Professional Documents
Culture Documents
CTV Part3
CTV Part3
HEAT EXCHANGER
EXCHANGER
TRAINING CENTRE
CONDENSER
Discharge Gas
Chicane
Cooling Water
Tube
bundle Liquid Line
TRAINING CENTRE
CONDENSER
Water
Entering 10 %
60 % 40 %
Refrigerant Liquid
TRAINING CENTRE
EVAPORATOR
Orifice
Distributor Eliminator
Liquid Line
TRAINING CENTRE
EVAPORATOR
Suction
Chicane Eliminator
Tubes bundle
Oil cooler
Distributor
Orifice
TRAINING CENTRE
EVAPORATOR
TRAINING CENTRE
DISTRIBUTOR
Evaporator
Distributor
TRAINING CENTRE
ECONOMISER
Suction to Second Stage
HP Liquid
Liquid
to Evaporator
TRAINING CENTRE
EXPANSION
EXPANSION DEVICE
DEVICE
TRAINING CENTRE
ORIFICE
TRAINING CENTRE
ORIFICE
TRAINING CENTRE
ORIFICE
to
H1
Evaporator
Orifice
TRAINING CENTRE
ORIFICE
to
H2 Evaporator
Orifice
TRAINING CENTRE
PERFORATED PLATES
■ T saturation EVP = f ( T in , T out EVP )
■ Absorbed power COMP = f ( refrigerant
flow)
■ The function of perforated plates is to limit
the amount of gaseous refrigerant produced
during the expansion process. Gas doesn't
contribute to cooling effect.
■ Orifice plates are designed for specific full
load operating conditions. More and more
gas is produced when operating at part load
conditions, this will increase absorbed
power .
TRAINING CENTRE
PERFORATED PLATES
Refrigerant Direction
TRAINING CENTRE
EVP APPROACH TEMPERATURE
Water Inlet
Water Outlet
Surface
TRAINING CENTRE
APPROACH - ∆T
• Condenser - water (CVGE)
Temperature
∆Τ
Water Outlet
Water Inlet
Surface
TRAINING CENTRE
APPROACH - ∆T
∆Τ Air Outlet
Air Inlet
Surface
TRAINING CENTRE
VALUES
• Approach Evaporator
R 12 ~ 2,5°C
R134a ~ 2°C
• Approach Condenser
– water cooled
R 12 ~ 1,5°C / 5°C
R134a ~ 15°C
TRAINING CENTRE
SOME DATA
TRAINING CENTRE
OIL CHANGE HIGH SPEED UNIT
TRAINING CENTRE
NORMAL DISTILLATION CYCLE
TRAINING CENTRE
OIL SAMPLING FOR OIL
ANALYSIS
TRAINING CENTRE
OIL SAMPLING
• Minimum sample volume required is 100 ml, fill
bottle with maximum of 80% of its capacity to
avoid overpressure problems due temperature
change
• Use only small bottles supplied by TRANE
• Glass bottle, part number : BOT 002E
TRAINING CENTRE
OIL SAMPLING
TRAINING CENTRE
HYGROSCOPICITY COMPARISON
9000 1.500
6000 1.000
polyolester 500
3000
mineral oil
0 0
1 2 5 10 20 50 100 200
Time (hours)
TRAINING CENTRE
OIL SELECTION TABLE
oil charge
UNITS
(liter)