To File No. P-17024/1/2019-RC (part) (FMS-369031) Government of India Ministry of Rural Development (RC Division) Krishi Bhawan, New Delhi Dated the 13" January, 2021 Principal Secretary (PR & RD), Block No. 05, A.P Secretariat Office, Govt. of Andhra Pradesh, Velagapudi, Guntur, Andhra Pradesh, E-mail: prisecy_pr@ap.gov.in Subject: Andhra Pradesh- Clearance to the project proposal under PMGSY-III, Batch I of 2020-21. Sir, mm, Kindly refer to the project proposal submitted by the State of Andhra Pradesh under PMGSY- Batch 1, 2020-21.The proposal was considered by the Empowered Committee in its meeting held (on 24.09.2020. I am directed to convey that, on the basis of the recommendations of the Empowered Con the mmittee and compliance report submitted by the State, the Ministry hereby accords clearance for proposal with revised cost as per summary given below:~ fitems Up-gradation LSBs Total roads [Value in Rs Crore 760.09 645 7.66.54 INo. of works 170 2 170 roads 2 LSBs [Length in Km 1,378.54 162.20 m 1,378.54 km roads 162.20 m LSBs [Average cost per Km 55.15 3.98/m ((Rs. In Lakhs) [MoRD Share : Rs. 458.74 Crores State Share : Rs. 307.80 Crores ‘The OMMAS based road list along with the abstract costs is enclosed, State should ensure 9 m top width for entire road length of 5.5 m carriageways per IRC guidelines. However, in exceptional cases where adequate land is not available for 9 m top width, only for minor stretch on the entire length of the particular road, minimum 7.5 m top width with adequate road safety measures may be provided. All CD works including new/existing should be provided 9 m top width, 2- ti, Quality control lab must compulsorily be established and geo-tagged_time-stamped Photograph of Engineer-in-Charge visit in the lab should be uploaded on OMMAS before commencement of the physical work. No bill will be entertained in its absence, iii, State should get appropriate number of samples tested for stabilization of base and sub-base courses for determining the dose of stabilizer for required strength, before award of work, from STA laboratories/State Government approved laboratories having such facilities iv. State must ensure that the payment to Cement Concrete roads is made only after verification of target strength achieved after 28 days based on cores taken from the pavement as per MoRD specifications. ¥. Since e-Marg module will be used for monitoring of maintenance contracts for roads under PMGSY IIL, State should ensure that process of onboarding on e-Marg is completed. vi, State must ensure that the payment for execution of those roads where the Stabilized sub- bases or bases are provided, is made only after verification of target UCS strength of stabilized layer achieved after 7 days based on cores taken from the pavement as per MoRD specifications. Vii, State should complete design stage road safety audit for all roads having length 5 km and more should be completed before award of works and the same should be uploaded on OMMAS. 4. The state should enter into Memorandum of Understanding (MoU) between NRIDA, Technology Provider and SRRDA for the roads sanctioned using new materials /IRC Accredited materials as per new technology initiative guidelines. 5. The State will enter into a Memorandum of Understanding with the Ministry of Rural Development, Government of India before launching of the Scheme in the concemed State for Providing adequate funds for maintenance of roads constructed/upgraded under PMGSY for initial five years routine maintenance, and for further five year routine maintenance including periodic renewal as per requirement. Maintenance of rural roads and bridges constructed under PMGSY will be monitored through e-Marg Module, therefore state needs to switch over from BOQ Model to PBMC Model as pre-requisite for on boarding on e-Marg. (Two copies with signed and stamped by the competent authority on each page in original). 6. Further, State has to comply with Para-21.4 of the PMGSY-III Programme Guidelines which stipulates that Planting of fruit bearing and other suitable trees, on both sides of the roads would ‘mandatorily be taken by the State Government by using funds under Mahatma Gandhi National Rural Employment Guarantee Scheme and other Central and State Schemes, Guidelines on Tree Plantation along with Rural Roads (IRC:SP:103-2014), published by Indian Road Congress should be followed for plantation of trees along the roads constructed under PMGSY-III. 7. _Asper the revised instructions issued on 22" December, 2020, overall timeline from sanction of projects to commencement of works is 72 days. All formalities starting from the publication of advertisemenNIT to the award of works (issuing of letter of intent/acceptance etc.) shall be completed within a period of 38 days. In ease, works are to be restendered, instead of 21 days initially given for submission of bids, 15 days time should be given. State should ensure to implement a is provision in letter and spirit. A copy of the circular dated 22" December, 2020 is enclosed for reference and necessary compliance. 8 This issues with the approval of the Competent Authority in the Ministry of Rural Development, Government of India. Encl: Yours faithfully, i, OMMAS based road list along with the district abstract costs, ii. Copy of circular dated 22"! December, 2020 (Mamta) Director (RC) Tel: 011- 23073702 Copy to: PS to Hon’ble Minister (RD)/ PPS to Secretary (RD)/ PPS to AS&FA (RD)! PPS to AS (RD) PPS to JS (RC). Copy also to:- 1 2. 8 Chief Engineer, Andhra Pradesh, PR & RD Department. Director (Technical), NRIDA with a request to ensure compliance on the condition imposed and bring to Ministry's notice in case of non-compliance Director (P-I) with a request to follow up on the award of works. Director (P-I1), Director (P-III), Director (F & A), NRIDA, New Delhi aa Pradhan Mar Gram Sask Yojana Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Sanction Letter No :P-17024/1/2019-RC (part) Sanction Date : 13/01/2021, ‘State : Andhra Pradesh Sanction Year : 2020-2021 Batch: 1 Collaboration : Regular PMGSY Note: All Costs are in Lakhs and Lengths ae in Kms. Sr. Core Name-of Road /Bridge Category __ New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost | Habs (1000+, Network No. (NU) Technology Bridge (utrs)_ Way Wicth (Nos) “(Rs Lacs) (including (Including (RE Lacs) 500+, 250, Length Additional Additional “250, Total) State Share) State Share) (Lacs) (Rs Lacs) 1 2 3 4 5 6 a 8 ° 10 " 2 8 4 Road Proposals District Anantapur Block: Anantapur 1 TO TOI-NH-44to Kotanka via. Upgarde 7 9.900 3.750 Complete 15. 185.83 125.18 311.01 20.22 9 ,0,0,0,9) ‘A.Marayana puram and NN Kona Block Anantapur Total 9.900 5 185.83 125.18 311.01 20.22 @ ,0,0,0,9) Block- Beluguppa 2 T05—TOS-KaluvapallJeedipall’ —Upgarde 5.905 3.750 Complete 2 146.05 2451 15.89 3,1,0,0,4) toad to Duddekints via Kenampall Block Beluguppa Total 5.905, 2 146.05 98.46 24451 15.89 8, 1,0,0, 4) Block: Mudigubba 3 Tot —TOr-Malakavemula DP Rand Upgarde > 20735 34.750 Complete 16 41488 278.59 93.47 45.08 (0,7,8,5, 20) B road to via Mallepals Block Mudigubba Total 20.735 6 414.88 278.59 693.47 45.08 (0,7,8,5, io) Block- Peddavadugur 4 TO9 —_Tos-chittoor to Pamisi via Upgarde CMR sitpast 8.460 3.750 Complete 6 195.08 139195703227 @,3,2,0,7) Veerannapali G Kondupali ‘Wee Process Block Peddavadugur Tot 8.460 ‘ 195.08 131.95 327.03 24.27 @,3,2,0.7) Page 1 of 40 Generated On : 13/01/2021 07:01 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter 5 veaweria, MimecfRoad/Srige Category New Road is) / Carriage Stage Const. CD Work MoRD Cost | tate Cost Total Cost Mant. Cost Habs (1000, Network No. (NU) Technology Bridge (Mtrs). Way Wsth (os) “(Rs Lacs) (Including (eluding (Rs Lacs) "300+, 250% Length Additional Additional “250, Total State Share) State Share) (RS Lacs) (Rs Lacs) 1 2 3 4 5 6 7 8 9 10 " 2 a 4 Block- Putlur 5 TOI _—Tor-Putlur cross tomeet —_Upgarde Waste Plastics 21.188 3.750 Complete 19 ore 88s 819575827 6.2.31, 12) BKS Guguc road via Narayanaredeypal Maddipalt Magugupali Block Putlur Tota, 21.188 1” 4072 3788S 819.57 53.27 (6,2,3,1, in) Block- Puttapartht 6 106 T06-Dharmavaram - Kodur—_Upgarde : 16.900 3.750 Complete 18 400.29 33.29 806.58 52.49.2,7,5 Road to Banclapal Cross Block Puttaparthi Total 16.900 6 48329 373.29 06.58 52.43 2,7,5,1, i) Block- Raptady 7 TOI“ Tor-Rapthadu to Upparde Waste Plastics 6500 3.750 Complete og 10.88 97.12 241.00 15.67 (4,3,0,0,7) Thopudurthy via, ‘Ayyavaripal ‘and ‘ukkacherta, Block Raptadu Total 6.500 ‘ 97.42 241.00 15.67 (4,3,0,0,7) Block- Uravakonda 8 THO —THO-Uravakonda to Upsarde 12.087 3.750 Complete 3 2126017527 43653 28.39 9,2,2,0, 13) Vajrakarur via Shiaksanipall,s Rammpuram,Tatrakal and Gansta, Block Uravakonda Total 12.087 a 261.26 175.27 436.83 28.39 (9,2,2,0, 43) District Anantapur Total 101.675 87 2,320.99 1,558.71 3,879.70 252.22 (35, 25, 20,7 287) neil wee oer Sr. Core Name of Road / Bridge Category Network No, Nv) 1 2 3 4 District- Chittoor Block- 8 Kothakota 9 WRLOY —“RLOT-Bandarwaripalle to Upgarde osuvaripalle road (Pitehalavandtapalle) Via CChowtakuntapale Block B Kothakota Total Block- Balredd Pale 10 TOI —"TOF-MCB road 10 PS road via Upgarde BelupaliBurisettipalPatn apa and Bellamadugu 11 MRLOT —-MRLOT-Dasartapali oad to Upgarde Dasarlapalli road via KotrepalKothur Sanipall ‘and Munipal Block Bairedd Palle Total Block- Gangavaram 12 TO7_—"TO7-MCB Road to Oandapall’ Upgarde ‘oad via Jeedimakulapal, Kurappallt vemanapalt Block Gangavaram Total ee Page 3 of 40 eer Pe Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter New Road (kms) / Carriage Stage Const. CD Work Technology Bridge (Mrs) Way Wicth (os) Length 5 ‘ 7 8 ° 5.100 3.750 Complete 15, 5.100 8 Waste Pasties 6730 3.750 Complete 1 Waste Plastics 6.550 3.750 Complete 17 13.300 8 Waste Pasties 6700 3.730 Complete 9 6.700 9 Generated On : 13/01/2021 07:01 PM MORO Cost | State Cost Total Cost Maint. Cost Habs (1000, (Rs Lacs) (including (Including (Re Lacs) 500», 250s, Additional Additional «250, Total) State Share) State Share) sacs) (Rs Lacs) 10 " 2 3B “4 179.70 119.80 299.50 -——«17.99 (0, 0,1, 10 iy 179.70 119.80 299.50 17.99 (00,1, 10, in 144.00 96.00 © 240.00 14.402,2,5,2,11) 243.00 162.00 405.00 2430 (1,3,5,3, 12) 387.00 258.00 645.00 38.70 (3,5, 10.5, 23) 72800 152.00 «380.00 2.80 @,3,2,4,9) 228.00 152.00 380.00 22.80 (0, 3,2, 4,9) sr. 2 Core Name of Road / Bridge Network No 2 3 Block: Kurabalakota TO! TOL-MBT Road to Thettu Via Chintalahgarikota, Jallavandlapalle, ‘Arogyapuram Block Kurabalakota Total Block- Mulakalacheruvu To TONKA to angasamudram road Vie Kotieddtgarpale, ittasompalle,Amuldertapat le Block Mulakalacheruvs Total Block- Penumury Tos-Putkallu road to CTR: enumur road vie Pidathalabal,Putkala Block Penumury Total Tos Block: Pilery 16 TO! _—_TOI.CKT Road to MP Road via Kurmarapale, Pulavodcu Yellampalte, Thanavodalpalle Block Pleru Totat Page 4 of 40 aaa Category (wy Upgarde Upgarde Uosarde Upsorde Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter wSlogy and.tns) {Carriage Stage Const. CD Work MoRD Cost | State Cost Total Cost | Maint. Cost” Habs (1000+, Technology Bridge (Mtrs) Way Whcth (Nos) “(Rs Lacs) (Including (Including "(Re Lacs). 300% 2500; Length Additional Additional <250, Total) State Share) State Share) (Bs Lacs) (Rs Lacs) 5 6 7 6 ° 10 " 2 n 1“ 7.500 3.750 Complete 24 26625 177.50 448.75, (26.64 (0,2, 0,13 ‘sy 7.300 Fy 266.25 177.50 443,75. 26.64 (0,2, 0,13, 13) 8.200 3.750 Complete 25 29859 199.05 497.65 29.87 (0,1 10) 8.200 25 298.59 199.06 497.65 29.87 (0,1,5, 4, io 5.400 3.750 Complete 7 72.80 11520 288.00 17.28 0,3,6,21, 40) 5.400 7 17280 115.20 288.00 17.28 (0,3, 6,21, 30) - 4474 3.750 Complete 10 130.00 100.00 250.00 © «15.00 @,0,0,2,2) 4474 10 150.00 100.00 250.00 45,00 (0,0,0, 2,2) Generated On : 13/01/2021 07:01 PM (MI Sr Core Name of Road / Bridge Network No. 1 2 3 Block- Puttur 17 TO3_—_TO3-AR Road to AR Road via Gollapal CN Kandiga vvenugopalapuram Block Puttur Total Block- Ramasamudram 18 TOL TOr-MPL- RMS Road tonPL. RMS Road via Elakapalle,Chembakur Bali palle 19 TO. —TO2-Ramasamudram to State Border via Kanagant 20 MRLOI—-MRLOT-Edigapalle ‘Chembaku road to Ragimakulapalle road via ‘Adiganipalle,Thumakalapalt, @,Gosuvarpale,Peddarahup site Block Ramasamudram Total ‘Block: Thamballap 2 Ts TORT road to osuvarpale Road up to Chakalapale Block Thamballapalle Total Page 5 of 40 Category wu) Upsarde Upparde Upgarde Upparde Upgarde Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter New Road (Kms) / Carriage Stage Const. CD Work MaRD Cost | State Cost Total Cost Maint, Cost | Habs (1000+, ‘Technology Bridge (hers) Way Width (Nos) “(Rs Lacs) Cncluding (Including (RS Lacs) 500s, 250% Length ‘Additional Additional “250, Tota) State Share) State Share) (Bs Lacs) (RS Lacs), 5 6 7 8 ° 10 " 2 8 “ 442 3.790 Complete 7.00 52.0 130.00 7.80 (0,2,2,3,7) 4022 1 78.00 52.00 130.00 7.80 0, 2,23, 7) 12.900 3.750 Complete 24 377180690 a.77 1,5, 415 5) 6550 3.730 Complete 11 m7 498040 AT (14,1, 0,6) 7130 3.750 Complete 15, 28.85 165.90 41475 24.89 0,1,6,4, 11) 26.600 50 ass 567.50 1,418.75 85.13 2, 10,11, 19, ay 11.000 3.750 Complete 22 31950 213.00 5250.31.96 0,00, 11, 11.000 2 319.50 213.00 53250 31.96 (0,0,0, 11, in Generated On : 13/01/2021 07:01 PM AM se 2 Fn Page 6 of 40 Core Name of Road / Bridge Category Network No, ou) 2 3 Zi Block: Veduru Kuppam Tor TOI-Tirupati-Devalampeta —Upgarde oad to Anny Devalampeta road via Jandlapeta, Diguapalialy Block Veduru Kuppam Total Block- Yerpedy TO} —_Tos-Yerpedu Sadasivapuram —Upgarde Road to RPK Road vin, Modugulapalem, Siddalangunta and Saraswathikandriga Block Yerpedu Total Block- Yerravaripalem To. TOR-UK Penta road to Upgarde Bodevandlapal Gundalabyts Road Block Yerravaripalem Total District Chittoor Total District- East Godavarh Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter cnrotogy eetagitng),| Carriage Stage Const, CD Work MaRD Cost | State Cost Total Cost Maint. Cost | Habs (1000+, Technology Bridge (ts) Way Wicth (os) “(Rs Lacs) including Including (Rs Lacs) 300%. 2500" Length Additional Additional <250, Total) State Share) State Share) (Bs Lacs) (Rs Lacs) 5 ‘ 7 . ° 10 " 2 8 “4 11.450 3.750 Complete 12 2.20 194.80 487.00 29.22 (0, 4,7, 28 bey 11.450 2 29220 194.80 487.00 29.22 (0,4,7,28, 39) 2.000 3.750 Complete 360 2.40 106.00 6.36 (1,1,4,4, 10) 2.000 8 63.60 42.40 106.00 636 (1,1,4,4, io) 10.200 3.750 Complete 13 195.00 130.00 325.00 «19.50 (@,0,2,2,4) 10.200 2B 195.00 130.00 325.00 49,50 (0,0,2,2,4) 116.346 214 3,484.89 2,321.26 5,803.15 348.25 (6,31, 50, 126, 213) Generated On 12/01/2021 07:01 PM IMI I Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Sr. qCare ., Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work | MoRD Cost | State Cost | Total Cost /Maint, Cost” Habs (1000- Network No (VU) Technology Bridge (Mrs) Way Wicth (Nos) (Rs Lacs) (including (RS Lacs) 500s, 250+, Length Additional «250, Total) State Share) State Share) (Lacs) (Rs Lacs) 1 2 3 4 5 ‘ 7 8 ° 10 1" 2 a “ Block: Anaparthi 25 TO? TO2-Rond from Anaparth to Upgarde Waste Plastics 5502 3.750 Complete 2 W083 120.55 301.38 «19.60 (2,0,0,0,3) ‘meet SR road at Tessipud Wa Koppavaram Block Anaparthi Total 5.302 2 180.83 120.55 301.38 19.60 2,0,0,0,3) Block- Gollaprolu 2% TOL | TOL-Chebrolu Vilage to Upgarde - 5150 3.750 Complete 212.9% 1419735493 -23.07 @,0,0,0,2) Kathipad Block Gollaprotu Totat 5.150 ’ 212.96 141.97 35493 23.07 (2,0,0,0,2) Block: Jaguampeta 27 T03—TO3-Rajepudi to Upgarde 8.000 3.750 Complete. 2 200.38 133593397271 4,1,1,0,6) Bhupatipaler Block Jaggampeta Total ‘8.000 2 200.38 133.59 333.97 21.71 4, 1,1,0,6) Block: Korukonda 28 -WRLO7 —-MRLOT-Butchempeta to —_Upgarde - 5.000 3.750 Complete 156.26 104.18 26044 «16.93 2,0,0,0,2) ‘Munagala road Block Korukonda Total 3.000 1 156.26 104.18 260.44 16,93 @,0,0,0,2) Block: Pithapuram 29 106“ TO6-Raparthi RB road to —_Upgarde : 5.800 3.750 Complete 7 19074 77.16 31790 20.67 (5,0,0,1,6) kolanka via Narsingpuram jamulapal Block Pithapuram Total 5.800 7 190.74 127.16 317.90 20.67 (5,0,0,1, 6) Page 7 of 40 Generated On : 13/01/2021 07:01 PM OAM | sr 30 a” 2 2 Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Core Name-of Road / Bridge Category New Road (Kms) / Carriage Stage Const, CD Work | MoRD Cost | State Cost Total Cost Network No, (W/W) Technology Bridge itrs) Way With (Mos) (RS Lacs) (Including (Including Length Additional Addition State Share) Sta 1s Lacs) 2 3 ‘4 5 ‘ 7 ‘ ’ 10 " Block: Sankhavaram MRLO® —MRLOG-9 by 5 of Sankavaram Upsarde 6630 3.750 Complete 7 219.40 6275.67 Velang to P-mallapram va Sidvarpalem,Yeraapuram ‘Dokampstern Bock Sankhavaram Total 6.630 7 219.40 146.27 365.67 Block: Thondangt Tos To+-A.Kothapali to Upgarde Cv Bipast 7280 3.750 Complete 6 155570398 as895 Trammayyapeta ‘Wee Process Via? Chinnayyapalem Block Thondang! Total 7.200 ‘ 135.97 103.98 259.95, District East Godavari Total 302 334431654 877.70 2,194.24 Distrct- Guntur Block: Belamkonda TOI TOI-Chandrajuplem to Upgarde 6500 3.750 Complete 8 261.60 7440 6.00 Hazanabad ve vannayapatem Block Belamkonda Total 6.500 . 2616017440 436.00 Bock: Chebrole Tie TeNarakodury to Upsarde —Geotertie 4300 3.750. complete 1 1740011600 290.00 lemalepads Block Chebrole Total 4300 1 17400 146.00 290.00 \ycaalle Ogg ge 8 of 40 = eat Generated On : 13/01/2021 07:01 PM " 2 » “ Sock eld 50 TO! TOFerabalem to Nanda! Upaacde 6000 3.730 Complete vs 11560 aap.00 1880 @,1,0,0,4 Block Vidar Total 6.000 0 40115460 289.00 18.80.G,1,0,0,4) | Block Vinskonda | 51133 Ta3Punada to Kanda Uppade Waste Pastcs—=~=S«S.ATI «780 Complete a yerwo 24160 aK 387 ,1,0,1,4 | vin Gokonasande | Pessaratonde aplvaram Block Vinukonda Total oan Beato 60400 39.27 @.1,0,1,4 Distrit Guntur Teta nae 1455323050 3,487.00 0,717.50 546.74 (63,7,6,1, 7 Distret- Krishna ) Block: A Kendra . 52 NRLO4—NRLO4West Nachavaram to Upgarde 7.218 3.750 Complete. 3 937 153.92 382.29 24.93 (6 ,0,0,0,6) Patha Repudt Block A Kondur Total 7218 2 229.37 152.92 38329 24.93 6 ,0,0,0,6) Block- Atripalle 53 WRL29—NRLZ9-Morsapudi to pathaUpgarde 8.124 3.750 Complete 5 as 155.29 386.72 5.15 6,0, 1,0, 7) ravicheca via. ‘amannaguder and vattigudupadu Block Agiripale Total 8.124 5 24s 155.29 386.72 25.15 (6,0, 1,0, 7) Page 12 of 40 Generated On: 13/01/2021 07:01 Pm MONI Sr. Core Network No, Name of Road / Bridge | Category inv) 1 2 3 4 Block- Banturily 54 TO! ToL-Pedatummidi to -Manimeswaram via Chinatummici,Arthamury Sa ‘thulury Block Bantumili Total Upgarde ‘Block- Gampalagudem 55 MRLI4—MRLY4-Ammicedigudem to ‘Vamakuntla via Pedda Komire, Medi, Sobbala, Gullapud, Kommireddipals Vaviala Block Gampalagudem Total Upgarde Block- Gudlavalleru 56 MRLOS—MRLOS-Penjendra to CChandrala via Cheam Gudlvalery Singur Block Gudlavallery Total Upparde Block- Gudur 57 TO1_—_“TOr-Pedana to Pamasala via Guduru,Tummalapalem Kappaladodat Akumannady Block Gudur Total Upgarde Page 13 of 40 Road List for attachment with Sanction Letter New Technology Waste Pasties Waste Pastis Pradhan Mantri Gram Sadak Yojana Road (kms) / Carriage | Stage Cons. Bridge (Mrs) Way Wiath (os) ‘Length O 7 8 ° 5.300 3.750 Complete 11 5.200 " 8.800 3.750 Complete 4 8.800 4 6.480 3.750 Complete 10 6.480 10 12.300 5,500 Complete 12.300 6 Generated On : 13/01/2021 07:01 PM CD Work | MoRD Cost (is Lacs) 10 mn man 288.60 288.60 29s 279.52 599.46 549.46 State Cost | Total Cost (including (Including Additional Additonal State Share) state share) (is Lacs) (RsLacs) " 2 150.47 73.18 150.47 373.18 193.40 482.00 193.40 482.00 18818 467.70 188.18 467.70 130 920.76 371.30 920.76 Maint. Cost (Rs Lacs) 2 2428 24.28 a 31a so. 30.42 (3 58.74 38.74 Habs (10006, 500+, 250+, 250, Total) (6,12,5,4 2) (6.12,5,4, 2 (5,2,3,0, 20) 5,2,3,0, 20) @,1,1,0,5) +4,1,0,5) 6,12,7,5, 2) 6.12,7,5, 2) Sr Core Name of Road / Bridge Network No. 1 2 3 Block: Jaggayyapeta 58 TO! TOt-Jayanthipuram to Nawabpeta via Pochampal onakanch Block Jaggayyapeta Total Block: Kalin 59 TO3_TO3-Apparaopeta to CGanspudt via Pedapatlapudt Block Kallding Total Block- Keduru 60 MRLOT—MRLOT-Uipatme to Salempater via Verugpalapuram Block Koduru Total Block: Machitipatram 61 MRLOT_—-MRLOT-BandarPort to Pallethummalapalem via, Garalacibba Poatitipps ©2101 Tor-Pothiredipaem to Gollaguem of Pedapatnam ia Potlapalem Kothpust CCinwvelapatem (darevpalem Block Machilipatnam Total Page 14 0f 40 Category «wv) Upgarde Upsarde Upsarde Upsarde Upgarde Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost. Technology Bridge (Mtrs) Way Wiath (Nos) (Re.Lacs)—ncluding (Including Length Additional Additional State Share) State Share) (sacs) (Rs Lacs) 5 ‘ 7 8 ° 10 " 2 11.650 3.750 Complete 33497566 59.15 11.650 a 353.49 235.66 589.15 6.955 3.750 Complete 12 380.40 -758.60 639.00 6.955 2 380.40 258.60 639.00 4.500 3.750 Complete 8 219.42 150.60 370.02 4.500 a 219.42 150.60 370.02 442 3.750 Complete 6 19.15 13378 at : 9.025 3.750 Complete 33 we 35492 634.30 13.437 » 57853 388.68 967.21 Generated On : 13/01/2021 07: Maint. Cost Habs (1000+, (Ps Lacs) | 5002, 2800, «250, Total) 3.32 (4,0,0,0,4) 38.32 (4,0,0,0,4) 4153 6,2,0,0,7) 41.53 (6,2,0,0,7) 24.05 (5,0,1,0,6) 2405 (5,0,1,0,6) 21.64 (1,2,0,0,3) 4124 1,634.14) @.8,3,4, in, ‘MIN Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter St. | Gore | Name of Road’ Bridge (Category New Road Wis) / | Caringe. Stage Const. '€D Work NoRD Coat Network Wo. (WU) Technlosy ‘ridge ts) Way Wath ‘oon “else th ie 3 4 5 é 7 : + Block urd © WALO9 |NRLOSBorvancha to ——Upgarde ca Bupast. 6630-3750, Comte 9 21698 venamacla wet Process Block Nuzvid Total 6630 ’ 216.98 lock Pamidimukiala 4 ToL ToL to Ventraprasnda pga 3.000 5.800 Complete 3 ine va Gopvanpaiem Marrvada Menara ‘barat Block Pamicimuktala Total 3.000 3 wa lock Thetiavalara 6 TO (Tor-thotaatvuto ——_Upgnrde S510) -3750 Compete 6 21626 Penamalur Block Thotlavallra Total son ‘ 286.26 Block: Veerlapady 6 TOY Tot Road fom paid 10.20 3.750 complete 13 sis onatanapal to Jayant a dachraren chowapal lock Veerullapad Total to.120 Bus Dish Khna Total 0.7 masons DisritKarnot m \ not Seer Page 15 of 40 nal Generated On : 13/01/2021 07:01 P S08 es grat oft ee ae State Cost Total Cost (including (neluding Additional Additional State Share) state Share) (Bs Lacs) (Rs Lacs) " ” 14630 363.28, 146.30 363.28, 119.16 292.40 119.16 292.40 198.80 485.06 198.80 485.06 267.00 648.75, 267.00 648.75 2,977.36 7,368.52 Maint. Cost | Habs (1000+, (Lacs) 300+, 250%, +250, Tota 8 1“ 2.62 4,1,0,0,5) 23.62 (4,1,0,0,5) 19.00 (@,1,0,1,4) 19.00 (2,1,0,1,4) 31.56 @2,0,0,0,2) 31.56 @,0,0,0,2) 2.0) 4,1,0,0,5) 42.09 (4 477.90 (69, 40,21, 14, 144) 0,0,5) M0 Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter 5 Sort yo, NAMEOFRoad/ Bridge Category New Road Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost” Habs (10006, Network No, (NU) Technology Bridge (Mtrs). Way Width (Nos) “(Rs Lacs) Clncluding Including (Rs Lacs). 500+, 250+, Length Additional Additional “250, Total) State Share) State Share) (Rs Lacs) (RS Lacs) 1 2 a 4 fe 6 7 8 ° 10 " 2 2 “ Block: Bandk Atmakur 67 MRLIY—MRL11-Parmapall to Upaarde 5.023 3.750 Complete 2 168.04 11256 281.40 «16.88 @,0,0,0,2) Yerraguntla va Kakanur ‘Block Band Atmakur Total 5.023, 2 168.84 112.56 281.40 16.88 (2,0,0,0,2) Block- Bethamcherla 68 TOI_—_Tor-Road from Balapalapalli Upgarde 9.453.750 Complete 15, 31920-21280 532.00-——«31.82 B,0,0,0,3) to Bugganipall via Kolumatapals Block Bethameherla Total 9.145 6 319.20 212.80 532.00 31.92 2, 0,0,0,3) Block- Gonegandla 69 TOA Tos-Peddamarrveed to _Upgarde 10.000 3.750 Complete 12 14820 98.80 247.00 14.82 @,0,0,0,2) Peddanelatur via. Chinnamarriveedu Block Gonegandla Total 10.000 2 98.80 247.00 14.82 (2,0,0,0,2) Block- Gospadu 7 TO_—Tr-Deebaguntla to ON Upgarde 8.390 3.750 Complete 24 301.80 201.20 503.00 «30.19 (4,0,0,0,4) Road via Maseecupuram, Mothkulapalll and angaveram Block Gospadu Total 8.390 2 301.80 201.20 503.00 30.19 (4,0,0,0, 4) Block: Gudur 71 To2 —_To2-GucurtoPeddanelatur Upgarde 14752 3.750 Complete 26 aad 29418 735.40 44.12 (10,1, 0, 2) via Pulakurthy Block Gudur Total 14752 26 M126 29416 735.40 44.12 (1,0,1,0,2) Page 16 of 40 Generated On : 12/01/2021 07:01 PM IAM l) Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter 5 eect yo, Name OF Road /Bridge Category New Road Kms) / Carriage | Stage Const. /CD Work | MORD Cost State Cost Total Cost ” Maint. Cost Network No, (WU) Technology Bridge htrs). Way Wicth, (Nos) (Rs Lacs) (Including Including (Rs Lacs) Length Additional Additional <250, Total) State Share) state Share) (is Lacs) (RS Lacs) 1 2 3 4 5 ‘ 7 8 ° 10 " 2 a “4 Block- Kosigh 72 TOL _—_Tor-Sathanur to Dude via__Upgarde 9.300 3.750 Complete 4 13350 -#9.00 «22.50 —*13.36 (1,0,0,1,2) Sathanur Kottala, Chirthanakal Block Kosi Total 9.300 4 133.50 49.00 222.50 13.36 (1,0,0,1,2) Block- Kowthalam 73 TO2_—_To2-Urukunda to Kowthalam Upgarde 5.238 3.750 Complete 14 5.70 63.80—+158.50 957 (1,0,0,0,1) Block Kewthalam Total 5.238 " 95.70 63.80 159.50 9.87 (1,0,0,0, 1) Block: Mandya 74 MALO? —_MRLOZ-Bheemavaram to NA Upgarde: 5.98 3.750 Complete 16 216.0 14420-36050 24.64 @,0,0,0,3) Read via N-Kathapalli ana Billalapuram Block Nandyal Total 5.928 16 216.30 144.20 360.50 21.64 (,0,0,0,3) Block- Peapally 75 TOL —_TOI-Peapuly to Upgarde 14795 3.750 Complete 10 3395 149302325 7.40 3,0,0,0,3) Sabashpuram via Peddapedilla, Chinnapodila Block Peapally Total 14.795 10 373.95 249.30 623.25. 37.40 (30,0, 0,3) Block: Sanjama 7) Ta riWeanala pear 17a 3.750 Complete “31 S180 36120 eG a9 6,4 Banaganapal via Shaver, Nlururandla ane Thamadapa Block Sanja Total 17879 3H 54180 361.20 903.00 ato oe ot age 17 of 40 \ ok ees, 370172021 07:01 Pm Bienen eI eee Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter 5 Weteert No, NameofRoad Bridge Category New Road Kms) / Carriage Stage Const. CD Work MoRD Cost | State Cost Total Cost | Maint. Cost Habs (1000, Network No, (N/U)” Technology Bridge Mtrs) Way With, (Mos) “(RE Lacs) Including (Including "(Re Lacs). 500%. 250", Length Additional Additional «250, Total) State Share) State Share) (Rs Lacs) (RS Lacs) 1 2 3 4 5 ‘ 7 8 ° 10 " 2 0 4 Block: Sirvel 77 TOT TO7-Sirvel to Chandalur via _Upgarde Waste Plastics 13.000 3.750 Complete 15 40.10 295.40 738504431 perur, Yerragudidinne and Chitakatur Block Sieve! Tot 13.000 6 40.10 295.40 738.50 44.31 Block- Tuggalt 78 TO2_—_TOD-Pagidroy to Kalichetla_Upgarde 13.000 3.750. Complete 17 3240 221.60 55400 «33.24 B,2,0,0,5) via Pagiroykothur, Husainapuram, Kadamakuntla Block Tuggali Total 13.000 7 332.40 221.60 554.00 33.24 @,2,0,0,5) Block- Velgodu 79 TO! TOL-Gunthakandala to meet Upgarde 7.550 3.750 Complete 11 22.18 188.12 -470.30-«28.22_@,0,0,0,2) Velgode Velpanut road via Jamnmulamma temple road Block Velgodu Total 7.350 " 202.18 188.12 470.30 28.22 @2,0,0,0,2) Block- Yernmiganur 8 TOI TOr-Gudekal to Ganjhali_Upgarde - 5.300 3.750 Complete 12 183.60 10240 256.00 15.36 @,0,0,0, 2) ve S.Nagalapuram Block Yemmiganur Total 5.300 2 153.60 102.40 256.00 15.36 (2,0,0,0,2) District Kurnool Tota 139.300 206 3,951.81 2,634.54 6,586.35 395.22 85,4,3,2, 44) District: Nellore Page 18 of 40 Generated On : 13/01/2021 07:01 PM St. Core Name of Road / Bridge Category Network No, wwiu) 1 2 3 4 Block- Duttalur 81 TOY TO-KN63.3 KUS Road to Upgarde Guncemacakala Yerukalls Block Duttalur Total, Block: Gudur 2 TO1_—_“TOr-Kothathungapalem to Upgarde Chemica) Pathathungapalem lock Gudur Total Block: Indukurpet 83 T02_—TO2-Ravoor to Varanyanagar Upgarde (sia) Sujathanagar, Komarika,T.V \ancriga,Cangapatnam and Srinivasapuram Block Indukurpet Total Block: Kaval 8% TOY —TO1-Lakshmipuram to Urgarde Nellore district tits (@rakasam District border) via Thummalapenta, Pecapattapupalem and Nandempuram Block Kavali Total Page 19 of 40 Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter ew ay Road kins) ¢ Carriage Stage Const. |CD Work MoRD Cost | State Cost | Total Cost "Maint. Cost” Habs (1000%, Technology Bridge (ts) Way Wicth (Nos) “(Rs Lacs) (cluding (including "(Re Lacs). 300s, 250- length Additional Adctional +250, Total) State Share) state Share) (Rs Lacs) (Rs Lacs) 5 ‘ 7 e ° 10 " 2 a 4 7.673.750 Complete 8 231.60 15440 386.00 25.09 (1 ,2,2,0,5) 7627 8 231.60 154.40 386.00 25.09 (1,2,2,0, 5) 4700 3.750 Complete 13 ez 9.743 24.15 0,2,0,1,3) 4.700 8 221.62 149.74 371.36 24.45 (0,2,0,1,3) 6607 3.750 Complete 9 278018720 485.00 «30.23 @,1,4,0,7) 6647 ° 277.80 187.20 485.00 30.23 @, 1, 4,0,7) 22.960 3.750 Complete 22 56520 376.80 942.00 61.24.3,8,9,3,23) 22.960 a 565.20 376.80 942.00 61.24 (3,8,9,3, 2) Generated On : 13/01/2021 07:01 PM Sr. Core Name of Road / Bridge Category Network No. wiv) f 2 3 4 Block- Kondapuram 85 TOS TO5KM 15.1 of KKroad to Upgarde Adimurthipuram to Satyavolu at KM 29.6 of aval Kendapuram road via ‘Ganugapentapall and Lingannapatem Block Kondapuram Total Block: Manuboly 8% 104 “TORMC road to Upgarde Kurichriapads road (vi) Kmmalapud, Mudéumudt and Cherukumudt Block Manubolu Total Block: Marripady 57 TO2 TORU Road to YM Road via Upgarde Kadirinenipall and Kracarpur Block Marripadu Total Block: Nellore 88 Tor TOR NelloreTathiparthi oad to v:K road (va) ‘Amancherta, ‘Sideavarapadu, Pullatheegalapadu and andalapady Block Nellore Total Upearde Page 20 of 40 Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost ‘Technology Bridge (trs) Way Wicth (Nos) (Rs Lacs) (Including (Including Length Additional Additional State Share) State Share) (Bs Lacs) (Rs Lacs) 5 ‘ 7 6 ° 10 " 2 4000 3.750 Complete 6 152.40 102.60 255.00 4.000 ‘ 152.40 102.60 255.00 9.504 3.750 Complete 16 7.00 192.00 455,00 9.504 6 273.00 182.00 455.00 7.638 3.750 Complete 19 3875925941 647.00 7.638 8 387.59 259.41 647.00 6900 3.750 Completes 23.20 148.80 372.00 6.900 8 223.20 148.80 372.00 Generated On : 13/01/2021 07:01 PM Maint. ost Habs (1000+, (Bs Lacs) 500+, 2500, «250, Total) os “ 16.58 (1,6,1,0, 8) 16.58 (1, 6,1,0,8) 29.59 (1,2,0,0,3) 29.59 (1,2,0,0,3) 45.06 (1,5,5,1, 12) 45.06 (1.5.5.1, i) 24.18 24.18 (1,1,2,0, 4) (ME Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter J, Gay, | tameot Ra aian | easy | — Tin Road Gms 7 [carps] Bap Gin [Wo Two Gn] Sms Goa FGe esa TUN” Teeny Shag Da) ay tn Nea | tot | wanes | ene ine Scent sates Sites ar) fey Pa eas Foie | Tas escenario 20) 0) tapos} 36 | — Saat sal a one nose i Fe eck Peas Ta aso a | — seat aca} — a ie Foor 3) ‘(Tu Poaiaripwn od | Uae smo 3780 compte «3S s00 ne canes Bick Pod Ta 700 3 ¥80 aa Sok pur 3] Te eerie | Dae im) a0) conga | 3} ao) as) sn Toruanmasioas eran Blok par Tea 6380 7] art aaa Bic: Sapna a] 1 fwieimeinasean| tam Tam) 2) toepes | 0] — sec — acl ar Wows eiceaeee Block ypu Tu ‘0 1 8820 ato, sa - rage 21060 Co Generated On 1370172021 07:01 Pa ba eet tan 2 a ce ure eee tee en Maint. Cost (Re Lacs) Habs (100°, 500", 250+, +250, Totai) 8 “ 5434 (1,4,0,4,9) 5434 (1,4,0,4,9) 12.03 @,0,0,0,2) 12.03 2,0,0,0,2) 24.70 (4,1,5,3,13) 24.70 4,1,5,3, is) 30.48 (2,2,4,5, 13) 3848 @,2,4,5, i) WOM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Sr. Core Name of Road /Bridge Category New Road (Kms) /- Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost aint. Cost Habs (1000, Network No. (WU) Technology Bridge (Mrs) Way Width (Nos) (Rs Lacs) (including (RS Lacs) 500+, 250, Length Additional «250, Tota) State Share) state Share) . (Rs Lacs) (Rs Lacs) 1 2 a 4 5 6 7 i ° 10 " 2 % 4 Block: Varikuntapad 93 TOI TOT-KN21Z.4DKD Road to Upgarde Waste Plastics 12.295 4.750 Complete 14 493.80 2920.23.00 52.50 (1,3,2,0,6) Kondareddypali via ‘Andravarpall and Thurpu Boyamacusula Block Varikuntapady Total 12.295 “ 493.80 329.20 23,00 53.50 (1,3,2,0,6) District Nellore Total 2971 157 4,020.81 2,688.55 6,709.36 439.16 (20,37, 34, 17, 108) District: Prakasam Block- Bestavaripeta 94 MRLI2.—MRL13-BT road to BK road Upgarde - 7.000 3.750 Complete 24 2e9.20 19320 483.00 © 31.40 (2,0,0,0,2) via Chetticharla and Poosalapadu Block Bestavaripeta Total 7.000 24 193.20 483.00 31.40 (2, 0,0,0,2) Block: Gudlurs 95 02 TO2-Gudluruto Puretipall _Upgarde 6550 3.730 Complete 10 16380 109.20 273.00 17.78 @,2,1,0,6) va Chenchureddypalem Block Gudlury Total 6.550 10 163.80 109.20 273.00 17.76 3, 2,1,0,6) Block: Janakavarampanguluru 96 TOS TOS-Road from Ranigavaram Upgarde - 9.535 3.750 Complete 18 4260 288.40 728.00 «44.87 (3,1,0,0,4) to Panguluru Block Janakavarampanguluru Total 9.535 8 432.60 288.40 721.00 46.87 (3,1, 0,0,4) Page 22 of 40 Generated On : 13/01/2021 07:01 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Se. core | Name af oud Bridge Category New Road fms) 1 Carine Network No Wi)” Techraony. ‘Stage ts) Way Wet eet ipa : ‘ 5 ‘ 7 lock Konakanaila 97 TO) “TOFRKNa to Haga _Uparce aco 3750 Block Konskanamith Teal 13.400 Block Kethapatnam 98 TOL —"ToRand fam All and8 Upp 9am 3.79 Tondo fej ot Bick Kotapatnan Total ato Block Kare 9 TO) ToD Kurcheduto vende na 3780 anadeal via West Singer Bleck Kurc oa 2390 Aleck Maria 100 Tor TOTP rendtoON road Upatde noo 3.790 Aarpud sharapaipets Block aru Tea 8.70 Blok: Mindamaru Yor TO Toa Pimento User 970379 ‘etapa a area, Cresanapaem Blok Minar Teta om \Ve een te Page 23 of 40 ge a WOR ers Com aa sa Fe 0 ar et ne eto Stage Cons. Complete Complete complete Complete Complete (CD Work | MoRD Cost (es) 16 7 “ “ Generated On : 13/01/2021 07:01 PM (is Lacs) 10 406.20 406.20 397.20 397.20 459.00 459.00 ms.20 328.80 324.60 324.60 State Cost | Total Cost (Including (neluding Additional Adational State Share) state Share) (Rs Lacs) (RsLacs) " n 270.80 677.00 270.80 677.00 264.80 662.00 264.80 662.00 305.00 765.00 306.00 765.00 21920 $48.00 219.20 548.00 216.40 541.00 216.40 543.00 Maint. Cost | Habs (1000e, (Lacs) 500+, 250%, “230, Total) B 4 4.00 (4,1,0,2,7) 44.00 (4,1,0,2,7) 4.04 @,2,0,0,4 42.04 (2,2,0,0, 4) O23 2,0,1,0,3) 49.73 @,0,1,0,3) 35.62 (6,2,1,2, 11) 35.62 (6,2,1,2, iy 35.7 (4,2,0,0,6) 35.17 (4,2,0,0,6) Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter St. Core Name of Road / Bridge Category _ New Road (Kms) /- Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No, (NU) Technology Bridge (Mtrs). Way Wath (os) (Rs Lacs) Including (Including (RS Lacs) 500+, 250%, Length Additional Additional «250, Total) State Share) State Share) (Lacs) (RS Lacs) } 1 2 3 4 5 6 7 5 9 10 " 2 2 “4 ‘Block: Naguluppalapadu 102, TOL Tor-Road from Upgarde = 12.670 3.750 Complete 6 2420-8280 707.00 45.96 (10,200, ‘ammanabrold to 12) Pamidipadu Rand Road via ‘Chavatapalem Raparta,Mach _varam,Uppugundur,Ommey ‘ram and Kandlagunta Block Naguluppalapadu Total 12.670 ‘ 1420 12.80 e700 45.96 (10,2,0,0, Block- Ongole 103 T06—TO6-Road from Karavadi to Upgarde Waste Plastics 7.000 3.750 Complete 6 12.00 148.00 370.00 24.06 (¥,0,1,0,2) Uh a Fanaaplen Block Ongole Total 7,000 6 222.00 148.00 370.00 24.06 (1,0,1,0,2) archur 104 TOY —Tor-Road fram Upsarde > 6.030 3.750 Complete 5 192602840 321.00 2087 (1,1, 0,0,2) Ramanayapaiom to Block Parchur Total 6.030 5 192.60 128.40 321.00 20.87 (1,1, 0,0,2) Block- Ponnaluru 105 TOS —T05-Km28 Oollapalem —_Upgarde 6.850 3.750 Complete 5 219.60 146.40 «466.00 =S23.80 2,1,0,0,3) Vemulapady road to. VkK road via Muppalla Block Ponnaluru Total 6.850 5 219.60 146.40 366.00» 23.80 (2, 1,0,0,3) Page 24 of 40 Generated On : 13/01/2021 07:01 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Sr Gare | Name of Road/ Bridge Category New Road (Kms) / Carriage | Stage Const. CD Work | MoRD Cost State Cost | Total Cost Maint, Cost | Habs (1000+, Network No. (N/U)" Technology Bridge Ut) Way Wicth Nos) “(Rs Lacs) (Including (Including (RE Lacs) 500, 250%, Length Additional Additional “280, Total) State Share) State Share) (sacs) (Rs Lacs) 1 2 3 4 5 ‘ f 8 9 10 " 2 13 1“ Block: Racherta 105 MRLOY_—“MRLOT-Road from Satyavolu Upgarde : 6.110 3.750 Complete 10 252.00 168.00 420.00 «27.38 @.1,1,0,4) ‘to Racharia via Kaluvapall Block Racherla Total, 6.110 10 252.00 168.00 420.00 27.31 (2,1,1,0,4) Block: Santhamaguluri 107 T03._—_T03-Kommalapadu to Upgarde Waste Plastics 8200 3.750 Complete 25 2946019640 491.00 «31.92 (4,0,0,0, 4 Kopparam Block Santhamaguluru Tot 8.200 2s 294.60 196.40 491.00 -—*31.92 (4,0,0,0, 4) Blocks Tarlapadu 108 T02——"T02-Goruguntalapad to Upgarde 10.054 3.750 Complete 14018760 719.00 48,74 7,1,1,0,9) chennareddypallivie surepal ethagudipt,thummatacher Block Tarlapadu Total 10.054 8 43140 287.60 719.00 46.74 (7,1, 10,9) Block- Ulavapady 109 TOR TO2Karedu to Upsarde > 10.700 3.750 Complete. 13 283.20 189.20 473.00 = «30.76(1,4,2,6,13) ‘Alagayapalem via Uavapadu Block Ulavapadu Total 10.700 B 283.80 473.00 30.76 (1,4,2,6, 13) Page 25 of 40 ne Generated On : 13/01/2021 07:01 PM St. Core Name of Road / Bridge Category Network No, wiv) 1 2 E 4 Block- Veligandla 110 TOS TO3-Mogalluru Vemulapady Upgarde Rand Road to Kanigir OG Peta Rand Rose va Papayapall, Motupall, ‘Venganagunta and Pedda Gogulapal Block Veligandla Total District Prakasam Total District: Srikakulam Block: Bhamini 111 TOS TO5-A.B.Road to AB.Road —Upgarde via Bommika, Vaddans, butchimanuguda and ‘manumakoda Block Bhamini Total Block- Etcherla 112 TOS TO-Ponnaga Rand B oad Upgarde to Dibbalapalem via Bonealakaduns| Block Etcherla Total Page 26 of 40 « Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost | State Cost Total Cost Maint. Cost Habs (1000+, Technology Bridge (irs) Way Wisth (os) “(Rs Lacs) (Including (Including (Rs Lacs) $00, 250%, Length Adgitional Additional +250, Tota) State Share) State Share) (Ws Lacs) (RS Lacs) 5 6 7 8 ° 10 " 2 3 4 9.000 3.750 Complete 15 289.20 192.80 482.00 -——31.33 (0,1,0,0,1) 9.000 5 289.20 192.80 482.00 31.33 0, 1,0, 0,1) 153.209 223 5,411.40 3,607.60 9,099.00 586.34 (54,218, 10 33) 11.500 3.780 Complete 38 40807720 718.00 46.67 (0,2,2,7,11) 11.500 3 430.80 287.20 718.00 46.67 (0,2,2,7, in, Terrazyme 7.70 3.730 Complete 8 20.70 -07.30 498.002.3623, 5,6, 16) 7.700 8 290.70 207.30 498.00 «32.36 (2,3,5,6, is) 3/01/2021 07:01 PM

You might also like