CONTENT OF BCWP

Contents
PREAMBLE

SECTION 1 PRELIMINARY
1. Short Title, Commencement & Application
2. Definitions

SECTION 2 Approval of Designs


3. Application:
3.1 Preparation of Required Documents
3.2 Procedure of Application

4. Design Check:
4.1 Registration Check
4.2 By-Laws Check
4.3 NNBC Check

5. Reporting
5.1 Reporting for On-site Verification

SECTION 3 Permit for Building Construction


6. On-site Verification “Sarjamin”
6.1 Submittal for On-site Verification
6.2 Procedure of On-site Verification
6.3 Reporting the results

7. Temporary Building Permit


7.1 Application of Supervisor and Contractor
7.2 Approval of Design

Annex-1: Application for Design Check


A. List of the documents to be submitted for applying for design check
B. Application form for design check
Annex-2: Checklists for Registration Check
In the registration desk, the list of the documents submitted for design check are
verified.
Annex-3: Examples of Current By-Law Check
Ground Coverage, Setback, Right of way, Floor Area Ratio etc.
Bye-law check example of a residential building
Description Unit According to According to
bye-law drawing
Ground Coverage(70%) Sq-meter 60.52 59.7
Set back meter 1.5 2.31
Right of way Meter 4 4
Floor Area Ratio(1.75) Sq-meter 151.3(Total floor 147.3(Total floor
area allowable) area in drawing)

Annex-4: Checklists for NNBC Check


A. Checklist for reinforced concrete structure
B. Checklist for steel structure
C. Checklist for masonry structure
D. Checklist for other structure