Client: PHC
Contact Person:
Organization:
Organizational Role:
Contact Number:
Contact Email:
Development Type :
✓ New Facility
Upgrade / Rehab
Others (Specify):
Overview / Instructions:
Revision of Area Plan (see MBT sketch), Revision of PFD (no pre-cholrination and reaction loop).
Specify the media and pebbles in the tank
No
SMDJO0476 (Revision)
No
After client expressed interest in Bauer's proposal, Bauer took the initiative to revisit the design
and improve it to come up with a better layout
https://app.clickup.com/3638916/v/dc/3f1m4-1370/3f1m4-334 1/4
4/9/2020 PHC Project Quantum Design, Supply, Installation, Testing and Commissioning of 980 GPM Water Treatment Facility of the PHCI Ne…
Detailed
For Accreditation
Coordination
Project
Permits
Construction
Fabrication
Coordination
As-Built
Billing
O&M Manual
Client Requirement
Acceptance
Pre-Bid Meeting
Clarification Meeting
Coordination Meeting
Sampling
System Audit
Troubleshooting
Pilot Testing
Simulation
To Be Accompanied By:
Meeting Place:
Meeting Time:
Vehicle To Use:
Documentation
https://app.clickup.com/3638916/v/dc/3f1m4-1370/3f1m4-334 2/4
4/9/2020 PHC Project Quantum Design, Supply, Installation, Testing and Commissioning of 980 GPM Water Treatment Facility of the PHCI Ne…
✓ Drawings
Estimates
Schedules
Methodologies
Others (Specify):
Battery Limit:
Invert Elevation:
Electromech
Tank Sizes
Area Allocation
Brochures
Geotech Report
Client Concept
As-Built Drawings
Client Correspondence