Soil investigation Quotation Comparision

VR Geotechnical Geo Engineering Time institute Mars Synergy


(Erode) (Chennai) Velciti (Chennai) (Trichy) (Chennai)
Sr.No Description Unit
Rate Rate Rate Rate Rate
1 Boring Charges per  'm' for soil from Ground level to 10 m Rmt 1,750.00 850.00 3,650.00 1,500.00 4,750.00
2 Boring Charges per  'm' for soil from 10m  to 20m Rmt 2,500.00 900.00 3,650.00 1,500.00 1,750.00
3 Boring Charges per  'm' for soil from 20m  to 30m Rmt 2,750.00 950.00 3,950.00 2,000.00 2,150.00
4 Boring Charges per  'm'  for soft rock (RQD less then 10%)   Rmt 3,000.00 3,000.00 5,500.00 2,000.00 5,500.00
5 Boring Charges per 'm'  for dense medium rock(RQD varies from 10% to 30%)  Rmt 3,200.00 4,000.00 5,700.00 2,500.00 5,500.00
6 Boring Charges per 'm'  for Hard rock(RQD Greater than 30%)  Rmt 3,500.00 5,000.00 5,900.00 3,500.00 6,500.00
7 Mobilization &Demobilization Ls - 45,000.00 - - 45,000.00
8 Shifting charge per shifting - 2,000.00 - - 1,500.00
9 Analysis of field test results Per bore - - - - 2,500.00
10 Working water for drilling Per bore - 2,500.00 - - -
11 Conducting tests Per bore - 3,000.00 - - -
12 Analysis of field test results and submission Ls - 75,000.00 - - -