Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

TRANSACTION PROCEDURE

1 Contractor and Developer sign the project contract with Certificate copy & passport copy,
and authorized signatory passport copy.

2- Within 7 (Seven ) banking days from signing the contract, Contractor bank issue RWA to
the Developer.

3- Developer Within Seven (07) banking days on receipt of RWA from Contractor, Developer
Issuing Bank issues SWIFT MT199 RWA to Contractor designated bank account
xxxxxxxxxxxxx. Developer provides a copy of the SWIFT MT799 Pre-Advice to Contractor.

4- After verification of Issuing Bank’s SWIFT MT199 RWA and within 3 (Three) banking days
of receipt of the MT 199, Contractor designated bank will reply Via bank SWIFT MT199
acceptance to receive MT799 Pre-Advice and SBLC MT760 from Developer Bank.

5- Within 3 (Three) banking days of receipt of Contractor bank reply SWIFT MT199,
Developer bank issue Pre-Advice SWIFT MT799 to Contractor bank.

6- Within 3 (Three) banking days of receipt of Developer Pre-Advice SWIFT MT799,


Contractor bank issue Bank Payment Undertaking ( BPU) via SWIFT MT799 for the agreed
excess amount above the project contract value of the SBLC to Developer designated bank
account.

4- Within 3 (Three) banking days of receipt of Contractor bank’s SWIFT MT799 Bank
Payment Undertaking (BPU), Developer Issuing Bank will issue the SBLC via SWIFT MT760
(APPENDIX D) to Contractor bank.

5- After receiving and verifying the SBLC MT760 (ICC600 or latest version), Contractor bank
will release MT103 within 5 Banking days from the receipt of the SBLC {Bank to Bank Swift}
or Wire Transfer (T/T) as per the (BPU) issued via SWIFT MT799 (APPENDIX C).

6- After receipt of full payment, Developer will deliver the hard copy of the SBLC to
Contractor bank via bank bonded courier in Seven (07) banking days. {Bank to Bank
Courier}

8- Within one year and one day, the Contractor/ Contractor bank shall claim the due amount
from the issuing bank.
款项。交易程序

1 承包商和开发商用证书复印件和护照复印件,以及授权签字人的护照复印
件签署项目合同。

2- 在签订合同后的 7(七)个银行工作日内,承包商银行向开发商发出 RWA 加权


风险资产。

3- 开发商 在收到承包商的 RWA 加权风险资产 后七 (07) 个银行工作日内,开发商


开证银行向承包商指定的银行账户 xxxxxxxxxxxxx 签发 SWIFT MT199 RWA。
开发商向承包商提供 SWIFT MT799 预先建议的副本。

4- 在验证开证行的 SWIFT MT199 RWA 后,并在收到 MT 199 后的 3(三)个银


行工作日内 ,承包商指定银行将通过银行 SWIFT MT199 回复接收来自开发
银行的 MT799 预通知和 SBLC MT760。

5- 在收到承包商银行回复 SWIFT MT199 后的 3(三)个银行工作日内,


开发商银行向承包商银行发出预先通知 SWIFT MT799。

6- 在收到开发商预先通知 SWIFT MT799 后的 3(三)个银行工作日内,承包商


银行通过 SWIFT MT799 向开发商指定银行账户开具超过 SBLC 项目合同价
值的约定超额金额的银行付款承诺 (BPU)。

4- 在收到承包商银行的 SWIFT MT799 银行付款承诺 (BPU) 后的 3(三)个银行


工作日内 , 开发商开证行将通过 SWIFT MT760( 附录 D)向承包商银行签发
SBLC。

5- 收到并验证 SBLC MT760(ICC600 或最新版本 ) 后 , 承包商银行将在收到


SBLC {Bank to Bank Swift} 或电汇 (T/T) 后 5 个银行工作日内根据( BPU ) 通过
SWIFT MT799(附录 C)签发。

6- 收到全额付款后 , 开发商将在七 (07) 个工作日内通过银行保税快递将


SBLC 的硬拷贝交付给承包商银行。 {银行到银行快递}

8- 在一年零一天内,承包商/承包商银行应向开证行索取到期

外贸中的 RWA 是指风险加权资产(risk-weighted assets),风险加权资产是对银行的资产加以分类,根据


不同类别资产的风险性质确定不同的风险系数,以这种风险系数为权重求得的资产。
风险加权资产的测评由两个因素决定:
(1) 银行的资产组合中各项资产的信用风险暴露;
(2) 这些信用风险暴露在未来带来信贷损失的可能性。
一些银行资产,例如银行所在国政府以银行的基准货币发行的债务被界定为无信用风险,因此银行的这类债
权资产的风险权重为 0,不承担信用风险资产要求。然而大多数贷款和其它银行资产都是对具有一定信用风
险的机构的债权,可能招致潜在的信用损失。

扩展资料:
风险加权资产的计算方法如下:
1、对于信用风险资产,商业银行可以采用内部评级法、外部评级法和标准法计算
信用风险加权资产是衡量资产组合或单笔资产所承受的信用风险总量。对银行的信用风险资产进行分类,根
据不同的资产类别确定不同的风险权重(风险系数)。以风险权重对相应的资产进行加权(乘以风险权重)即得信
用风险加权资产。
2、对于市场风险资产,商业银行可以采用标准法或内部模型法计算
市场风险加权资产是指因市场价格(利率、汇率、股票价格和商品价格)的不利变动而使商业银行表内和表
外业务发生损失的风险。具体包括商业银行交易账户中的利率风险和股票风险,以及全部汇率风险和商品风
险。
3、对于操作风险资产,商业银行可以采用基本指标法、标准法或高级计量法计算
操作风险加权资产是指由不完善或有问题的内部程序、员工和信息科技系统,以及外部事件所造成损失的风
险,包括法律风险,但不包括策略风险和声誉风险。
参考资料来源:百度百科-风险加权资产

You might also like