• KGOC Gas & Condensate Export System Project- (QCI - Piping/Welding) (Non ARAMCO)
• JIGCC Utilities & common Area Project Package -5 (QCI Welding) (ARAMCO)
• Offshore - BRRI Five (5) Pipe Line Replacement Project. (QCI - Welding) (ARAMCO)
• Jizan Refinery Hydrocracker & Diesel Hydro treated Project EPC-11 (QCI - Welding/Piping)
(ARAMCO)
CAREER SUMMARY:
Over 6 years experience as a QCI Welding/Piping Inspection at petrochemical, oil & Gas
sector, fabrication industries in Saudi Arabi. I have a field experience in different welding
process and selection of welding consumables. Hand on experience includes but is not
limited to inspection and testing of weldment, Dimensional and including all NDT
methods. Witness welder qualification test, implementing Quality Control procedure,
Familiarize with international Codes, Standards and Specification of project as Saudi
Aramco
COMPUTER KNOWLEDGE:
Office assistants course (AUTOCAD/DOS/WINDOWS/MSWORD/MSACCESS/
MSEXCEL/MSPOWERPOINT/BASICS OF INTERNET).
CAREERHISTORY
Worked as QC Inspector:(Piping)Shutdown
Performing all QC inspection activities in accordance with the ITP, project Quality plan, procedures,
approved drawings applicable codes, standards and specifications.
Reviewed QCP, ITP,WPQ, Procedures.
Monitoring the Welder Performance Qualification as per ASME sec. IX.
Conduct internal audit of company related quality documents prior to client come.
Co-ordination with client and third party inspection agencies.
Conduct tool box meeting and solving any issues regarding the quality of work.
Reviewing procedure quality plan, Aramco standard and educate the supervisor, Forman, pipe fitters and
welders to improve the quality of works.
Welding consumable material receiving inspection.
Check the data sheet (low hydrogen electrode, filler wire), consumable certificate.
Review the procedure for storage, treatment and issue of consumables
Provide technical guideline for welding sequence to control distortion in accordance with procedure and
job requirement.
Verification of backing of electrodes & electrode issue register.
Maintain and update calibration details for welding machine, portable ovens, holding ovens & mother
oven.
Maintain the calibration of QC equipment’s
Check the validity of welder approval certificates, especially period of validity.
Verify welders repair rate weekly basis
Monitored and controlling the repair percentage of each welder
Highlight the violations against engineering standards
Witness for Repair/Modification activities
Witnessing for Back purging For Alloy and SS materials to avoid oxidations
Radiographic film interpretation and evaluation in compliance with relevant codes.
Review the PWHT & HT reports as per the procedure requirements
Witnessing pre-heating, PWHT, Post heating arrangement & chart verification.
Monitored in-process welding parameters such as ampere, voltage, travel speed and heat input as per
the WPS.
Document maintain like Material receiving, Fit-up,DWR, NDT,RFI logs etc.
Raising RFI’s for each item of work completed and at site for witness.
Prepare Proactive, Non-Conformance Report (INCR), Find out Root Cause, initiate corrective action for
every violation and out of standard of construction activities and Preventive Action
Inspecting fit up & welding as per client specification & standards and prepare daily reports
Documentation and record keeping of NDT related document
Checking and preparing As-built revision drawing of isometric drawing.
Check all isometric drawing and confirm all the isometric drawing are latest revision and issued for
construction.
Ensure that pipe supports, and guides have been installed in accordance with the piping drawing and the
pipe support details.
Material utilization as per specification and standards (pipe, fitting, bolt, gasket etc).
Inspected raw material, steel plates, pipes and tubes, flange faces Witnessed material identification,
marking and transfer of heat numbers and hard punch Inspected dimensions, plumb out, straightness,
ovality etc
Test Package preparation & Review.
Inspection of pressure test packages according to the piping class, their test limits and required pressure.
Co-ordinate with client quality engineer for final punch listing
Line check prior to hydro testing and preparation of punch listing, punch closing for piping test package
and verification as well.
Witnessing Hydro testing of Pipe system, drying & layup activities.
Witnessing for flange cold tie-in activity, prepare BT report
Reinstatement punch closing activities
PERSONAL PROFILE
Gender : Male
Marital Status : Married
Date of Birth : 04/12/1984
Nationality : Indian
Passport Details
: Passport No: M 9441631
Date of Issue : 12/10/2015
Date of Expiry : 11/10/2025
Place of Issue : Riyadh
Driving license India
: No.11/369/2004
Date of issue : 20/01/2004
Date of Expiry : 19/01/2024
Place of issue : Kozhikode
Languages Known
Declaration