A-Sub Structure: Site/Location: Bole Arabsa 5 Lot 1 and 2 Type of Work: Compound & Fence Work

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ETHIOPIAN CONSTRUCTION WORKS CORPORATION (ECWC) BILL OF QUANTITY

Site/Location: Bole Arabsa 5 lot 1 and 2


Type of Work: Compound & Fence work
Item no Description Unit Revised QTY Rate Revised Amount

A-SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.01 Excavate pits in ordinary soil to vertical eucalaptus posts to a depth not exceeding 3
m 26.56
1500mm. Starting from the ground level.
1.02 Load and cart away all excavated material to an appropriate tip. m
3
26.56
2. CONCRETE WORK
2.01 Supply and construct lean concrete quality C-5, with minimum cement content of 150
kg /m3, of concrete:
3
a)C-5 in bottom ground under vertical Eucalaptus posts m 26.56
Total carried to Summary
3. Fence work

Provide Barbed wire for the fence and fix it by nail to Ø12 cm eucalyptus wooden
frame by with 30cm horizontal spacing and diagonally both zside, Price shall include
erecting vertical and diagonal eucalyptus wood with 1.5 m spacing and 2m height
above ground embedded in concrete base of 40cm x 40cm x 50cm after oiling the
bottom eucalyptus post besides all the neccesary G32 CIS doors as per the design.

Provide and fix eucalyptus wooden post of diameter 12cm frame, erecting vertical
3.01 post and Horizontal memebers with avertical spacing of 1m on the each corner of the
house as per the design drawing.
a.Vertical Post Members of 2.5 m length Pcs 332.00
3.02 Provide and fix 18 Gauge 2 point razor barbed wire ml 5,312.00
Provide and fix G32 CIS compound gate doors of 4m width and 2m height complete
3.03 with horizontal, vertical and diagonal eucalyptus posts with door hinges and lock Pcs 2.00
mechanism as per the design.
Total carried to Summary

Total Summary (birr)