Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

PROJECT SCHEDULE

DATE OF REVIEW REQUIREMENTS


 Area of specialization (topic)
Pre Review  To submit Confirmation letter
27.07.21 to 01.08.21  Meet concern guide with topics for Mini project
 Discuss about Organizational analysis and Business plan
 Project topic
 Introduction
 Objectives of the study
First Review  Scope of the study
13.08.21  Need for the study
 Statement of the problem
 Industry profile
 Company profile
 Questionnaire
 Definitions & theories if any used
Second Review  Design of the study
27.08.21  Research Methodology
 Data Collection
 Data Analysis
04.09.21  Submission of Rough Draft

06.09.21  Submission of Fair Draft


08.09.21 & 09.09.21  Mock Viva Voce

NOTE: 1. Each Review carries 20 marks


2. Attendance is Mandatory
3. Guides should be consulted before taking any decisions.

INTERNSHIP CO-ORDINATOR HOD PRINCIPAL

You might also like