Professional Documents
Culture Documents
Form Inspeksi Concrete Pump
Form Inspeksi Concrete Pump
CONCRETE PUMP
Proyek : __________________________________ No. Alat : ______________________
Tanggal Inspeksi : __________________________________ Model /Type : ______________________
II MOTOR / ENGINE
1 Key Starting
2 Water Pump
3 Oil Filter
4 Oil Pressure
5 Lubrication
6 Fuel System
7 Radiator Water Cooling
IV HYDRAULIC SYSTEM
1 Hydraulic Pump
2 Hydraulic Filter
3 Hydraulic Filter Gauge 1
3 Hydraulic Filter Gauge 2
4 Hydraulic Oil Cooler
5 Hydraulic Hose
6 Hydraulic Hose Core Pump
7 Agitator (Baling-baling adukan)
8 Pressure Gauge
VI SAFETY DEVICE
1 Fan Belt (Tutup)
2 Fan Guard (Tutup kipas)
3 Tutup bucket
VII LAIN-LAIN
1 Accu / Liquid Level
2 Flushing Water Pump
3 Spare Parts
4 Kebersihan