Professional Documents
Culture Documents
Alstom Nuclear Plant
Alstom Nuclear Plant
1 Alstom in Nuclear
4 Recent Projects
p.2
Alstom in Nuclear
Credits to EDF
p.4
Alstom in Nuclear
World N°1 supplier of nuclear steam turbine generators
Europe
North America 90 GW South Korea
8 GW 103 units China 5 GW
8 units 6 units
India
6 GW
6 units
2 GW
11 units
South Africa
< 800 MW
Full-speed 2 GW
24 47
50 2 units 800 - 1200 MW
86 Half-speed 65 > 1200 MW
30% of all the world’s nuclear plants have an Alstom steam turbine
p.5
EDF French Nuclear Fleet
Various generations of nuclear steam turbines
N4 – ARABELLE
1550 MW
p.6
Nuclear Business
Competitive Positioning
Largest unit in 1100 MWe 1410 MWe 1060 MWe 1180 MWe 1500 MWe 1550 MWe
commercial operation Higashi-Dori 1 Palo Verde 2 Tianwan 1 Genkai 3 Isar 2 Chooz B1
(as of Sept. 2012) (50 Hz) (60 Hz) (50 Hz) (60 Hz) (50 Hz) (50 Hz)
Largest unit under 1400 MWe 1455 MWe 1200 MWe 1370 MWe 1720 MWe 1750 MWe
construction Braka 1-4 Shin-Kori 3 Leningrad II 1 Lungmen 1 Olkiluoto 3 Flamanville 3
(as of Sept. 2012) (50 Hz) (60 Hz) (50 Hz) (60 Hz) (50 Hz) (50 Hz)
• Color code:
Green = currently in Operation
Blue = currently under Construction
p.7
The Turbine Island
Agenda
1 Alstom in Nuclear
4 Recent Projects
p.8
Inside a Nuclear Power Plant
Primary, Secondary, Tertiary Loops
80
60
Steam volume flow (m3/s)
Fossil
40 Nuclear
X5
20
0
0 500 1000 1500 2000
Steam turbine generator output (MW)
Nuclear large volume flows need for long blades high centrifugal forces
p.11
What is specific to Nuclear Power Plants ?
Wet steam conditions
Fossil
Dry
150-300 bar
Steam
540-600°C
H = Enthalpy (kJ/kg)
Saturation line
Nuclear
50-75 bar Wet
265-290°C Steam
S = Entropy (kJ/kg/°K)
p.12
Steam Expansion Line
Mollier Diagram – N4 Reactor
P : 10.1 bar
T : 268°C
P : 71 bar
T : 287°C “cold” steam at LP inlet :
x : 0.4 % • small LP axial thermal expansion
IP • reduced axial clearances
• possibility to fit a 4th LP
MSR
HP
P : 3.3 bar
T : 148°C
X:0%
P : 10.7 bar
T : 183°C
x : 14.6 %
Enthalpy
H (kJ/kg)
LP
Entropy
S (kJ/kg.K) P : 0.055 bar
x : 12.5 %
p.13
EPR - Flamanville 3
Simplified steam-water cycle
Generator, exciter
HP IP LP
De-aerating
feed-water tank
Condensate
MSR drain pumps extraction
pumps
Core
LP heaters
p.14
World Nuclear Power Plants
Half-speed dominates the market above 700 MW
• France, U.S.A., Canada, Japan, South Korea, Brazil, Taiwan, South Africa, etc.:
− all nuclear units in operation are half-speed
• China:
− since 2005, all nuclear turbines (with output > 700 MW) ordered are half-speed
26%
Full-speed / Half-speed
Half-speed
66%
91% Full-speed
100%
74%
34%
9%
All sizes < 700 MW > 700 MW > 1200 MW Unit size range
p.15
Full Speed vs. Half Speed – what makes the difference ?
Case study : Ling Ao 1 vs. Ling Ao 3
Enthalpy (kJ/kg)
3100
Ling Ao 1
3000 Full speed
2900
Ling Ao 3
IP
Half speed
2800
2700
HP
2600
Half speed
2500
expansion lines
LP
2400
in HP, IP and LP
sections are
2300
much more
efficient
2200
2100
5,8 6 6,2 6,4 6,6 6,8 7 7,2 7,4 7,6
p.16 Entropy (kJ/kg/K)
A challenge for turbine designers
Covering a wide range of reactors & heat sinks
5
33
32
31
30
28
27
26
24
23
21
19
17
15
p.17
12
A challenge for turbine designers
Covering a wide range of reactors & heat sinks
APWR
100 m²
3 500 MWth
AP1000
75 m² VVER1200
3 000 MWth
CPR1000
ATMEA1
2 500 MWth
50 m²
PHWR700
1.5 "Hg
2 000 MWth 2.5 "Hg 1.5 "Hg
100 mbar 90 mbar 80 mbar 70 mbar 60 mbar 50 mbar 40 mbar 30 mbar 20 mbar
5
33
32
31
30
28
27
26
24
23
21
19
17
15
p.18
12
The Turbine Island
Agenda
1 Alstom in Nuclear
4 Recent Projects
p.19
Integrated Packages
Turbine Island (TI)
p.20
Integrated Packages
Secondary Loop Package (SLP)
p.21
Turbine Islands
key components
Steam turbine
Grid equipment
MSR
4-pole generator
p.22
The Turbine Island
Agenda
1 Alstom in Nuclear
4 Recent Projects
p.23
Turbine Technology
Use of more efficient single flow steam expansion
Moisture Separator
Reheater
71 bar 3 bar
11 bar
Moisture Separator
p.24 Reheater
ARABELLE™ Steam Turbine
Advanced compared to previous generation
ARABELLE™
~75 bar Efficient configuration
HP IP LP 1 LP 2 LP 3 Single flow use
MSR
MSR ~10 bar
PREVIOUS GENERATION
~75 bar
LP 1 Traditional configuration
HP LP 2 LP 3
Double flow use
MSR
IP LP
Single Flow Double Flow
HP
ARABELLE™
Single Flow
HP
PREVIOUS GENERATION
Double Flow
LP
Double Flow
p.26
How to improve turbine efficiency ?
p.27
ARABELLE™ Characteristics
Combined HP/IP Module, Unique in the Market
p.28
ARABELLE 1700 50 Hz
Flamanville 3 HP-IP casing
p.29
ARABELLETM References
Ling Ao 3+4 – 2 x 1080 MW
p.31
ARABELLETM References
Flamanville 3 – 1 x 1750 MW
p.32
ARABELLE 1000 for Ling Ao 3
Last Stage Blades : LSB57
1 Alstom in Nuclear
4 Recent Projects
p.34
GIGATOP 4-pole for Flamanville 3
A highly efficient turbo-generator
• 2000 MVA
• Cos-phi = 0,9
• 1500 rpm
• 4 poles, 3 phases
• 23 kV
• Brush-less exciter
• H2 and H2O cooled
• Stainless steel cooling
tubes
• H2 pressure: 6 bars(g)
• Triple-circuit hydrogen
sealing system
• 99% efficiency
p.35
The Turbine Island
Agenda
1 Alstom in Nuclear
4 Recent Projects
p.36
Key Components
Heat Exchangers for Nuclear Plants
5
2
Moisture separator
reheater (MSR)
4 High velocity
2 3 separators (HVS)
1
HP heater
3
Feedwater tank Nuclear purification
LP heater and deaerator system (NPS)
4 5
p.37
ALSTOM MSR
Moisture Separator Reheaters
p.38
Nuclear Heat Exchangers
Flamanville 3 deaerating feed-water tank
• Designed by Alstom
- In 3 separate pieces
- 98 t + 90 t + 98 t
- Transported separately
- Welded at site
p.39
Nuclear Heat Exchangers
A Complete Condensing System
p.40
The Turbine Island
Agenda
1 Alstom in Nuclear
4 Recent Projects
p.41
Key Components
Pumps for Nuclear Plants
Essential
8 service pump
Open/closed loop
7 cooling pump
6 Residual heat
removal pump
6 3
7 2 5
4
1 8
Concrete volute
circulating water Condensate Feedwater pump Intermediate Vacuum pump
pump extraction pump cooling pump
3 5
1 2 4
p.42
Nuclear Pumps
Concrete Volute Circulating Water Pumps
Flamanville 3 NPP :
B
• Civil engineering works on suction ducts (Sept. 2009)
p.43
Nuclear Pumps
Concrete Volute Circulating Water Pumps
p.44
The Turbine Island
Agenda
1 Alstom in Nuclear
4 Recent Projects
p.45
ARABELLE™ References
Flamanville 3 – 1 x 1750 MW
p.47
Flamanville 3 – 1750 MWe
ARABELLE™ - Turbine & Generator
p.48
ARABELLETM References
Flamanville 3 – 1 x 1750 MW
• Generator rotor
p.49
Flamanville 3 – 1750 MWe
ARABELLE™ - Turbine & Generator
p.51
ARABELLE™ References
Ling Ao phase II – 2 x 1080 MW
p.53
ARABELLE™ References
Ling Ao phase II – 2 x 1080 MW
p.54
ARABELLE™ References
Ling Ao phase II – 2 x 1080 MW
p.55
ARABELLE™ References
Ling Ao phase II – 2 x 1080 MW
p.56