Doc #: PIB-004_F-01_MOP

Document type Template


METHOD OF PROCEDURE (MOP) Version: 2

Issue Date 25th Oct 2018

MOP # Prepared By Approved By Date


MOP Information Furqan Akram Adnan Ali 12-04-2019

MOP Title Shifting of Farid Town MX240


Reason / Purpose To shift the Farid Town Mx-240 router from ground floor to common NMS hall within Farid Town TP exchange
of Deployment

POC Details
Name Designation Department Supervisor
Adeel Ashfaq Manager MMBB Core Adnan Ali

Stakeholders Info

☐ Planning ☒ Operations ☐ Projects

☐ Others

Root Cause Analysis


Shifting of Farid Town MX240 Define & Shifting of Farid Town MX240
Identified Gap Measure Gap
To shift the Farid Town Mx-240 router from ground floor to common NMS hall within Farid Town TP exchange
Determine the
Solution

Solution Implementation
Resolution All stakeholders IBM and PTCL Ops team is on-board. Planned is discussed and all teams are aligned for successful completion of this activity.
Statement / High
level information
Impact (Detailed Node will go down completely. Impact duration is 4 hrs. All HIS, VOD and NMS services working from Farid Town metro will face outage.
impact elaboration)

Risks (Issue / Services Node will go down completely. Impact duration is 4 hrs. All HIS, VOD and NMS services working from Farid Town metro will face outage.
that may get
impacted)

Page 1 / 2
This document is confidential and is the Property of PTCL
It is strictly forbidden to hand it to external parties under any circumstances without prior written authorization of Management.
Doc #: PIB-004_F-01_MOP
Document type Template
METHOD OF PROCEDURE (MOP) Version: 2

Issue Date 25th Oct 2018

Activity Participants  Abrar


 Adeel Ashfaq
Activity Duration 4 Hrs Constraint (If any) NIL

Tasks Before Activity/Pre check/Prerequisite

# Action Duration Status


To shift the Farid Town Mx-240 router from ground floor to common NMS hall within Farid Town TP exchange

Procedure/Plan Activity
# Action Impact/Risk Duration Status
To shift the Farid Town Mx-240 router from ground floor to common NMS hall within Complete
Farid Town TP exchange
To shift the Farid Town Mx-240 router from ground floor to common NMS hall within Complete 4h
Farid Town TP exchange

Verification

Success Criteria Check Health of Box. Monitor traffic on all interfaces.


Roll Back Plan
Database Update
Vendor System <Please make sure that special system rights given to Vendor for deployment has been revoked once activity is completed and verified>
Access rights
Verified By Date
Services Verification
Adeel 13-04-2019

Page 2 / 2