Commissioning Inspection, Check and Test
Commissioning Inspection, Check and Test
Commissioning Inspection, Check and Test
1.1 Motor
1.2 Gearbox
1.3 Coupling
Hi speed coupling
2. PULLEY
Brand : …..
2.1 Drive Pulley Dim : See : DWG-M-…..
Lagging : …….
Brand : …..
2.2 Snub pulley Dim : See : DWG-M-…..
Lagging : …….
Brand : …..
2.3 Tail Pulley Dim : See : DWG-M-…..
Lagging : …….
SIGNATURE :
Page 1 / 19
COMMISSIONING INSPECTION,
CHECK AND TEST
Purpose 1. Assembly Inspection 2. Installation/Erection Inspection 3. Witness of Final Test
LOCATION : DOC. NO. :
PROJECT : REPORT NO. :
DATE : DWG REF. NO. :
ITEM : STATUS : 1. COMPLETED 2. INCOMPLETED
3. IDLERS
See : DWG-M-…..
3.1 Impact idler
See : DWG-M-…..
3.2 Carry idler
See : DWG-M-…..
3.3 Return idler
See : DWG-M-…..
3.4 Self carry idler
See : DWG-M-…..
3.5 Self return idler
Executed by : ……….
4.1 Splicing Joint Hot Splicing
No Component specification Installed/ Condition Remarks
Not OK /Not
installed OK
5. CLEANING DEVICES
SIGNATURE :
Page 2 / 19
COMMISSIONING INSPECTION,
CHECK AND TEST
Purpose 1. Assembly Inspection 2. Installation/Erection Inspection 3. Witness of Final Test
LOCATION : DOC. NO. :
PROJECT : REPORT NO. :
DATE : DWG REF. NO. :
ITEM : STATUS : 1. COMPLETED 2. INCOMPLETED
Brand Martin
5.1 Primery Belt Cleaner Type :
SIGNATURE :
Page 3 / 19
COMMISSIONING INSPECTION,
CHECK AND TEST
Purpose 1. Assembly Inspection 2. Installation/Erection Inspection 3. Witness of Final Test
LOCATION : DOC. NO. :
PROJECT : REPORT NO. :
DATE : DWG REF. NO. :
ITEM : STATUS : 1. COMPLETED 2. INCOMPLETED
Temperatur ( ˚C ) Condition
2. PULLEY Fixed Floating Remarks
Bearing Bearing OK /Not OK
2.1 Drive Pulley
Inspection Result
FUNCTION AND VISUAL
Notes and Observations
CHECK OK NOT OK
3. IDLERS
3.1 Carry idler
3.2 Return idler
SIGNATURE :
Page 4 / 19
COMMISSIONING INSPECTION,
CHECK AND TEST
Purpose 1. Assembly Inspection 2. Installation/Erection Inspection 3. Witness of Final Test
LOCATION : DOC. NO. :
PROJECT : REPORT NO. :
DATE : DWG REF. NO. :
ITEM : STATUS : 1. COMPLETED 2. INCOMPLETED
2. COMMISSIONING
2.1. IDLER
A. CONVEYOR DATA
BELT WIDTH : 1400 mm BELT SPEED : m/s DESIGN CAP. : 600 TPH
BELT TYPE : EP320, CLASS M x 4 Plies
SIGNATURE :
Page 5 / 19
COMMISSIONING INSPECTION,
CHECK AND TEST
Purpose 1. Assembly Inspection 2. Installation/Erection Inspection 3. Witness of Final Test
LOCATION : DOC. NO. :
PROJECT : REPORT NO. :
DATE : DWG REF. NO. :
ITEM : STATUS : 1. COMPLETED 2. INCOMPLETED
B. IDLER DATA
SPACIN
DESCRIPTIO
NO QTY ANGLE ROLLER DIA ROLLER LENGTH G
N
(nos) (mm) LEFT CENTER RIGHT (mm)
1 CARRY 36 0 127 200
2 RETURN 3 0 127 1500
Remarks:
...............................................................................................................................................................................
...............................................................................................................................................................................
...............................................................................................................................................................................
...............................................................................................................................................................................
SIGNATURE :
Page 6 / 19
COMMISSIONING INSPECTION,
CHECK AND TEST
Purpose 1. Assembly Inspection 2. Installation/Erection Inspection 3. Witness of Final Test
LOCATION : DOC. NO. :
PROJECT : REPORT NO. :
DATE : DWG REF. NO. :
ITEM : STATUS : 1. COMPLETED 2. INCOMPLETED
Remarks:
...............................................................................................................................................................................
...............................................................................................................................................................................
...............................................................................................................................................................................
...............................................................................................................................................................................
SIGNATURE :
Page 7 / 19
COMMISSIONING INSPECTION,
CHECK AND TEST
Purpose 1. Assembly Inspection 2. Installation/Erection Inspection 3. Witness of Final Test
LOCATION : DOC. NO. :
PROJECT : REPORT NO. :
DATE : DWG REF. NO. :
ITEM : STATUS : 1. COMPLETED 2. INCOMPLETED
D. FIGURE
LS RS LS R
S
Drive/Head Drive/He
Pulley
C/L Pulley ad Pulley
Remarks:
...............................................................................................................................................................................
...............................................................................................................................................................................
...............................................................................................................................................................................
...............................................................................................................................................................................
2.2 PULLEY
A. CONVEYOR DATA
BELT WIDTH : 1400 mm BELT SPEED : m/s DESIGN CAP. : 600 TPH
BELT TYPE : EP 320, Class M x 4 Plies
B. PULLEY DATA
SIGNATURE :
Page 8 / 19
COMMISSIONING INSPECTION,
CHECK AND TEST
Purpose 1. Assembly Inspection 2. Installation/Erection Inspection 3. Witness of Final Test
LOCATION : DOC. NO. :
PROJECT : REPORT NO. :
DATE : DWG REF. NO. :
ITEM : STATUS : 1. COMPLETED 2. INCOMPLETED
Remarks:
...............................................................................................................................................................................
...............................................................................................................................................................................
...............................................................................................................................................................................
...............................................................................................................................................................................
C. INSPECTION, CHECK, AND TEST
Remarks:................................................................................................................................................................
...............................................................................................................................................................................
...............................................................................................................................................................................
...............................................................................................................................................................................
INSPECTED, CHECKED, AND TESTED BY :
-----------------------------------------------------------------
RESULT : 1. ACCEPTED 2. ACCEPTED WITH COMMENT 3. REJECTED
SIGNATURE :
Page 9 / 19
COMMISSIONING INSPECTION,
CHECK AND TEST
Purpose 1. Assembly Inspection 2. Installation/Erection Inspection 3. Witness of Final Test
LOCATION : DOC. NO. :
PROJECT : REPORT NO. :
DATE : DWG REF. NO. :
ITEM : STATUS : 1. COMPLETED 2. INCOMPLETED
D. FIGURE
GAP
SIGNATURE :
Page 10 / 19
RHS
COMMISSIONING INSPECTION,
CHECK AND TEST
Purpose 1. Assembly Inspection 2. Installation/Erection Inspection 3. Witness of Final Test
LOCATION : DOC. NO. :
PROJECT : REPORT NO. :
DATE : DWG REF. NO. :
ITEM : STATUS : 1. COMPLETED 2. INCOMPLETED
FIGURE 1B.
CONVEYOR C/L
SIGNATURE :
PULLEY SHAFT
FIGURE 3. Elevation
E. COMMISSIONING CHECK
SIGNATURE :
Page 12 / 19
COMMISSIONING INSPECTION,
CHECK AND TEST
Purpose 1. Assembly Inspection 2. Installation/Erection Inspection 3. Witness of Final Test
LOCATION : DOC. NO. :
PROJECT : REPORT NO. :
DATE : DWG REF. NO. :
ITEM : STATUS : 1. COMPLETED 2. INCOMPLETED
Remarks: .............................................................................................................................................................
...............................................................................................................................................................................
...............................................................................................................................................................................
...............................................................................................................................................................................
.................
A. SPLICE
Date of splice made ............................................... Date of Manufacturer ..................................................
Jointing kit supplied by .......................................... Type of wire splice used ..............................................
Length ....................... M Angle .......................... o
B. AMBIENT CONDITION
Hot .................. Warm ...................... Moderate .................... Cool ....................... Cold ......................
Site shaded ? ............................................................. Dust blowing ...............................................................
Remarks .............................................................................................................................................................
..............................................................................................................................................................................
C. CURING
INSPECTED, CHECKED, AND TESTED BY :
-----------------------------------------------------------------
RESULT : 1. ACCEPTED 2. ACCEPTED WITH COMMENT 3. REJECTED
SIGNATURE :
Page 13 / 19
COMMISSIONING INSPECTION,
CHECK AND TEST
Purpose 1. Assembly Inspection 2. Installation/Erection Inspection 3. Witness of Final Test
LOCATION : DOC. NO. :
PROJECT : REPORT NO. :
DATE : DWG REF. NO. :
ITEM : STATUS : 1. COMPLETED 2. INCOMPLETED
D. ALIGNMENT
The most important feature of the join apart from its strength is the alignment. Alignment must be check
both at the start of splice preparation and just before curing starts:
Length over which allignment checked .................... m
Alignment check must be done over three belt width or one splice length each side of the extrimles at the
splice, whichever is longest.
Remarks:
...............................................................................................................................................................................
...............................................................................................................................................................................
...............................................................................................................................................................................
...............................................................................................................................................................................
2.4 COUPLING
SIGNATURE :
Page 14 / 19
COMMISSIONING INSPECTION,
CHECK AND TEST
Purpose 1. Assembly Inspection 2. Installation/Erection Inspection 3. Witness of Final Test
LOCATION : DOC. NO. :
PROJECT : REPORT NO. :
DATE : DWG REF. NO. :
ITEM : STATUS : 1. COMPLETED 2. INCOMPLETED
A. Alignment
Both the drive and driven shafts are to be rotated together to each position at which reading are taken, for
axial and angular alignment
B. Axial Alignment
Readings taken with indicator bottom on:
Driver : ................................................................. Driven : ...............................................................................
C. Pre-Commissioning
Check for any damage .......................................... Is installation complete ? ....................................................
Are installation and connecting bolt tight ? .......... Does coupling assembly rotate freely by hand ? ................
Is adequate guard securely fitted ? ....................... Is coupling free of foreign material ? .................................
D. Commissioning
Abnormal feature when coupling accelerated and decelerated under no load and loaded conditionings .........
...............................................................................................................................................................................
Remarks ...............................................................................................................................................................
...............................................................................................................................................................................
A. Pre-Commissioning
Coupling securely fitted ...................................... Coupling filled with oil type & grade .................................
Oil fill angle ............................................ Degrees Oil fill quantity ...................................................................
Oil level correct ................................................... Coupling free to rotate ......................................................
SIGNATURE :
Page 15 / 19
COMMISSIONING INSPECTION,
CHECK AND TEST
Purpose 1. Assembly Inspection 2. Installation/Erection Inspection 3. Witness of Final Test
LOCATION : DOC. NO. :
PROJECT : REPORT NO. :
DATE : DWG REF. NO. :
ITEM : STATUS : 1. COMPLETED 2. INCOMPLETED
B. COMMISSIONING CHECK
SIGNATURE :
Page 16 / 19
COMMISSIONING INSPECTION,
CHECK AND TEST
Purpose 1. Assembly Inspection 2. Installation/Erection Inspection 3. Witness of Final Test
LOCATION : DOC. NO. :
PROJECT : REPORT NO. :
DATE : DWG REF. NO. :
ITEM : STATUS : 1. COMPLETED 2. INCOMPLETED
2 Test # 2
3.2. Temperature
SIGNATURE :
Page 17 / 19
COMMISSIONING INSPECTION,
CHECK AND TEST
Purpose 1. Assembly Inspection 2. Installation/Erection Inspection 3. Witness of Final Test
LOCATION : DOC. NO. :
PROJECT : REPORT NO. :
DATE : DWG REF. NO. :
ITEM : STATUS : 1. COMPLETED 2. INCOMPLETED
Remarks/any finding
: ........................................................................................................................................................................................
............................................................................................................................................................................................
............................................................................................................................................................................................
...........................................................................................................................................
SIGNATURE :
Page 18 / 19
COMMISSIONING INSPECTION,
CHECK AND TEST
Purpose 1. Assembly Inspection 2. Installation/Erection Inspection 3. Witness of Final Test
LOCATION : DOC. NO. :
PROJECT : REPORT NO. :
DATE : DWG REF. NO. :
ITEM : STATUS : 1. COMPLETED 2. INCOMPLETED
SIGNATURE :
Page 19 / 19