Thumb Rules For Civil Engineers is CONCRETE


essential for any civil engineer, Site CALCULATOR
engineer or civil supervisor. They MATERIAL
play a crucial role while taking CALCULATOR
quick decisions on site. Thumb FSI
rules help you in nding out the CALCULATOR
solution using a simple
g p

mathematical formula and make CONCRETE


smart decisions whenever needed. MIX DESIGN
But, while using these thumb
rules, you must remember that CONSTRUCTIO
the thumb rule never gives the N COST
exact or accurate results, you just BILL OF
have used them for approximate QUANTITY
results.

POPULAR
POSTS &
PAGES

House
Construction
Cost Calculator
Excel Sheet
There are numbers of thumb Free Download
Rules For Civil Engineers which we House
used in construction work. So, the construction
following are some most Cost
frequently used Thumb rules on Calculation
the Construction site. Excel Sheet.
Building
The Thumb rule method is an Estimation
approximate & comparing Excel Sheet -
method. In thumb rules and the Full Quantity
units are not the same when we Calculation
compare to get the results. So, Building
ignore units while performing Construction
thumb rule. Step by Step
process
Read More: 50 + CIVIL Load
ENGINEERING INTERVIEW calculation on
QUESTIONS & ANSWERS
Read More: MINIMUM CEILING column, Beam
HEIGHT STANDARDS FOR & Slab:
RESIDENTIAL HOUSE Building
Estimation
Excel Sheet
Post Contents [ hide ]
Which
Thumb rule for estimating the
Cement is best
Concrete Volume with respect to the
for House
area:
Construction
Thumb rule for Steel quantity required
The
for Slab, Beams, Footings & Columns:
Standard Room
you can also use BN Datta
recommendations for the more Size & Location
accurate result: in residential
Percentage of Steel in Structural building
Members: 11 Types of
Thumb Rules For Civil Engineers to Formwork
estimate the Shuttering area: (Shuttering)
Battens Quantity Calculation: used in
Thumb rule used for Cement, Sand, Construction
Coarse Aggregate Quantity in Di erent
Thumb
grades of Concrete :
Rules for Civil
Thumb Rules For Civil Engineers for
Engineers and
Brickwork:
Basic
Thumb Rules For Civil Engineers for
Cement Masonry Quantity:
Knowledge

Thumb rule for


ARCHIVES
estimating the
Concrete Volume with Select Mo

respect to the area:


The volume of concrete required =
0.038 m3/square feet area CATEGORIES

Select Cat
Example:-If Plan Area = 40 x 20 =
800 Sq. m.
So, for the plan area of 800 Sq. m.
the area the total volume of
HOUSE
concrete required
CONSTRUCTIO
N COST
= 800 x 0.038m3 = 30.4m3
CALCULATOR

Thumb rule for Steel


quantity required for
Slab, Beams, Footings
& Columns:
Steel required in residential
buildings = 4.5 Kgs – 4.75 Kgs / Sq.
Ft.

Steel required For Commercial


buildings = 5.0 Kgs-5.50 Kgs/Sq. Ft.

Read More: TOP 10 CIVIL


ENGINEERING SITE WORK

you can also use BN


Datta recommendations
for the more accurate
result:

The following recommendations


Thumb Rules For Civil Engineers
are given in B N Datta for the Steel
quantity used in di erent
members of the building

Percentage of Steel in
Structural Members:

1) Slab – 1% of the total volume of


concrete

2) Beam – 2% of the total volume


of concrete
3) Column – 2.5% of total volume
of concrete
4) Footings – 0.8% of the total
volume of concrete

Example:

How to calculate the steel quantity


of slab having the Length, width,
and depth of the slab is 5m x 4m x
0.15m

Step 1: Calculate the Volume of


Concrete

The Total Volume of Concrete for


given Slab = 5 x 4 x 0.15

= 3m3

Step 2: Calculate the steel


quantity using formula

As per the guidelines are given in


the B N Dutta reference book the
steel quantity of slab is 1% of the
total volume of concrete utilized.

Thumb rule to estimate Steel


quantity of above slab = Volume of
Concrete x Density of Steel x % of
Steel of Member

Steel weight required for above


slab = 3 x 7850 x 0.01 = 235Kgs

For accurate estimation, you can


refer to Bar Bending Schedule

Thumb Rules For Civil Engineers

Read More: HOW LONG SHOULD


CONCRETE CURE BEFORE
REMOVING FORMS

Thumb Rules For Civil


Engineers to estimate
the Shuttering area:
Shuttering costs is taken as 15-
18% of the total construction of
the building. Shuttering work is
done to bring the concrete in
Shape. Thumb rule to estimate the
shuttering required is 6 times the
quantity of concrete or 2.4 times
of Plinth area.

For example, the concrete quantity


is 0.5m3, then

Area of Shuttering is 0.5 x 6 = 3m2

Components of Shuttering:-

The Shuttering plate Ply, Battens,


Nails are components of
Shuttering.

Shuttering Ply Quantity


estimation:
Suppose, The shuttering Ply has a
length, width & depth of 2.44 x
1.22 x 0.012

The No. of Shuttering Ply sheets


= 0.22 times of Shuttering

Suppose, the shuttering area = 3m

Then Ply required for shuttering =


0.22 x 3 = 0.66m2

Battens Quantity
Calculation:

Shuttering batten usually has a


length & width of 75mm x 40mm.

Batten Quantity = 19.82 x No. of


Ply Sheets

If work requires 25 Ply sheets, the


total quantity of Battens are 19.82
x 25 = 495 Battens

Nails & Binding Wire Quantity in


Shuttering:

Approximately, 75 gams of Nails


used in the shuttering of the
1m2 area.

75gms of Binding wire is used


for every 1m2 of Shuttering.

Thumb rule for Shuttering oil


estimation :
estimation :

Shuttering oil is applied on the


shuttering plate surface used to
de-frame or de-assemble from the
concrete easily.

Total required Shuttering oil  =


0.065 x Total Area of Shuttering

(or)

For every 15m2 of shuttering 1


liter of shuttering oil is
consumed.

Example :

If, total area of shuttering is 15 m2,


then Shuttering oil Consumption =
0.065 x 15 = 0.975.

Thumb Rules For Civil Engineers

Read More: 17 TIPS FOR HOW TO


REDUCE CONSTRUCTION COST

Thumb rule used for


Cement, Sand, Coarse
Aggregate Quantity in
Di erent grades of
Concrete :
Note: 1 bag of cement = 50Kgs

Thumb rule for Cement required


in Brickwork, Cement Masonry &
Plastering work in construction:
g

Thumb Rules For


Civil Engineers for
Brickwork:

Brickwork Cement Qty Cement Qty


for 1m3 in m3 in Bags

230 mm
0.876m3 25.4 Bags
Brickwork

115 mm
0.218m3 6.32 Bags
Brickwork

Thumb Rules For


Civil Engineers for
Cement Masonry
Quantity:

Cement
Cement Qty Cement
Masonry Type
in Bags Qty in Kgs
& Mix

200mm in
Cement
0.124Bags/m2 6.2Kgs/m2
Masonry work
of ratio 1:6

150mm in
Cement
0.093Bags/m2 4.65Kgs/m2
Masonry work
of ratio 1:6

200mm in
Cement
0.206Bags/m2 10.3Kgs/m2
Masonry work
of ratio 1:4
150mm in 0.144Bags/m2 7.2Kgs/m2
Cement
Masonry work
of ratio 1:4

100mm in
Cement
0.103Bags/m2 5.15Kgs/m2
Masonry work
of ratio 1:4

Thumb Rules Plastering Quantity :

Type of Cement Qty Cement


Plastering in Bags Qty in Kgs

Rough
0.09 Bags/m2 4. 5Kgs/m2
Plastering

Internal Wall
0.09 Bags/m2 4.5 Kgs/m2
Plastering

Duct
0.09 Bags/m2 4.5 Kgs/m2
Plastering

External Wall 0.175


2
8.75 Kgs/m2
plastering Bags/m

Stucco 0.175
2
8.75 Kgs/m2
Plastering Bags/m

Lathen
0.55 Bags/m2 27.5 Kgs/m2
Plastering

Read More:

50 + CIVIL ENGINEERING
INTERVIEW QUESTIONS &
ANSWERS
HOW TO CALCULATE STEEL
QUANTITY FOR SLAB
TOP 10 CIVIL ENGINEERING SITE
WORK
House Construction Cost
Calculation in Excel Sheet.
Building Estimation Excel Sheet
HOW LONG SHOULD CONCRETE
CURE BEFORE REMOVING FORMS
BUILDING CONSTRUCTION STEP
BY STEP PROCESS
TYPES OF FOUNDATION & THEIR
USES IN BUILDING
CONSTRUCTION
WHICH CEMENT IS BEST FOR
HOUSE CONSTRUCTION
RCC COLUMN DESIGN –
CALCULATE IN EXCEL SHEET

Top 10 CIVIL 50 + Civil What is Civil


ENGINEERING Engineering Engineering -
SITE WORK Interview History, Scope &
14/10/2019 Questions & Top 25
In Answers Universities
"MISCELLANEOUS" 16/12/2019 05/12/2019
In In "HOUSE
"MISCELLANEOUS" CONSTRUCTION"

Share

« Load calculation on column, Beam &


Slab:

Tips for Civil Site Engineers »


Search … 

HOUSE CONSTRUCTION

RESILIENT WHAT IS 8+
FLOORING & POINTING AND FOUNDATION
ITS TYPES 8 TYPES OF CONSTRUCTIO
WITH POINTING N STEPS
BENEFITS

14 THINGS TO 9+ 15+ TYPES OF


CHECK BEFORE CONSTRUCTIO DRAWINGS IN
BUYING HOUSE N SITE CONSTRUCTIO
PREPARATION N
STEPS

FLOATING 25 TYPES OF WHAT IS THE


FOUNDATION – BEAM & THEIR STRONGEST
PRINCIPLES, USE IN FOUNDATION
CONSTRUCTIO CONSTRUCTIO FOR A HOUSE
N STEPS N
22 COMMENTS

SARTAJ AHMAD BHAT says:

What about Culvert and bridge


details. Please may send in
relevant

Reply

Roshan says:

The volume of concrete required =


0.038 m3/square feet area

Example:-

If Plan Area = 40 x 20 = 800 Sq. Ft.

So, for the plan area of 800 Sq. Ft.


area the total volume of concrete
required

= 800 x 0.038m3 = 30.4m3o

Sir, plan area square feet Mai hai


aur concrete density cubic meter
Mai ? It is right sir?

Reply

Mike Mahajan says:


Sorry, Area is 40 x20 m = 800 sq. M
It is by mistake.
Thanks for knowing me

Reply

sj says:

sir,
sqm of area and cubic metre of
concrete.
can we evaluate like that?
units are not in sync

Reply

Sahil patel says:

Sir.
I like your video and i learned a lot
i am doing my architecture
Technology Bsc at DMU Leicester
university.
Sir whatever knowledge i got from
you is really valuable please send
me very new videos and PDF .

Thanks
A lot for teaching

Reply
Santosh says:

For 800sqm area 0.38cum conc


Ie 800 x 0.38 = 304cum concrete

Reply

Sekar says:

Cement consumption is 63 kg only


for 1 cum bwork .why 24 bags.

Reply

Shrikant Bendkale says:

Cement content for brickwork is


50-70 kg then why given as 25.4
bag

Reply

Mohd mehraj says:

In have 2plots. 23*29. Second


25*36. TOTAL LENGTH 48. IF I
TAKE SQURE 48*29. PLS HELP ME
FOR G+ 2 PLAN . GROUND.FLOOR
FOR OWNER 1 AND 2 FLOOR FOR
RENTAL
Reply

Aijazahmed says:

contact
hr.iircc@gmail.com

Reply

RANJITH.R says:

What is the formula used for the


dome concrete and steel quantity
calculation ?
How to calculate the area and
volume please give a solution?

Reply

Manikandan RMK says:

I leaning for more Impermation at


this web site. All comments is very
correct and easy to leaning the
method.

Reply

ukas says:
Really useful this article

Reply

gazoblok says:

Thanks for sharing all of your


experiences!

Reply

Ranjeet Kumar Sahani says:

Thanks for shearing sir!!

Reply

i-pro24 says:

Tnx for this useful aricle!!

Reply

Devendra shinde says:

very usefull

Reply
Ruwan says:

Can you please tell me thumb rule


estimation for aluminium and
glass facade multi storey
buildings?

Reply

Pushpraj says:

How to downlode pdf

Reply

Rohit Khande says:

Sir , this article is very usefull


Thank you sir
Sir please provide complete rrc
design of g+1 building

Reply

Ranjan Pirke says:

Where is the link for downloading


this Article?

Reply
Mike Mahajan says:

save as pdf

Reply

Leave a Reply

Enter your comment here...

About us Privacy Policy Advertise With us Career Sitemap

Copyrights@ civiconcepts.com
2019-20 | Bhushan Mahajan

You might also like