Pted Line Schedule
Frequency Month :
No Area Cleaning Activity PIC
Current Mass
Condition Production
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
General cleaning floor, skid, conveyor rail, oil
WBS pain, wall, window glass and safety fence, Wooju Daily Daily
safety net, etc
1
General cleaning floor and wall including
Preparation Wooju Daily Daily
wall tank side outer all area at PTED
2
General cleaning all floor, top casing, deck,
Wooju Daily Daily
3 wall