Professional Documents
Culture Documents
Footing Layout
Footing Layout
6"
4" 8'-10" 11'
F 2'
6"
F3 F3
4'
4'
4'-9"
4'-9"
F2
1'-6"
5'-3" G.L. G.L.
3'-9" 3'-9"
0.2H
12'-4"
h=
12ø-4nos. 12mm
8# 4" C/C
4'
4' 4'
GROUND BEAM
z
F1
F2 F2 8ø-150mm c/c
E 5'-3"
5'-3"
12mm
6'
6'
7'
C1
0.2H
h=
4' 4'
4'
10'-6"
6" C/C
39'-4"
38'-10"
8#
H
4'
4'
D
F1
4'
F2 30" OR SHORTER SPAN,
D 5'-3" WHICHEVER IS HIGHER
6'
6'
1'-8"
0.2H
F2 2'
h=
C
5'-3"
SIDE COVER
2'
4" C/C
50 MM
26'-6"
8#
4'
4'
D
4'
d
10'
4"
1:3:6
16'
4" B 4"
4'
F2 TIE SPACING DETAIL
F2 H- HEIGHT FROM FLOOR TO BOTT. OF BEAM
F2
B
5'-3"
5'-3"
5'-3"
1'
4'-4"
4'
P1
4"
A P1 P1 P1
4"
4"
9'-2"
20'-2"
20'-6" PILE SCHEDULE
REINFORCEMENT
SIZE THICKNESS DEPTH (PILE CAP) COVER NO.OF BARS
S. NO. FOOTING
NO. PILE DIA. PILE CAP PCC T D Rx - Ry BOTH DIRECTION PILE
FOOTING SCHEDULE
S.
NO.
FOOTING
NO. RCC
SIZE
PCC D
DEPTH
d
REINFORCEMENT
Rx - Ry FOOTING
1 F1 4'0"X6'0" 4'8"X6'8" 24" 12" 12 @ 6" C/C
2
3
F2
F3
4'X5'3"
3'9"X4'9"
4'8"X5'11"
4'5"X5'5"
24"
22"
12"
12"
12 @ 6" C/C
12 @ 6" C/C
LAYOUT