GOVERNMENT OF ANDHRA PRADESH

ABSTRACT
Water Resources Department -B.R.R Vamsadhara Project Phase II of Stage II- Package
88 - Investigation, design, estimation and excavation of flood flow canal from Km
14.205/13.447 to Km 34.100/33.704 including construction of CM&CD works and
formation of balancing reservoir at Parapuram in Kothuru (M) of Srikakulam (D) -
Carrying out controlled blasting from Km. 18.387 to Km. 18.500 and from Km. 18.750 to
Km19.000 for an amount of Rs.1,29,97,250/- Sanctioned- Orders – Issued.
WATER RESOURCES (Proj.I) DEPARTMENT

G.O.RT.No. 274 Dated: 02-08-2021.


Read:-
From the Chief Engineer, North Coast, Visakhapatnam, Lr.No.CE/NC/VSP
/DEE1/ AEE9/Pack.88/Vol.23/106Govt Dt:02.09.2020 and 06.03.2021.
*******
ORDER:

In the reference read above, the Chief Engineer, North Coast while explaining
the circumstances requested the Government to issue necessary permission to the
present agency i.e., M/s Sri Sai Lakshmi Constructions & Co, Vijayawada for
carrying out controlled blasting in the paid but left over reaches from Km. 18.387 to
Km.18.500 and from Km.18.750 to Km.19.00 in the FFC along with financial
implication of Rs. 1,29,97,250/- at the earliest so as to complete the balance work.

2. Government after careful examination, hereby permit the Chief Engineer,


North Coast to permit the present agency i.e., M/s Sri Sai Lakshmi Constructions &
Co, Vijayawada for carrying out controlled blasting in the paid but left over reaches
from Km. 18.387 to Km.18.500 and from Km.18.750 to Km.19.00 in the FFC along
with financial implication of Rs. 1,29,97,250/-(One Crore Twenty Nine Lakhs and
Ninety Seven Thousand Two Hundred and Fifty only)

3. The Chief Engineer, North Coast shall take necessary action to recover the
amount Rs.3.19 Cr. from the earlier agency i.e., M/s SCL Infratech Ltd either from the
other projects or through other legal measures.

4. This order issue with the concurrence of the Finance (FMU.WR.II)


Department, vide their FIN-48022/401/2017-SO(FMU(WRD II))-FIN Computer
No:296585,Dated:12/07/2021.

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)

Syamala Rao Jamjam


Secretary To Government
To
The Chief Engineer, North Coast, Visakhapatnam,
Copy To:
The Accountant General, A.P, Hyderabad
The Pay & Accounts Office, A.P, Ibrahimpatnam, Vijayawada
The Director of Works & Accounts, Vijayawada
Finance (FMU-WR II) Department
ICD01-MJIR0IC25/10/2021-PROJECTS-I (Computer No. 1356985)
SF/SC

//FORWARDED::BYORDER//

SECTION OFFICER