Professional Documents
Culture Documents
Tanpa Judul
Tanpa Judul
Tanpa Judul
-
TAS
DATA ARUS LALU LINTAS PADA JAM SIBUK DATA
Q entry 1846
RUAS I Q exit
(Ruas)
(Ruas)
U
Q exit 1846
Q entry
(Simpang)
(Simpang)
32 281 471
821 1094 Exit Entry
821 367
B T RUAS III
422
RUAS IV 111
1184
518 1184
411 Exit
412 292 555 Entry
S
Q entry
1115 RUAS II (Ruas)
HASIL ANALISA SURVEY LALU LINTAS
KODE ARAH JENIS KENDARAAN JUMLAH
ARAH/ KENDARAAN Ringan Berat SEPEDA MOTOR TAK BERMOTOR KEND./
RUAS ( LV ) ( HV ) ( MC ) ( UM ) JAM
Belok Kiri 109 1 360 1 471
U/I Lurus 571 3 518 2 1094
Belok Kanan 133 1 147 0 281
Jumlah 813 5 1025 3 1846
Belok Kiri 141 0 271 0 412
S / II Lurus 125 0 286 0 411
Belok Kanan 75 0 217 0 292
Jumlah 341 0 774 0 1115
Belok Kiri 180 1 373 1 555
T / II Lurus 180 1 332 5 518
Belok Kanan 1 1 107 2 111
Jumlah 361 3 812 8 1184
Belok Kiri 6 0 26 0 32
B / IV Lurus 188 2 177 0 367
B / IV
Belok Kanan 134 0 288 0 422
Jumlah 328 2 491 0 821
ANALISA ARUS LALU LINTAS PADA RUAS JALAN
813
Q exit : LV = x 100 % = 44.04 %
1846
5
HV = x 100 % = 0.27 %
1846
100 %
1025
MC = x 100 % = 55.53 %
1846
3
UM = x 100 % = 0.16 %
UM = x 100 % = 0.16 %
1846
Q entry : 630
LV = x 100 % = 37.52 %
1679
2
HV = x 100 % = 0.12 %
1679
100 %
1026
MC = x 100 % = 61.11 %
1679
21
UM = x 100 % = 1.25 %
1679
F. Volume Actual
Rumus :
QP = QV x P
Dimana :
QP = Jumlah lalu lintas pada jam sibuk dalam interval waktu tertentu
QV = Jumlah lalu lintas yang lewat dalam interval waktu tertentu
P = Faktor equivalent arus lalu lintas yang lewat
1166.60
SP entry = x 100 = 46.634 %
2501.60
SP total = 50 / 50
H. Kapasitas Jalan ( C )
Rumus : C = Co x Fw x Fks x Fsf x Fsp x Fcs
Dimana :
- Kapasitas Dasar (Co) (Lihat Tabel 3-3)
Untuk Ruas I arah Utara type 4/2 Co = 5700 smp/jam
- Faktor Penyesuaian Lebar Efektif Jalan (Fw) (Lihat Tabel 3-5)
Untuk Lebar Jalan 14.00 m type 4/2 Fw = 1.00
- Faktor Penyesuaian Lebar Efektif Bahu Jalan (Fks) (Lihat Tabel 3-7)
Untuk Ruas I arah Utara Lebar Bahu = 1,50 Fks = 1.04
- Untuk Faktor Penyesuaian Gesekan Samping (Fsf) (Lihat Tabel 3-8 / 3-14)
Untuk semua ruas gesekan samping sedang Fsf = 0.85
- Untuk Faktor Penyesuaian Distribusi Arah (Fsp) (Lihat Tabel 3-10)
Utara type 4/2 SP = 50 / 50 Fsp = 1.00
- Untuk Faktor Ukuran Kota (Fcs) (Lihat Tabel 3-16)
Ukuran Kota Penduduk = 1,0 - 3,0 Juta Jiwa Fcs = 1,00
3600
Ti = = 72.11 det/km
49.92
2. Traffic Composition
44.04
LV = = 0.44
100
0.27
HV = = 0.003
100
55.53
MC = = 0.555
100
0.16
UM = = 0.002
100
3. Traffic Flow
- LT (Kiri)
LT x LV = 471 x 0.44 = ### kendaraan/jam
LT x HV = 471 x 0.003 = 1.3 kendaraan/jam
LT x MC = 471 x 0.555 = 261.5 kendaraan/jam
LT x UM = 471 x 0.002 = 0.8 kendaraan/jam
- ST (Lurus)
ST x LV = 1094 x 0.44 = 481.8 kendaraan/jam
ST x HV = 1094 x 0.003 = 3.0 kendaraan/jam
ST x MC = 1094 x 0.555 = 607.4 kendaraan/jam
ST x UM = 1094 x 0.002 = 1.8 kendaraan/jam
- RT (Kanan)
RT x LV = 281 x 0.44 = 123.8 kendaraan/jam
RT x HV = 281 x 0.003 = 0.8 kendaraan/jam
RT x MC = 281 x 0.555 = 156.0 kendaraan/jam
RT x UM = 281 x 0.002 = 0.5 kendaraan/jam
4. Profected
Pcv . LV = 1.3 Pcv . MC = 0.2
Pcv . HV = 1.0 Pcv . UM = 0.5
5. Opcesed
Pcv . LV = 1.3 Pcv . MC = 0.4
Pcv . HV = 1.0 Pcv . UM = 1.0
341
Q exit : LV = x 100 % = 30.58 %
1115
0
HV = x 100 % = 0.00 %
1115
100 %
774
MC = x 100 % = 69.42 %
1115
0
UM = x 100 % = 0.00 %
UM = x 100 % = 0.00 %
1115
Q entry : 294
LV = x 100 % = 23.67 %
1242
20
HV = x 100 % = 1.61 %
1242
100 %
779
MC = x 100 % = 62.72 %
1242
149
UM = x 100 % = 12.00 %
1242
F. Volume Actual F.
Rumus :
QP = QV x P
Dimana :
QP = Jumlah lalu lintas pada jam sibuk dalam interval waktu tertentu
QV = Jumlah lalu lintas yang lewat dalam interval waktu tertentu
P = Faktor equivalent arus lalu lintas yang lewat
858.50
SP entry = x 100 = 54.113 %
1586.50
SP total = 60 / 40
H. Kapasitas Jalan ( C ) H.
Rumus : C = Co x Fw x Fks x Fsf x Fsp x Fcs
Dimana :
- Kapasitas Dasar (Co) (Lihat Tabel 3-3)
Untuk Ruas II arah Selatan type 4/2 Co = 5700 smp/jam
- Faktor Penyesuaian Lebar Efektif Jalan (Fw) (Lihat Tabel 3-5)
Untuk Lebar Jalan 14.00 m type 4/2 Fw = 1.00
- Faktor Penyesuaian Lebar Efektif Bahu Jalan (Fks) (Lihat Tabel 3-7)
Untuk Ruas II arah Selatan Lebar Bahu = 1,50 Fks = 1.04
- Untuk Faktor Penyesuaian Gesekan Samping (Fsf) (Lihat Tabel 3-8 / 3-14)
Untuk semua ruas gesekan samping sedang Fsf = 0.85
- Untuk Faktor Penyesuaian Distribusi Arah (Fsp) (Lihat Tabel 3-10)
Selatan type 4/2 SP = 60 / 40 Fsp = 0.97
- Untuk Faktor Ukuran Kota (Fcs) (Lihat Tabel 3-16)
Ukuran Kota Penduduk = 1,0 - 3,0 Juta Jiwa Fcs = 1,00
3600
Ti = = 67.67 det/km
53.20
2. Traffic Composition
30.58
LV = = 0.306
100
0.00
HV = = 0
100
69.42
MC = = 0.694
100
0.00
UM = = 0
100
3. Traffic Flow
- LT (Kiri)
LT x LV = 412 x 0.306 = 126.00 kendaraan/jam
LT x HV = 412 x 0 = 0.0 kendaraan/jam
LT x MC = 412 x 0.694 = 286.0 kendaraan/jam
LT x UM = 412 x 0 = 0.0 kendaraan/jam
- ST (Lurus)
ST x LV = 411 x 0.306 = 125.7 kendaraan/jam
ST x HV = 411 x 0 = 0.0 kendaraan/jam
ST x MC = 411 x 0.694 = 285.3 kendaraan/jam
ST x UM = 411 x 0 = 0.0 kendaraan/jam
- RT (Kanan)
RT x LV = 292 x 0.306 = 89.3 kendaraan/jam
RT x HV = 292 x 0 = 0.0 kendaraan/jam
RT x MC = 292 x 0.694 = 202.7 kendaraan/jam
RT x UM = 292 x 0 = 0.0 kendaraan/jam
4. Profected
Pcv . LV = 1.3 Pcv . MC = 0.2
Pcv . HV = 1.0 Pcv . UM = 0.5
5. Opcesed
Pcv . LV = 1.3 Pcv . MC = 0.4
Pcv . HV = 1.0 Pcv . UM = 1.0
361
Q exit : LV = x 100 % = 30.49 %
1184
3
HV = x 100 % = 0.25 %
1184
100 %
812
MC = x 100 % = 68.58 %
1184
8
UM = x 100 % = 0.68 %
UM = x 100 % = 0.68 %
1184
Q entry : 274
LV = x 100 % = 26.07 %
1051
18
HV = x 100 % = 1.71 %
1051
100 %
565
MC = x 100 % = 53.76 %
1051
194
UM = x 100 % = 18.46 %
1051
Volume Actual F.
Rumus :
QP = QV x P
Dimana :
QP = Jumlah lalu lintas pada jam sibuk dalam interval waktu tertentu
QV = Jumlah lalu lintas yang lewat dalam interval waktu tertentu
P = Faktor equivalent arus lalu lintas yang lewat
773.90
SP entry = x 100 = 49.839 %
1552.80
SP total = 60 / 40
Kapasitas Jalan ( C ) H.
Rumus : C = Co x Fw x Fks x Fsf x Fsp x Fcs
Dimana :
- Kapasitas Dasar (Co) (Lihat Tabel 3-3)
Untuk Ruas III arah Timur type 2/2 Co = 2900 smp/jam
- Faktor Penyesuaian Lebar Efektif Jalan (Fw) (Lihat Tabel 3-5)
Untuk Lebar Jalan 7.00 m type 2/2 Fw = 1.00
- Faktor Penyesuaian Lebar Efektif Bahu Jalan (Fks) (Lihat Tabel 3-7)
Untuk Ruas III arah Timur Lebar Bahu = 1,00 Fks = 0.93
- Untuk Faktor Penyesuaian Gesekan Samping (Fsf) (Lihat Tabel 3-8 / 3-14)
Untuk semua ruas gesekan samping sedang Fsf = 0.85
- Untuk Faktor Penyesuaian Distribusi Arah (Fsp) (Lihat Tabel 3-10)
Timur type 2 / 2 SP = 60 / 40 Fsp = 0.94
- Untuk Faktor Ukuran Kota (Fcs) (Lihat Tabel 3-16)
Ukuran Kota Penduduk = 1,0 - 3,0 Juta Jiwa Fcs = 1,00
3600
Ti = = 110.83 det/km
32.48
2. Traffic Composition
30.49
LV = = 0.305
100
0.25
HV = = 0.003
100
68.58
MC = = 0.686
100
0.68
UM = = 0.007
100
3. Traffic Flow
- LT (Kiri)
LT x LV = 555 x 0.305 = 169.22 kendaraan/jam
LT x HV = 555 x 0.003 = 1.4 kendaraan/jam
LT x MC = 555 x 0.686 = 380.6 kendaraan/jam
LT x UM = 555 x 0.007 = 3.8 kendaraan/jam
- ST (Lurus)
ST x LV = 518 x 0.305 = 157.9 kendaraan/jam
ST x HV = 518 x 0.003 = 1.3 kendaraan/jam
ST x MC = 518 x 0.686 = 355.3 kendaraan/jam
ST x UM = 518 x 0.007 = 3.5 kendaraan/jam
- RT (Kanan)
RT x LV = 111 x 0.305 = 33.8 kendaraan/jam
RT x HV = 111 x 0.003 = 0.3 kendaraan/jam
RT x MC = 111 x 0.686 = 76.1 kendaraan/jam
RT x UM = 111 x 0.007 = 0.8 kendaraan/jam
4. Profected
Pcv . LV = 1.3 Pcv . MC = 0.2
Pcv . HV = 1.0 Pcv . UM = 0.5
5. Opcesed
Pcv . LV = 1.3 Pcv . MC = 0.4
Pcv . HV = 1.0 Pcv . UM = 1.0
328
Q exit : LV = x 100 % = 39.95 %
821
2
HV = x 100 % = 0.24 %
821
100 %
491
MC = x 100 % = 59.81 %
821
0
UM = x 100 % = 0.00 %
UM = x 100 % = 0.00 %
821
Q entry : 289
LV = x 100 % = 24.31 %
1189
27
HV = x 100 % = 2.27 %
1189
100 %
691
MC = x 100 % = 58.12 %
1189
182
UM = x 100 % = 15.31 %
1189
Volume Actual
Rumus :
QP = QV x P
Dimana :
QP = Jumlah lalu lintas pada jam sibuk dalam interval waktu tertentu
QV = Jumlah lalu lintas yang lewat dalam interval waktu tertentu
P = Faktor equivalent arus lalu lintas yang lewat
851.60
SP entry = x 100 = 59.648 %
1427.70
SP total = 50 / 50
Kapasitas Jalan ( C )
Rumus : C = Co x Fw x Fks x Fsf x Fsp x Fcs
Dimana :
- Kapasitas Dasar (Co) (Lihat Tabel 3-3)
Untuk Ruas IV arah Barat type 2/2 Co = 2900 smp/jam
- Faktor Penyesuaian Lebar Efektif Jalan (Fw) (Lihat Tabel 3-5)
Untuk Lebar Jalan 7.00 m type 2/2 Fw = 1.00
- Faktor Penyesuaian Lebar Efektif Bahu Jalan (Fks) (Lihat Tabel 3-7)
Untuk Ruas IV arah Barat Lebar Bahu = 1,00 Fks = 0.93
- Untuk Faktor Penyesuaian Gesekan Samping (Fsf) (Lihat Tabel 3-8 / 3-14)
Untuk semua ruas gesekan samping sedang Fsf = 0.85
- Untuk Faktor Penyesuaian Distribusi Arah (Fsp) (Lihat Tabel 3-10)
Barat type 2/2 SP = 50 / 50 Fsp = 1.00
- Untuk Faktor Ukuran Kota (Fcs) (Lihat Tabel 3-16)
Ukuran Kota Penduduk = 1,0 - 3,0 Juta Jiwa Fcs = 1,00
3600
Ti = = 104.95 det/km
34.30
2. Traffic Composition
39.95
LV = = 0.4
100
0.24
HV = = 0.002
100
59.81
MC = = 0.598
100
0.00
UM = = 0
100
3. Traffic Flow
- LT (Kiri)
LT x LV = 32 x 0.4 = 12.78 kendaraan/jam
LT x HV = 32 x 0.002 = 0.1 kendaraan/jam
LT x MC = 32 x 0.598 = 19.1 kendaraan/jam
LT x UM = 32 x 0 = 0.0 kendaraan/jam
- ST (Lurus)
ST x LV = 367 x 0.4 = 146.6 kendaraan/jam
ST x HV = 367 x 0.002 = 0.9 kendaraan/jam
ST x MC = 367 x 0.598 = 219.5 kendaraan/jam
ST x UM = 367 x 0 = 0.0 kendaraan/jam
- RT (Kanan)
RT x LV = 422 x 0.4 = 168.6 kendaraan/jam
RT x HV = 422 x 0.002 = 1.0 kendaraan/jam
RT x MC = 422 x 0.598 = 252.4 kendaraan/jam
RT x UM = 422 x 0 = 0.0 kendaraan/jam
4. Profected
Pcv . LV = 1.3 Pcv . MC = 0.2
Pcv . HV = 1.0 Pcv . UM = 0.5
5. Opcesed
Pcv . LV = 1.3 Pcv . MC = 0.4
Pcv . HV = 1.0 Pcv . UM = 1.0
A.Bebas
LV = 1.0 MC = 0.2
HV = 1.3 UM = 0.5
1. Arah Utara
Kiri = ### x 1.0 + 1.3 x 1.3 + 261.5 x 0.2 + 0.8 x 0.5 = 261.78
Lurus = 481.8 x 1.0 + 3.0 x 1.3 + 607.4 x 0.2 + 1.8 x 0.5 = 608.0
Kanan = ### x 1.0 + 0.8 x 1.3 + 156.0 x 0.2 + 0.5 x 0.5 = 156.18
+
= 1026
2. Arah Selatan
Kiri = ### x 1.0 + 0.0 x 1.3 + 286.0 x 0.2 + 0.0 x 0.5 = 183.20
Lurus = 125.7 x 1.0 + 0.0 x 1.3 + 285.3 x 0.2 + 0.0 x 0.5 = 182.8
Kanan = 89.30 x 1.0 + 0.0 x 1.3 + 202.7 x 0.2 + 0.0 x 0.5 = 129.84
+
= 496
3. Arah Timur
Kiri = ### x 1.0 + 1.4 x 1.3 + 380.6 x 0.2 + 3.8 x 0.5 = 249.05
Lurus = 157.9 x 1.0 + 1.3 x 1.3 + 355.3 x 0.2 + 3.5 x 0.5 = 232.4
Kanan = 33.84 x 1.0 + 0.3 x 1.3 + 76.1 x 0.2 + 0.8 x 0.5 = 49.81
+
= 531
4. Arah Barat
Kiri = 12.78 x 1.0 + 0.1 x 1.3 + 19.1 x 0.2 + 0.0 x 0.5 = 16.71
Lurus = 146.6 x 1.0 + 0.9 x 1.3 + 219.5 x 0.2 + 0.0 x 0.5 = 191.7
Kanan = ### x 1.0 + 1.0 x 1.3 + 252.4 x 0.2 + 0.0 x 0.5 = 220.41
+
= 429
B.Terhalang
LV = 1.0 MC = 0.4
HV = 1.3 UM = 1.0
1. Arah Utara
Kiri = ### x 1.0 + 1.3 x 1.3 + 261.5 x 0.4 + 0.8 x 1.0 = 314.47
Lurus = 481.8 x 1.0 + 3.0 x 1.3 + 607.4 x 0.4 + 1.8 x 1.0 = 730.4
Kanan = ### x 1.0 + 0.8 x 1.3 + 156.0 x 0.4 + 0.5 x 1.0 = 187.6
+
= 1233
2. Arah Selatan
Kiri = ### x 1.0 + 0.0 x 1.3 + 286.0 x 0.4 + 0.0 x 1.0 = 240.4
Lurus = 125.7 x 1.0 + 0.0 x 1.3 + 285.3 x 0.4 + 0.0 x 1.0 = 239.8
Kanan = 89.30 x 1.0 + 0.0 x 1.3 + 202.7 x 0.4 + 0.0 x 1.0 = 170.4
+
= 651
3. Arah Timur
Kiri = ### x 1.0 + 1.4 x 1.3 + 380.6 x 0.4 + 3.8 x 1.0 = 327.0
Lurus = 157.9 x 1.0 + 1.3 x 1.3 + 355.3 x 0.4 + 3.5 x 1.0 = 305.2
Kanan = 33.84 x 1.0 + 0.3 x 1.3 + 76.1 x 0.4 + 0.8 x 1.0 = 65.4
+
= 698
4. Arah Barat
Kiri = 12.78 x 1.0 + 0.1 x 1.3 + 19.1 x 0.4 + 0.0 x 1.0 = 20.5
Lurus = 146.6 x 1.0 + 0.9 x 1.3 + 219.5 x 0.4 + 0.0 x 1.0 = 235.6
Kanan = ### x 1.0 + 1.0 x 1.3 + 252.4 x 0.4 + 0.0 x 1.0 = 270.9
+
= 527
VOLUME Q
Arah Bebas (P) Terhalang (O)
Utara 1026 1233
Selatan 496 651
Timur 531 698
Barat 429 527
14.00 m
U
7m
Q entry
Q exit 1026
5.5 m
Wentry Q exit
Q entry
429 3.5
2.8 m Wentry
7 m
B T
Wentry 2.8 m
3.5 m 531
Q exit Q entry
Wentry
5.5 m
Q exit
496 Q exit
Q entry
7m
dimana : So = 600 x We
1.5 x 9 + 5 21
Jadi : C = = = 262.25 = 262 detik
1 - 0.92 0.08
V. Green Time ( g )
FR critis
Rumus : g = C - LT x
∑FR
0.47
g = 262 - 9 x = 129 = 129 detik
0.92
0.45
g = 262 - 9 x = 124 = 124 detik
0.92
VI. Kapasitas Pada Persimpangan ( c )
g
Rumus : C = S
c
262detik
262detik
TABEL 3-3 : KAPASITAS DASAR JALAN (Co)
Tipe Jalan 2/2 4/2 1-3 / 1
Co 2900 5700 3200
TABEL 3-8 : FAKTOR PENYESUAIAN JARAK KERB DAN GANG. SAMPING (Fks)
Lebar Efektif Jalan 0.00 0.50 1.00 1.50 2.00
2/2 0.85 0.86 0.88 0.89 0.90
Fks 4/2 0.96 0.97 0.98 0.99 1.00
1-3 / 1 0.94 0.96 0.97 0.99 1.00
TABEL 3-9 : FAKTOR PENYESUAIAN PEMISAH JALUR (Fsp) JIKA ADA MEDIAN
Type / Jenis Median F sp
Tidak Terputus 1.12
Sedikit Terputus 1.05
Sering Terputus 0.98
TABEL 3-10 : FAKTOR PENYESUAIAN DISTRIBUSI ARAH (Fsp) JIKA TANPA ADA MEDIAN
Lebar Efektif Jalan 50/50 60/40 70/30 80/20 90/10 100/0
2/2 1.00 0.94 0.88 0.82 0.76 0.70
Fw
4/2 1.00 0.97 0.94 0.91 0.89 0.85
TABEL 3-11 : JUMLAH GESEKAN SAMPING (Fst)
Sangat Jumlah Gesekan Samping Sangat
Faktor-faktor Gesekan
Rendah Rendah Sedang Tinggi Tinggi
Pejalan kaki sedang berjalan 0 0 - 80 80 - 120 120 - 220 220