Department: Overhead Lines & Power Cable Prepared by: RAHMAT IZAIZI BIN ISMAIL Doc No. : HSE-HIRADC-011
Unit: Cable Checked by: SHIN CHEE FAI Revision : 1
Section: Cable Verified by: SARAVANAN Date : 5/9/2015
Job Title: (11)PIPE LAYING Approved by: HAN FATT JUAN Previous Date:
Department: Overhead Lines & Power Cable Prepared by: RAHMAT IZAIZI BIN ISMAIL Doc No. : HSE-HIRADC-012
Unit: Cable Checked by: SHIN CHEE FAI Revision : 1
Section: Cable Verified by: SARAVANAN Date : 5/9/2015
Job Title: (12)POWER CABLE LAYING / PULLING Approved by: HAN FATT JUAN Previous Date:
Lifting of cable
drum into the
cable stand - MS, Signalman, Sling rope log maintenance, Competence Engineer, Site
- Breakoff and use - Falling object Training,refresh method
Supervision, barricade lifting area, Inspection of 2 3 6(M) Admin, PPE Supervisor, Safety Site
unsafe sling rope statement and SWP
lifting machine, PPE, Toolbox, CIDB, NTSP. Supervisor
Cable Laying
- Method Statement, Toolbox, PPE,
Competence Engineer, Site
- Exposed with high Supervision, Signalman, competance operator, Training,refresh method
- Electrocution 2 3 6(M) Admin, PPE Supervisor, Safety Site
voltage existing cable Barricade, signage, CIDB, NTSP, PTW, statement
Supervisor
Mapping report
Cable pulling
- Method Statement, Toolbox, PPE,
Competence Engineer, Site
- Expose the existing Supervision, Signalman, competance operator, Training,refresh method
R - Electrocution 2 3 6(M) Admin, PPE Supervisor, Safety Site
high voltage cable Barricade, signage, CIDB, NTSP, PTW, statement
Supervisor
Mapping report
Department: Overhead Lines & Power Cable Prepared by: RAHMAT IZAIZI BIN ISMAIL Doc No. : HSE-HIRADC-014
Unit: Cable Checked by: SHIN CHEE FAI Revision : 2
Section: Cable Verified by: SARAVANAN Date : 5/9/2015
Job Title: (14)POWER TERMINATION & TESTING Approved by: HAN FATT JUAN Previous Date: