ETHIOPIAN CONSTRUTION WORKS CORPORATION (ECWC) BILL OF QUANTITY

Site/Location: Bole Arabsa 5 lot 1 and 2


Type of Work: Toilet construction
Item
Description Unit Revised QTY Rate Revised Amount
no
A-SUB STRUCTURE
1. EXCAVATION & EARTH WORK
Bulk excavation in ordinary soil to a depth not exceeding 1500mm to
1.01 m3 18.15
remove expansive soil material.
Back fill around masonary wall and slab with selected material outside of
1.02 9.60
the site well compacted, rolled and compressed in layer not exceeding 20cm.
m3
Fill under hardcore with selected material from outside the site and compact
1.03 1.88
in layers not exceeding 200mm thick. m3
1.04 Cart away excavate material to a covinet plase of amaximum distanse 5km 18.15
m3
250mm thick basaltic stone hardcore well rolled, consolidated and blinded with
1.05 crushed stone . m2 6.25
Total carried to Summary
2. Masonry Work
500mm thick hard trachytic roughly dressed stone masonry foundation wall
2.01
below ground level bedded in cement mortar mix ratio (1:3) m3 1.80

2.02 Ditto but for exposed part above natural ground level. m3 1.80
Pointing the stone masonery external side above NLG in cement mortar
2.03 m2 4.20
(1.3)
Total carried to Summary
3. CONCRETE WORK
Supply and construct 50 mm lean concrete quality C-5, with minimum
3.01
cement content of 150 kg /m3, of concrete:
a)C-5 in 50 mm thick bottom ground slab m2 6.25
Total carried to Summary
B-SUPER STRUCTURE
1 ELEVATION WALL
Provideand fix eucalyptus wooden post of diameter 12cm frame, erecting
1.01 vertical post and Horizontal memebers with avertical spacing of 1m on the
each corner of the house as per the design drawing.
a.Vertical Post Member of 4m length Pcs 9.00
b.Horizontal members of 3m length Pcs 16.00
provide G32 CIS wall & fix it to eucalyptus wooden frame, Price shall
include erecting vertical eucalyptus wood with 1.5m interval and 0.9m
1.02 m2 31.50
interval horizontally besides all the neccesary G32 CIS doors and windows
as per the design.
Supply and fix 50cm hight wire mesh ventilation at the top of the wall
1.03 m2 6.00
below roof along the length surrounding the building as per design.
Total carried to Summary
2 ROOFING
Provide and fix eucalyptus wooden trusses of diameter 10cm frame,
Wooden purlin and truss with 1m of spacing and between vertical members.
2.01 Price shall include upper & lower chords eucalyptus wood, vertical &
diagonal member eucalyptus wood, eucalyptus purlin and wooden ridge
cover as per the design
a.Vertical truss members ml 11.00
b.horizontal truss members ml 6.00
c. Diagonal truss memebers ml 7.00
Provide roof cover in G32 CIS fixed to wooden purlin and truss.Price shall
2.02 include wooden ridge cover as per the design ( roof measured in horizontal m2 10.50
projection)

Total carried to Summary

1 OF 2
ETHIOPIAN CONSTRUTION WORKS CORPORATION (ECWC) BILL OF QUANTITY

Item
Description Unit Revised QTY Rate Revised Amount
no
3. FLOORING
3.01 30 mm thick smooth finished cement screed(1:3) floor finish . m² 9.00
100 mm thick concrete pavement all around the building on selected
3.02 compacted fill and red ash base with half precast concrete 300mm open 16.00
ditch Price shall include all the necessary assistance civil works thereto.

Total carried to Summary
4. SANITARY INSTALLATION
Supply & fix water supply pipes & Valves,vent pipe and all necessary
accessories for all domestic waste pipes connecting hand wash as per the
4.01 design for inlet & outlet.

a. 1/2" Male thread water faucet pcs 6.00


b. 3/4" Iron wheel control Valve pcs 3.00
c. PPR 3/4 " diameter ml 20.00
d. PPR Elbow ( 900) (3/4") pcs 15.00
e. PPR T -shape (3/4") pcs 8.00
f. UPVC (Ø50mm) ml 12.00
g. UPVC Elbow (900)(Ø50mm) pcs 5.00
h. UPVC T - Reducer(Ø110 X Ø50) pcs 4.00
i. UPVC(Ø110mm) ml 12.00
j. UPVC Triple socket T((Ø110mm) pcs 6.00
0
k. UPVC Elbow (90 )((Ø110mm) pcs 4.00
l. UPVC(Ø160mm) ml 6.00
m. UPVC T - Reducer(Ø160 X Ø110) pcs 2.00
n. UPVC End Cap (Ø160 ) pcs 3.00
o. UPVC S-trap pcs 6.00

Supply and fix Turkish Type Ceramic Squat Toilet with Squatting pan with
4.02 out Water Closet Including smell trap, Complete with all the necessary 6.00
accessories.
No
Provide Smooth cement screed finish hand wash basin C - 25 reinforced
concrete built with dimension of 1.5 m length, 0.5 m width and 1m height
4.03 m3 0.84
using 8mm diameter reinforcement with 20mm spacing including 3 water
faucets per basin with single water drainer as per design
Supply and fix Water Basin drain made of stainless steel of approved
4.04 quality, complete with all the necessary fittings and accessories. Size:- 2.00
Dia. 50 mm No
Supply and place properly (fix) 5 m³ capacity (effective volume) fiber glass
water tank on recommended elevated place and complete with all the
4.05 No 1.00
necessary connecting fittings and pipes with gate valve required to complete
the work
Total carried to Summary
5 . ELECTRICAL INSTALLATION
5.01 Power Cables
a) Cable for Lamps 2x2.5 mm² m 30.00
5.02 Supply and fix the following fixture
a) Surface mounted single switch Fixture No 6.00
b) Light Fittings and Lamps No 6.00
Total carried to Summary

Total Summary (birr)

2 OF 2