Professional Documents
Culture Documents
Cambridge Secondary 1 Checkpoint: Cambridge Assessment International Education
Cambridge Secondary 1 Checkpoint: Cambridge Assessment International Education
Cambridge Secondary 1 Checkpoint: Cambridge Assessment International Education
MATHEMATICS 1112/02
Paper 2 October 2019
MARK SCHEME
Maximum Mark: 50
Published
This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of the
examination. It shows the basis on which Markers were instructed to award marks. It does not indicate the
details of the discussions that took place at an Markers’ meeting before marking began, which would have
considered the acceptability of alternative answers.
Mark schemes should be read in conjunction with the question paper and the End of Series Report.
Cambridge will not enter into discussions about these mark schemes.
IB19 10_1112_02/4RP
© UCLES 2019 [Turn over
1112/02 Checkpoint Secondary 1 – Mark Scheme October 2019
PUBLISHED
Question Answer Mark Further Information
1(a) 8 GB 1
Positive (correlation) 1 Ignore comments about strength.
Any comment demonstrating positive correlation,
1(b) or
e.g. Smaller memory sticks cost less.
The larger the memory size the higher the cost. Do not allow directly proportional.
2(a) 66 1
1
2(b) 68
3 14 1
4 = 2
>
<
2 correct signs B1
5 Ticks cube and shows correct working e.g. 2 Accept any unambiguous indication.
• (volume of cube) 216 (cm3) and (volume of cuboid) 210 (cm3)
• (6 ×) 6 × 6 > (6 ×) 7 × 5
• 36 (× 6) > 35 (× 6)
Sight of B1
216
or
210
or
(6 ×) 6 × 6 and (6 ×) 7 × 5
or
36 and 35
Page 2 of 10
1112/02 Checkpoint Secondary 1 – Mark Scheme October 2019
PUBLISHED
Question Answer Mark Further Information
Page 3 of 10
1112/02 Checkpoint Secondary 1 – Mark Scheme October 2019
PUBLISHED
Question Answer Mark Further Information
9 4.5(0) (dollars) 3
sight of 540 – the cost of 90 light bulbs in US in dollars M1 Only if M2 not awarded.
or
sight of 495 – the cost of 90 light bulbs in Germany.in euros
or
for converting a relevant price in euros into dollars by multiplying by
1.1,
e.g. 33 × 1.1 or 36.3 or (33 ÷ 6) × 1.1 or 6.05
10(a) 30 1
10(b) 40 1
11(b) x = –2 1
Page 4 of 10
1112/02 Checkpoint Secondary 1 – Mark Scheme October 2019
PUBLISHED
Question Answer Mark Further Information
12(b) Block 2 1 All 10 boxes filled in correctly needed for the mark.
Red Green Yellow Blue
(R) (G) (Y) (B) Do not accept reversed order, e.g. RG for GR.
Red (R) RR RG RY RB
Block 1
Green (G) GR GG GY GB
Yellow (Y) YR YG YY YB
Blue (B) BR BG BY BB
13(c) (x = ) 26 2
A correct method to eliminate either variable e.g. M1 M1 for correct method to eliminate either variable.
2(4y + y) = 65 oe FT their answer to part (a) and part (b) providing
1 working for elimination is shown and leads to an
or x + 4 x = 32.5 oe equation in one variable. Condone working shown in
earlier parts.
or y = 6.5
14 32 1
Page 5 of 10
1112/02 Checkpoint Secondary 1 – Mark Scheme October 2019
PUBLISHED
2 correct B1
16 x 1x
(y = ) 1 Or equivalent for y, e.g. x ÷ 2,
2 2
Do not allow 2y = x
17 Ticks ‘Correct’ 1
and
provides a suitable explanation, e.g. Do not allow
• The angles are the same / both 70(°) • both are 70%
• Both proportions are 70/360 • they are the same number.
1
• In both classes, around 20% or or 19.4% of the students Accept 19%.
5
take the bus.
Page 6 of 10
1112/02 Checkpoint Secondary 1 – Mark Scheme October 2019
PUBLISHED
20(a) 14 1
or
Page 7 of 10
1112/02 Checkpoint Secondary 1 – Mark Scheme October 2019
PUBLISHED
22 120 2
x × 0.4 × 0.25 = 12 oe M1
or
(12 ÷ 0.25 =) 48 oe
or
(12 ÷ 0.4 =) 30 oe
or
(25% of 40% = ) 10% or 0.1 oe
30÷1.2 25 M2
oe or oe
20×16 320
or
0.078(125)
or
for sight of 25 (or 25 000 000) and 320 (or 3 200 000) Seen separately
Page 8 of 10
1112/02 Checkpoint Secondary 1 – Mark Scheme October 2019
PUBLISHED
26 (x = ) 4 1 Both correct.
(y = ) 7
Page 9 of 10
1112/02 Checkpoint Secondary 1 – Mark Scheme October 2019
PUBLISHED
BLANK PAGE
Page 10 of 10