Professional Documents
Culture Documents
Name: Abubakar Hussaini Matric No: Department: Business Administration Course: Developments and Management Date: 21/12/2020
Name: Abubakar Hussaini Matric No: Department: Business Administration Course: Developments and Management Date: 21/12/2020
i. Plant
ii. Layout
iii. Materials Handling
iv. Tetrotechnology
PLANT.
Meaning of Plant
Since plant layout is responsible for an orderly flow of materials, productivity and
morale of the workers, it is necessary to have systematic layout planning. This has
become all the more necessary with the increasing costs of the land, labour and
building materials.
LAYOUT
Material handling
It is not only about the movement of material. It also involves storage, protection,
and control of material while it moves in different departments like a warehouse,
production, and manufacturing departments. It is one of the essential tasks for
organizations. A poorly handled material become waste before it can be used for
production purpose or before it is sent to retail stores.
In the old times, it was mostly done manually because of the lack of technology.
Because of that, the number of accidents during handling work was quite high. In
present times, with the introduction of technology, almost all of the work is done
using automation or semi-automation. The introduction of technology not only
reduced the cases of accidents occurred but also made the work fast.
iii. Terotechnology
Lewis, L.A.; McCourt, R.M. (2004). "Green algae and the origin of land plants".
American Journal of Botany. 91 (10): 1535–1556.
doi:10.3732/ajb.91.10.1535. PMID 21652308.
Kenrick, Paul; Crane, Peter R. (1997). The origin and early diversification of land
plants: A cladistic study. Washington, D.C.: Smithsonian Institution Press.
ISBN 978-1-56098-730-7.