Toilet Block: Bihar Panchayat Strengthening Project

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

A B A B

3300 3300 250


1 1
P1 P1 S1 B2 S1 S1 S1
2413

2413
B5
B2 B2 1000 S1

2 S1 S1 2

300
P1 P1 S1 B2 S1 TIE BEAM
725 1075 1000 GL
B5
2413

2413
75mm THK.B.F.S
S1
B2 B2 150mm TKH.SAND FILLING

1190
B5 B5 250
B2
3 S1 S1 S1 S1 3
P1 P1

t5 .25L1 X W Y .25L1

t6 t7

t5 t5 X W Y
t5 t2 t4 t3 50mm Max 50mm Max
t1 2d S=d/2 Max 2d
t7 two legged t6 .25L1 .3L1 .3L2 .3L2
two legged
vertical stirrups .25L2 .25L2 .25L1 .25L1

130
250 vertical stirrups
at 2D s=d4 s=d4
at mid span t3 t2 max.for 2d max.for 2d
75

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


t4 #8 @200mmC/C 250 L2 L1
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

150
#6 @150mmC/C t1 t1
t1 Section at-X X Section at-Y Y typical reinforcement detail of grade beam
Typical Detailsof Cross - of PL,CL, & LL, Section at-W W Typical Details of Cross - Sec
.2L1 .25L1 .25L2 .25L2
Band at LL opening
L1 L2

Typical Reinforcement detail of slab


SECTION AT - ZZ
Lo-600 Lo-600

DETAILS OF STIFFNER & COLUMN


DETAILS OF ROOF SLAB
#8@90 SL Column Size of Main Ties Section of Shape of
SL SLAB THK OF N0. MKD Column Reinforcement Io (mm) SCR in Io hc - 2Io SPLICES Column Stirrup
REINFORCEMENT
N0. MKD SLAB
SHORTER SPAN LONGER SPAN 1. S1 250x250 6 # 12 600 #8 @ 150mm C/C #8 @ 150mm C/C #8 @ 150mm C/C
Beam rein.
as/detail 1. SB1 130mm #8 @ 100mm C/C #8 @ 150mm C/C
250
2. SB2 130mm #10 @ 150mm C/C #10 @ 150mm C/C
CROSS TIE 2. S2 300x450 8 # 12 600 #8 @ 75mm C/C #8 @ 150mm C/C #8 @ 100mm C/C
3. SB3 100mm #8 @ 100mm C/C #8 @ 100mm C/C
75mm THK.BAND #8@150 hc
HOOP
Ld+10db

#8@100
AS PER SITE

1. ALL DIMENSION ARE IN MM.


2. ALL CONCRETE MIX M20 UNLESS OTHERWISE SPECIFIED.
#8@150
3. # INDICATES " T.MT " STEEL BAR.
Lo-600

DETAILS OF BEAM
4. USE FE 415 AS PER IS:1786:2008.
SL BEAM REINFORCEMENT 2 LEG.VERTICAL STRUCTURE 5. ALL CONCRETE SHALL BE MACHINE MIXED AND MACHINE VIBRATED.
75mm THK.BAND 2nos single legged Link N0. MKD b
mm
D
mm
GL
to be provided
t1 t2 t3 t4 t5 t6 t7 AT 2D MID SPAN 6. THIS DRAWING SHALL BE READ WITH ARCHITECTURAL DRAWING.
1. B1 250 250 3 # 12 2 # 12 2 # 12 3 # 12 2 # 12 2 # 12 #8 @ 100mm C/C #8 @ 150mm C/C 7. ALL DIMENSION & DETAILS ARE TO BE VERIFIED WITH THE
END
Lo-600

SPECIAL CONFINING
#8@150
REINFORCEMENT COLUMN
a 2. B2 250 300 3 # 12 2 # 12 2 # 12 3 # 12 2 # 12 2 # 12 #8 @ 100mm C/C #8 @ 140mm C/C ARCHITECTURAL DRAWING.AMBIGUITY ANY SHOULD BE BROUGHT TO
1200

#90@85 THE NOTICE OF THIS OFFICE.


WHERE THE COLUMN 3. B3 250 450 5 # 16 3 # 16 2 # 16 2 # 16 #8 @ 100mm C/C #8 @ 170mm C/C
8. ALL DIMENSION ARE TO BE READ NOT TO BE MEASURED.
150

CONNECTED TO THE BEAM


150

4. B4 250 450 3 # 16 2 # 12 2 # 12 3 # 16 2 # 12 2 # 12 #8 @ 100mm C/C #8 @ 150mm C/C


75mm THK.P.C.C #8@150 IN ALL 4 DIRECTIONS 9. CLEAR COVER TO ALL REINFORCEMENT SHALL BE 50MM IN
75mm THK.B.F.S 5. B5 125 350 2 # 16 2 # 12 2 # 12 2 # 16 2 # 12 2 # 12 #8 @ 100mm C/C #8 @ 150mm C/C
150mm TKH.SAND FILLING {TYP. DETAIL OF BEAM. & FOUNDATION,40MM IN COLUMNS/STIFFENERS.
800 (typical detail of 6. B6 250 350 3 # 16 2 # 12 2 # 12 2 # 12 3 # 16 2 # 12 2 # 12 #8 @ 100mm C/C #8 @ 150mm C/C
10. DEVELOPMENT LENGTH SHALL BE 47 TIMES THE DIAMETER OF BARS.
COLUMN JUNCTION at TERRACE Lv} Lap in column) 11. FOUNDATION HAS BEEN DESIGNED FOR SBC 75KN/SQM.

ANNEXURE 4.3.
BIHAR PANCHAYAT STRENGTHENING PROJECT
SHEET NO -4.3./S/01

TOILET BLOCK
102,FIRST FLOOR, C/45 VIJAY NAGAR ,
CONSTRUCTION OF PANCHAYAT SARKAR BHAWAN KANKARBAGH,PATNA- 800026.
DETAIL LAYOUTPLAN OF OPEN FOUNDATION,G.L BAND,STIFFNERS, Phone- 9801213596,8863021957
E-mail - nisharchi@gmail.com
COLUMN & ROOF PLAN

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

You might also like