Plastering To 2nd Floor: T D S Unit Description T D S Unit Description
Plastering To 2nd Floor: T D S Unit Description T D S Unit Description
3 10.99 P=4.61+3.19*2=10.99m
2.8 H=2.8m
92.32 m2
b/n Axis 6''& 7, G-H
1 7.80 P=4.61+3.19=7.8m
2.8 H=2.8m
21.84 m2
DD of Openining
-4 2.4 D-03 (240*80)
0.8
-7.68 m2
b/n Axis 5'& 6', D-G
3 10.83 P=4.61+3.11*2=10.83m
2.8 H=2.8m
90.97 m2
DD of Openining
-3 2.4 D-03 (240*80)
0.8
-5.76 m2
Along Axis I, 2-6
4 18.24 L=4.61m
2.8 H=2.8m
204.29 m2
DD of Openining
-4 2 W-01(150*200)
1.5
-12.00 m2
Along Axis 6'',A-H (Corridor)
1 28.66 L=28.66m
2.8 H=2.8m
80.25 m2
Along Axis 6',D-G (Corridor)
1 14.43 L=14.43m
2.8 H=2.8m
40.40 m2
DD of Openining
-8 2.4 D-03 (240*80)
0.8
-15.36 m 2
DD of Openining
-3 2.4 W-04(240*60)
0.6
-4.32 m2
-1 2.4 W-05(240*321)
3.21
-7.70 m2
Along Axis B-D (Toilet Partition)
5 3.82 L=1.76+0.2+0.15+0.1+1.61=3.82m
2.1 H=2.1m
40.11 m2
1 3.74 L=1.76+0.16+0.15+0.06+1.61=3.74m
2.1 H=2.1m
7.85 m2
1 3.62 L=1.76*2+0.1=3.62m
2.1 H=2.1m
7.60 m2
1 3.94 L=1.76+0.26+0.15+0.16+1.61=3.94m
2.1 H=2.1m
8.27 m2
1 4.02 L=1.76+0.3+0.15+0.2+1.61=4.02m
2.1 H=2.1m
8.44 m2
Along Axis 7B
1 0.35 P=0.1*2+0.15=0.35m
2.1 H=2.1m
0.74 m2
Along Axis 6'' B-D
1 9.12 L=9.42-0.15*2=9.12m
2.8 H=2.8m
25.54 m2
DD of Openining
-1 2.4 D-03 (240*80)
0.8
-1.92 m2
Along Axis B', b/n 6''&7
1 4.81 L=1.68+0.8+0.15+0.65+1.58=4.81m
2.1 H=2.1m
10.10 m2
Along Axis C' b/n 6''&7
1 4.71 L=1.68+0.75+0.15+0.6+1.58=4.71m
2.1 H=2.1m
9.89 m2