IMRAN HUSSAIN

Mobile No. 0091- 9351795887 / 9870858288


E-Mail: imran_enggmech@yahoo.com

Profession : Mechanical & Piping Engineer


Experience : 3 Years

Father Name : Tanveer Hussain


Year of Birth : 2 August 1984
Nationality : Indian
Passport No. : J0982016
Date of Expiry : 08/07/2020, Jaipur
Marital Status : Single

KEY QUALIFICATIONS

More than 3 years of continuous employment in Construction in Power Generation industries.

Responsible for all kind of Mechanical and Piping in Construction activities and co-ordinate with

Commissioning of the following according to the area of classification (Zone).

EDUCATION AND PROFESSIONAL STATUS

1 B.E in Mechanical Engineering from University of Rajasthan, Jaipur.


2 Post Graduation in Piping Design & Engineering from Maharastra Institute of
Technology.
3 Intermediate from Board of Rajasthan Education, Ajmer.
4 SSC from Board of Rajasthan Education (SSC), Ajmer.

Familiar with

Software Knowledge: MS Office, Windows, PDMS, Caesar ii (Static Analysis) and AutoCAD.

International Design codes & Dimensional standards.

Viz: ANSI/ASME, API, BS, ASTM & there use in design, analysis and calculation
EXPERIENCE RECORD

1 Company : Uhde India Limited, Mumbai, Maharastra


Project : BPCL, Mahul Refinery
: MRPL, Mangalore Refinery

Designation : Piping Engineer

Responsibility includes providing general assistance such as Construction Field, project planning,
project management etc. Follow up with contractors and bulk piping material control. Work
involves extensive interaction with client and contractors.

Responsibilities include:

1 Pipeline design considerations, materials and components, design,


fabrication, assembly, erection, examination, inspection, and testing of
piping, using ASME B31.3 Process Piping Codes.
2 Defining the scope of work from available engineering data pack,
mobilization of the manpower, monitoring and reporting the completed
work to the project manager.

3 Extensive monitoring and control of the project by regular reviews with Consultants for
Engineering disciplines (For drawings / document delivery), Vendors (Equipment &
Material delivery), Contractors (Construction management) and suggest suitable action
plans to management for early recovery incase of delays.

4 Contributed in collecting the information regarding HSE performance throughout the


project life cycle.

5 Maintaining effective interfaces and relationships within/between disciplines, project


teams and customer operating units.

6 Managing the site staff for efficient running and functioning of the
project.
7 Prepare and review P&ID,PFD,GAD,
8 Knowledge of ASME code B 31.1, B31.3,B31.4,B31.8.
9 Witnessing the Hydro testing of the pipe lines, drums and vessels
10 Verification of isometric dawning with respect to P&ID.
11 Witnessing the Hydro testing of the pipe lines, drums and vessels.
12 Prepare hydro test packages, line check and punch listing.
13 Pipe Wall Thickness Calculation, Valve MTO, Piping MTO, Specialty Item
MTO
14 Equipment Layout, Piping Layout
15 Support MTO, PDMS Review
16 Working in a team environment and handling multiple project responsibilities.
17 Close out (partial/ complete) for project
18 Documentation of project department

2 Company : Thermal Power Plant, Rajasthan

: Instrument Limited Kota, Rajasthan

Designation : Mechanical Trainee Engineer

Responsibilities:

1 Supervise maintains of boiler Tube, Steam Turbine, Insulations Of steam lines.


2 Co-ordinate with the Supervisor and Erection of Steam Turbine.
3 Work As site Engineer Construction of new 7th Unit of 195MW.
4 Supervises the installation and erection work of Steam Turbine, controlling the Furnace
and Boiler Desk, Critical Steam Lines.
Proficient in

1. Review of G.A Drawings and Isometrics based on P&ID and plant layout.
2. Piping Material Selection/Specification/Valve Data Sheets.
3. Verification of isometric dawning with respect to P&ID.
4. Reviewing the approved quality plans, manuals and scope of work to perform the
required inspection.
5. Witnessing the Hydro testing of the pipe lines, drums and vessels.
6. Prepare hydro test packages, line check and punch listing.
7. Control of non conformities issuance of punch list.
8. Coordinating with client/consultants while the inspection is being carried out and
offer any clarification is required.
9. Witnessing of pneumatic test, hydro-test, and flushing; system lay-up both in and
in erection field.
10. Preparing and maintaining various QA/QC documents and final test packages.
11. Witness of alignment, orientation and dimensions of installed piping.
12. Assures that all joints are exposed for examination during pressure test.
13. Ensuring vents are open when filling and draining lines.
14. Conform repairs, re-testing and re-inspection in accordance with specifications.
Making a re-instatement punch list and clearing the items.
15. Witnessing of Flange joint assembly and bolt torque.
Ensure the blinds are removed and correct rating gaskets are installed.
16. Inspection of gaskets, supports, valves prior to line reinstatement acceptance as
per the latest drawing for construction, codes and specification standards.
17. Prepared documents, procedures for inspection method ,inspection and testing
plan in Computerized environment. Clearing of MCC (Mechanical completion
certificate) items.
18. Supervision of Piping & Mechanical Equipment Erection, Fabrication, Testing &
Commissioning.

Knowledge of

1. PFD and P&ID, Equipment drawings, Plot plan, Process plant layout, Piping
Welding, Erection & Testing.

2. Control valves, Flanges, Gaskets & Special equipment.

3. Line List Preparation and Design of Pipe rack width and height calculations
independently.

4. Preparing of Bulk Material Takes Off (MTO).

5. Drawing the Conceptual arrangement for overall Piping system.

6. Study layout preparation and Calculations independently.


7. Developing of Piping Supports and calculations independently.

8. Developing of Tank Farm and Dyke wall calculations doing independently.

9. Developing of Distillation Column and Elevations calculations doing


independently.

10. Using study layout, preparing isometric drawings and finding stress
critical lines for Analysis.

11. Equipment Layout Preparation and sent to AFD, also IFD for further
detailing.

12. Isometric Construction & Length calculation Checking.

13. Piping Layout Preparation.

14. Preparation of Intermediate MTO, Independently.

15. Preparation of Nozzle orientation drawing for all tanks for fabricating.

16. Piping Isometrics Construction with final MTO.