opening (C-
O) cycle by 5 times, single phase
opening-closing-opening (0-CO) cycle 3

0
times.
Changping substation as power source,
switching no-load transmission line with
breaker 5013. The reactor is put into
operation. The switching operation is
U2
1.22
1.21

closing, opening and closing-opening

175
Table 4. Test results switching in Fangshan the line is energized
:ation
Phase to earth Phase to phase

8 3 I 1.39 I 1.19 I 1.31 12.25 I 1.82 12.40


4 1.27 1.08 1.47 2.00 1.98 1.96
I 5 I 1.33 I 1.35 I 1.23 I 1.98 1 1.82 I 2.03 Fig.4 Overvoltage waveform during CO
operation
2
1.74
I I 1.22 I 1.18 I 1.24 I 1.79 I 1.75 I 1.86
I2 1 1.08 1 1.18 I 1.21 I 1.82 I 1.78 I 1.84

2. IO

8 3 I 1.19 I 1.31 I 1.19 I 1.80 I 1.73 I 1.92 I . . .~ . . . .. . .

4 1.50 1.13 1.20 2.31 1.73 1.87


I 5 I 1.30 I 1.41 I 1.20 I 1.94 I 1.82 I 1.86

Fig.5 Overvoltage waveform during 0-C(


operation

The measured result of overvoltage is nearly


identical with the calculation result. The
overvoltage of phase to phase is a little bit
energized. Fig.4 shows the overvoltage during higher than calculation that is 3.3 p.u. The
closing-opening operation. Fig.5 shows the base value of calculation is 550 J 2/3
overvoltage during opening-closing-opening =449kV. The base value for measurement is
operation. the steady state value. There is a difference
between them. However, the substations on
both sides of the transmission line are load
substation, the operation voltage will not
exceed the maximum nominal voltage, so the
insulation coordination can meet the
requirement. The energized current of the line
is about 141.5A when the voltage is 518kV.
The unbalance between phase voltage is less
than 0.7% and the current unbalance is less
than 1%.

There is no conductor transposition along this


whole compact transmission line. The
unbalances of voltage and current indicate that
the symmetry of compact line is much better
Fig.3 Waveform of voltage and current when than conventional line. It is unnecessary to
transpose the line conductor even when the

176
length of compact line exceeds hundreds The measurement is performed on 22 Nov.
kilometers. This is also beneficial to the 1999. The measuring point is selected at a
calculation of relay protection. point that is 15m away from transmission line.
An important problem is the rush current The distribution of audible noise at different
when the transmission line is energized. 10 frequencies is shown in fig.7. The noise level
times of energized current with high frequency under the transmission line is about 39.6 dB
is recorded in the test. However, it is (A). The audible noise level meets the
attenuated quickly and lasts only 2 power requirement of design and some standard. The
frequency period (see fig.3). measurement of radio interference is due to
The capacitance of compact line higher than the regulations of CISPR. The distribution of
conventional line is the major reason for big radio interference is shown in table 5 .
rush current. If closing resistor of circuit
breaker on both sides of transmission line, the
rush current could be small due to the
damping of resistor. The influence of rush
current to relay protection sensitivity should
be considered when the length of compact line
is somewhat long.

4. MEASUREMENT OF ELECTRIC
FIELD
"
The electric field under transmission line is a
very important performance. The measuring
region is selected at the mid-point of a span. Fig.7 Audible noise distribution at
The measuring points are 1 m above the differentfrequencies
ground along the vertical direction of the line.
The measured electric field distribution is
shown in figure 6.

Interference level

The radio interference level is within the


requirement of design and some standard.
Fig.6 The distribution of electric field
6. CONCLUSIONS
The maximum field is under the transmission
line and the field is attenuated with the The tests on the first 500kV compact line
distance away from the line. The maximum verify the design and research work.
horizontal field is 0.794 kV/m, the maximum
vertical field is 4.36 kV/m. The region in The positive surge impedance of compact line
which the vertical field is more than 4 kV/m is is 27% lower than conventional line. The
6 m. It is much lower than conventional line natural transmission power is increased more
which is about 60m. This indicates that the
than 30%.
ROW of compact line is much narrower than
conventional line. The benefit of compact line The rush current of compact line is much
is obvious. higher than conventional line when it is
energized.
5. AUDIBLE NOISE AND RADIO
INTERFERENCE The overvoltage can meet the requirement of

177
operation. [2] Yafang Liu, etc., Study of 500kV compact
transmission technology (CIGRk, 1998
The ROW of compact line can be greatly session).
reduced due to the shrink of high field region. [3] Zhangkui Zhang, etc,. Commissioning
report of Changping-Fangshan 500kV
7.REFERENCES compact transmission line (2000-3).
[4] Yichao Yuan, etc., Report of 500kV
[l] R.H.Behucke etc., 500kV compact line compact test line (1 997-3).
designs for the greater Bangkok area
(CIGRk, 1998 session).

178