Safe Work Method Statement: Gypsum Partition/ Column Framing, Cladding& Paneling/Pop Punning
Safe Work Method Statement: Gypsum Partition/ Column Framing, Cladding& Paneling/Pop Punning
Safe Work Method Statement: Gypsum Partition/ Column Framing, Cladding& Paneling/Pop Punning
Address: Vosakhapatinam
Company Name: Disha Interiors Pvt Ltd. Activity/Trade: GYPSUM PARTITION/ COLUMN FRAMING, Cladding&
PANELING/POP PUNNING
Address: jafarkhanpet Chennai. Office Contact No: 044-43523394.
Project manager : Mr. Asaithambi Contact No: 9176631102
Person who
Procedure (in steps) Possible Hazards Risk Control Measures
will ensure
(Break the job down into steps. (Identify the hazards associated with each Rating (Describe what action or procedure will be taken to eliminate or
minimise the risk of injury or damage. Use the Hierarchy of this
Each step should accomplish some step. Examine each to find possibilities that (See
Controls below as a guide happens
major task and be in logical could lead to an accident or potential harm below)
sequence.) arising.) 1. Eliminate the Hazard
2. Substitute the material or equipment
3. Isolate the hazard
4. Implement Engineering control
5. Implement Administrative control
6. PPE
Hse and site
engg
MAIN ACTIVITY: Ensure permit to work system.
Gypsum board partition: Slip, trip H Trained workers to be engaged for this activity,
Ensure proper PPE’s(helmet, goggles, nose mask, jacket, hand glove,
Shifting the material (pop cements & pop safety belt, safety shoe)
board) from stored area to working area Ensure the proper training and toolbox talk prior start job.
and placing. Barricade the work area, storage and display the signage’s
Material does not adequate side clearance for Ensure that the hand / fingers do not get jammed in between material and
lifting. floor by carrying material with hands inside the maximum width of the item
carried.
Use the material trolley where ever possible
Drilling and cutting noise during operations. Wear designated hearing protection based on known or potential noise
levels by using ear plugs
Dust formation by drilling. Wear dust masks and eye protection prior to start of job.
Overhead obstructions. Hand arm, leg and Identify other high level obstructions prior to entering approved A type
head cuts Cut / wound due to sharp edges ladder.
Use of cut/abrasive resistant gloves, safety shoes, hat and tools.
Wear long sleeved shirt and long trousers.
Polish the sharp edges during fabrication.
Wear hand gloves; pad up the sharp edged materials with care.
Cut injury due to rotating wheel. Use cut resistant(dotted hand gloves)
Dust inhalation and entry to eye. Wear nose mask & ear plug.
Noise due to friction
Construction of frame work, Gyb board Fall from the height & fall of materials Only approved A type ladder, to be used for height works.
work and punning from ground level to H Inspect ladder prior to use – make sure is in sound condition, clean and Hse and site
ceiling levels using approved A type . undamaged. engg
Secure ladder to structure before climbing onto steps
Have another person near the ladder supervising the area to support the
ladder
Use dust mask, goggles, rubber hand gloves, full clothing and gumboot.
Mixing & applying of POP The working tools like trowel, shovel should be checked for loose grips
Skin / eye irritation due to splash over the before starting.
POP
Use correct posture while working and ensure adequate breaks are taken.
Preparation of surface Muscle strain due to improper working
posture
Use gloves. Check the grip of the hamper.
Hse and site
Hand injury while smashing Wear mask. engg
Dust particles entering the eye Clear the pop waste regularly.
Slipping on floor due to spillage of water on Unwanted spillage to be removed immediately and use required amount
floor. of water for the work
Entry to the eye and dust inhalation. Mask and goggles to be used.
Application of Plaster of Paris to the wall. Back injury while reaching for material and H Apply the material in small quantity. Hse and site
while application to the wall’ engg
Fall from height and injury to legs and injuring Barricade the work area by caution tape and warning signage to be
the person working below ensured
Inhaling of POP dust Ensure the worker is guided on the effects of POP dust.
Burn Injury to the hand in contact with the Ensure the person is wearing full sleeves and long pants with glove.
POP.
Slipping on floor due to spillage of water on Unwanted spillage to be mopped immediately and use required amount of
floor. water for the work.
Advisable to use PVC sheet at work area to facilitate better housekeeping
House Keeping / Clean area. Dust Inhalation and entry to eyes Use mechanical cleaning machine to avoid sweeping. Hse and site
M Pour the water drops to wet the surface. engg
Use of dust mask,
DESCRIPTION OF TRAINING THAT HAS BEEN GIVEN TO PEOPLE INVOLVED WITH THE WORK
WORK ACTIVITY TRAINING: Scaffold safety, Working at height, Manual handling & Operation of power tools
TICKETS, PERMITS or LICENCES REQUIRED to undertake this work (ie. Certificates of Competency, Confined Spaces etc):
BOCW ACT 1996 & RULES 1998, TAMILNADU BUILDING AND OTHER CONSTRUCTION WORKERS (REGULATION OF EMPLOYMENT AND CONDITIONS OF
SERVICE) RULES 2006.
Serial Plant/Equipment Contractor WorkCover Plant Hazards Maintenance/service records and log books sighted
Registration No identified and by Principle Contractor prior to equipment being
(if applicable) controlled within used on site?
SWMS?
Yes No Sign Date
1
2
ELECTRICAL EQUIPMENT USED DURING THE WORKS (Attach Electrical Equipment Register if applicable):
Item Tag/Item Testers Name & Signature License Number Test Date Result Test Date Result
Number
Cutting machine ____ /____ /____ ____ /____ /____
Drilling /
Hammering ____ /____ /____ ____ /____ /____
machine
HAZARDOUS SUBSTANCES or DANGEROUS GOODS USED IN THE WORKS and anticipated volumes (Attach MSDS if applicable):
MSDS
Purpose Location & Volume Used Controls
Date on Site Date Left Site Product Name MSDS Date Attached
(ie. Application on site) on Site (& PPE to be worn)
(Y/N)
/ / / / Cement / /
/ / / / / /
N.B. - All workers must be trained in the safe use of all chemicals and provided with the PPE required when using and storing these chemicals. Disposal is to be as per the waste disposal methods
in the MSDS. Spillage and leaks are to be cleaned up as per the spill/leak procedures identified in the MSDS.
We agree that we have been consulted in the hazards and control measures and agree to complete the work in accordance with our Safe Work
Method Statement (SWMS).
We have been provided with training in all tasks outlined in our SWMS and in the Codes of Practice applicable to our work.
Any changes, additions or deletions made to this SWMS are to be covered with the above personnel and the Principal Contractors representative at a
Toolbox meeting (Record date and time of Toolbox meeting below):