Professional Documents
Culture Documents
Mata Kuliah Petrofisika Dan Evaluasi Formasi Teknik Geofisika
Mata Kuliah Petrofisika Dan Evaluasi Formasi Teknik Geofisika
Tugas 1
OLEH
MUH. RISWAN ANAS SUKRI
201897006
TEKNIK GEOFISIKA
UNIVERSITAS PATTIMURA
AMBON
2021
Top
h1
Gross(H)
h2
Bottom
Ket : = Vsh
= Cut-off
Perhitungan Vshale:
𝐺𝑟 −𝐺𝑟𝑚𝑖𝑛
𝑉𝑠ℎ = 𝐼𝐺𝑅 = 𝐺𝑟
𝑚𝑎𝑥 − 𝐺𝑟𝑚𝑖𝑛
Diketahui: Grmax = 80
Grmin = 23
Jawab :
80 −23 40 −23 40 −23
IGR1 = 80−23 = 1 IGR9 = 80−23 = 0.2982 IGR17 = 80−23
= 0.2982
70 −23 50 −23 38 −23
IGR2 = 80−23 = 0.8245 IGR10 = 80−23
= 0.4736 IGR18 = 80−23
= 0.2631
60 −23 60 −23 30 −23
IGR3 = 80−23 = 0.6491 IGR11 = 80−23
= 0.6491 IGR19 = 80−23
= 0.1128
50 −23 70 −23 23 −23
IGR4 = 80−23 = 0.4736 IGR12 = 80−23
= 0.8245 IGR20 = 80−23
=0
40 −23 78 −23 30 −23
IGR5 = = 0.2982 IGR13 = = 0.8772 IGR21 = = 0.1128
80−23 80−23 80−23
30 −23 70 −23 40 −23
IGR6 = 80−23
= 0.1228 IGR14 = 80−23
= 0.8245 IGR22 = 80−23
= 0.2982
23 −23 60 −23 60 −23
IGR7 = 80−23
=0 IGR15 = 80−23
= 0.6491 IGR23 = 80−23
= 0.6491
30 −23 50 −23 80 −23
IGR8 = = 0.1228 IGR16 = = 0.4736 IGR24 = =1
80−23 80−23 80−23
A. Tops and Bottoms of the sand (Reservoir) sections
Top = 1803, 4 m
Bottom = 1810,2 m