Download as pdf or txt
Download as pdf or txt
You are on page 1of 27

All Hands Meeting

Monday 1 JULY, 2019


SAFETY MOMENT
Encephalitis deaths in Bihar – Link to Lychees
 More than 100 children have died in Bihar in the past few weeks with Acute
Encephalitis Syndrome (AES)
 What is causing these deaths?
In a case of acute encephalitis syndrome (AES), there is no bacteria or
virus involved.
When people – particularly children, who have considerably lower levels
of body fat than adults – sleep without eating dinner, their body depends
on reserves of glycogen stored in liver.
When glycogen reserves are depleted in the liver, the body draws energy
from less-ideal sources like muscle and connective tissue.
the liver – produces many products like ketones and amino acids which
can have damaging effects on the brain or peripheral nervous system
An enzyme called 'MCPG' in litchis can trigger a stark overnight dip in
sugar levels (a condition called hypoglycaemia)
With abundant availability of lichies during this season, when
undernourished and hungry children ate lichies, it spiked their amino acid
levels thereby causing fever, convulsions, coma and death.
For more, read:
https://www.firstpost.com/india/encephalitis-deaths-in-bihar-lychees-can-trigger-brain-fever-infection-but-the-main-cause-is-malnutrition-says-expert-6847341.html
https://www.thehindu.com/news/national/bihar-encephalitis-deaths-what-is-the-issue-all-about/article28154921.ece 3
ETHICS MOMENT
Real Values
Real Values make a real difference

Despite our best efforts, mandatory training and requirements


can sometimes seem like a distraction to front-line employees.

Employees who bring our values to life for their team


members can have a major, positive impact not only on their
team’s morale, but also on our business success and
performance.

Whenever you get an opportunity during team huddles,


meetings etc. share some real life examples that demonstrate
how you have applied any of the Louis Berger values.

e.g. a situation you might have dealt with, which demanded a


deviation from policy, but you ended up on the winning side by
refusing to submit to the pressure.

Source:https://www.google.co.in/search?q=say+no+to+bribery&dcr=0&source=lnms&tbm=isch&sa=X&ved=0ahUKEwiroonEgonWAhXLsY8KHWxyCy0Q_AUICigB& 5
biw=1348&bih=609#imgrc=kLuSIutZ_sIWAM:
PROJECT UPDATE
BHOPAL & INDORE METRO
BHOPAL & INDORE METRO RAIL – MoU APPROVAL
BHOPAL & INDORE METRO RAIL – MoU APPROVAL

STATE CABINET GRANTED APPROVAL TO PREPARE TRIPARTITE AGREEMENT (MoU)


BETWEEN THE UNION GOVT., STATE GOVT. & MADHYA PRADESH METRO RAIL CO. LTD.
MoU SIGNED BY CHIEF SECRETARY, GoMP, & MD, MPMRCL, ON 28.06.2019
MINISTER OF HOUSING & URBAN AFFAIRS TO SIGN THE MoU THIS WEEK

7
BHOPAL & INDORE METRO RAIL – MoU APPROVAL
BHOPAL & INDORE METRO RAIL – MoU APPROVAL

8
PROJECT UPDATE
VERSOVA-BANDRA SEA LINK
VBSL – ISSUE OF APPOINTED DATE TO RELIANCE-ASTALDI
JV
VBSL – ISSUE OF APPOINTED DATE TO RELIANCE-ASTALDI JV

APPOINTMENT DATE (COMMENCEMENT DATE) ISSUED ON 24 JUNE 2019


TO THE EPC CONTRACTOR (M/s RELIANCE INFRASTRUCTURE-ASTALDI JOINT VENTURE)

10
VBSL – ISSUE OF APPOINTED DATE TO RELIANCE-ASTALDI JV
VERSOVA-BANDRA SEA LINK

COMMENCEMENT DATE: 24 JUNE 2019


CONSTRUCTION DURATION: 60 CALENDAR MONTHS
COMPLETION DATE: 23 JUNE 2024

11
MOVIE MOMENT
MOVIE MOMENT – ARTICLE 15
MOVIE MOMENT – ARTICLE 15

13
Work Anniversaries – This Week
Gurgaon Office

Rajesh Gupta Project Manager


02 July 2007 11 Years

Ombir Tevatia Draftsman

04 July 2006 12 Years

15
Gurgaon Office

Neha Arora 3D Visualization Artist


01 July, 2016 3 Years

Sandeep Tewatia Quantity Surveyor

01 July 2016 3 Years

16
Hyundai - Rotem

Yog Raj Local Interface Expert


05 July, 2018 1 Year

17
Gurgaon Office

Babita Choudhary Office Assistant


01 July,2015 4 Years

18
Navi Mumbai Metro Project

Sunny Gupta Senior AFC Engineer


03 July, 2018 1 Year

Arvind Bhatnagar Deputy Project Director


02 July, 2018 1 Year

19
Navi Mumbai Metro Project

Shreya S. Rane Document Controller


01 July, 2013 6 Years

Shivaji Ghere Electrical Engineer- PST


01 July 2014 5 Years

20
Navi Mumbai Metro Project

Subhash Chandra Senior Transit Architect


03 July 2009 10 Years

21
Kota Project

Raghuveer Prasad Office Assistant


Gautam
02 July, 2016 3 Years

22
Mumbai Metro Line 4

Megha Deshmukh Telecomm Engineer


06 July, 2015 4 Years

23
Mumbai Office

Gulshan Rai Madan Principal Advisor


1 July, 2013 6 Years

24
Welcome to Louis Berger
Gurgaon Office

Pournima Kshirsagar Landscape Architect


Thote
24 June, 2019

26

You might also like