Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

RESUME

NAME Kolukula Kotilinga murthy


Nationality Indian
DOB 12/11/63 .PP No –L 8412820 Valid till 2024 Hyderabad
Contact Details
Mob +919985094693.; kolukula33@gmail.com
Home of Record (nearest
airport) Skype; murthy kk
Home Address Address 3-59/2 pandillapalli 523184 AP.India

QUALIFICATIONS
 1981-1986 B.Tech Chemical Engg.Andhra University,Vishakapatnam,India

CAREER SUMMARY
An accomplished operations&commissioning Proffessional of Oil & Gas Onshore and
Process Facilities include Upstream and Downstream ,Petrochemicals Plants,
Refinery.
Multilingual – English, Hindi,Tamil,Telugu,Malayalam
23 years’ experience ( 1 onshore, 9.5 years Refinery &
12 years Petrochem experience) .Worked upstream & downstream facilities,

12 years exp .hands-on Operations,Commissioning and Start-up for DCS Honeywell


yokogawa systems ,
• worked in a multidiscipline and multination environment
and able to work with people at levels within the organisation;
• excellent organisation skills,communication skills.

KEY SKILLS:Oil&Gas ,Refinery DCS,,Process,Operations&Commissioning,training,


Experienced user of following computer programs and systems:
o Microsoft Office Pro 2003/XP (Win2000; XP), .
o Honeywell yokogawa DCS systems hands on operations excellence

TRAINING

KNPC MAA Refinery Training 2010

ADNOC Group
ADCO –JP/JO Test Passed,2013

Experience:KSA,Petro Rabigh-Nov 2015


Company -Petro Rabigh,KSA,
Hire Position –Process Refining Specialist-SOP :Review&Drafting Procedures
Familiar with DCS Operations Honeywell yokogawa systems
YMENT EXPERIENCE
Mar 2013 – oct 2013 NPCC Hire for ADNOC Group ADCOQWFFDP onshore
Process Precommissioning
Process Commissioning Supervisor
Identification of systems and sub-systems by marking up of PFD’s and PID’s – system
definition,
Developing and preparation of Pre-commissioning systems and
detailed procedures.
Co-ordination with Construction Team, Process Supervisors,
Board and Field Operators,
DCS Honeywell yokogawa systems hands on operational exp.

July 2002 – December 2011 KNPC Hire- MAA Refinery KNPC Kuwait
Operator
➢ Ensure Smooth and Safe Operations In Shifts.Monitor Process and Quality Parameters.
➢ Troubleshooting and Corrective Action wherever required..
➢ Coordinating with Maintanance
➢ Start Up and Shut Down activities for Planned/Unplanned Shutdowns/Start Ups.
➢ Preparing daily reports, Logging ,,
➢ Support The Internal Audits,
KNPC MAA-FUP Further Upgraded Project -MAFP UNIT-85,87,45,46,47

Feed Treatment- Feed from FCC UNIT

Feed Pretreatment : LPG is treated for H2S removal by Adip -Amine Treatment With 34 tray
Column from

2000ppm to 10ppm.

The unit has ADIP REGENERATION SYSTEM.

Propylene Recovery Unit: PRU-Unit 85

This is LPG Splitter. It consists of a (PROPANE –PROPYLENE SPLITTER ) Propylene


Purification Tower of 60M height with 185 trays. It consists of a Heat Pump Compressor to
maintain the bottom temperature of the Column.Products-PROPANE taken to gas plant in the
refinery&Propylene is pumped To Eqaute

MTBE Unit 45:

MTBE Prducing from Iso butelyne and Methanol in the presence of Strong Cataion Resin
Catalyst (A product of Sulfonation of a Co Polymer of Polystyrene and Di Vinyl Benzene)
Its used as Gasoline Blend

Alkylation Unit: Unit 46

Production of Iso Octane by the reaction of Iso Butylenes and Iso Butane in the presence of
Sulphuric Acid as Catalyst.This unit consist of a Centrifugal Compressor with a HP Steam
Turbine. Acid Gas Recovery Unit

Alkylation-high octane hydrocarbons, which are used in gasoline blends to reduce knocking

Its Premium Gasoline blend

47.Spent Acid Recovery unit- This Unit Regenerates Sulphuric Acid Requires for
Alkylate Unit

Dec 1990 – June 2002 Asian Peroxides Ltd Sullurpet India


Shift Supervisor
➢ Ensure Smooth and Safe Operations In Shifts.Monitor Process and Quality Parameters.
➢ Troubleshooting and Corrective Action wherever required.PLC,DCS Systems hands on
operation exp.
➢ Preparing daily and monthly reports, Restructuring Employee Training Plan,
Monitoring The Internal Audits, Implementation of ISO 9002
Hydrogen Plant & Hydrogen Peroxide AO Plants

HP :Hydrogen Plant:
Hydrotreatment&Naptha-Steam Reforming,
Hydrocracking-Steam reforming-Nickel catalyst:naptha to hydrogen
Hydrogen producing by the Naptha Steam Reforming After
Preteatment for Suphur removal-.Desulphuriser ,followed by
LT Shift Converter ,Followed by PSA- UOP Polybed for purification
Process : High Temperature High Pressure Catalytic Reactoins,
➢ Hydro treator ,
➢ De sulphuriser,
➢ Reformer
➢ Shift Converter,
Catalyst : Oxides of Nickel &Potash Coated ICI
Process Control- TDC 3000 DCS Honeywell yokogawa systems, hands on
operations experience

July 1987 – Nov 1990 Southern Synthetics Ranipet TN India


Shift Incharge- Unit -Formalin From Methanol
➢ Ensure Smooth and Safe Operations In Shifts,Monitor Process and Quality Parameters.
➢ Troubleshooting and Corrective action wherever required.

➢ Start Up and Shut Down Activities,Preparing daily and monthly reports.SOP Writing,
➢ Training Plan
➢ Control panel Operations expert

You might also like