Download as pdf or txt
Download as pdf or txt
You are on page 1of 85

For Approval

C-2 31 May, 17 For Approval DS, LEE JK, CHOI DH, SONG
C-1 17 May, 17 For Approval DS, LEE JK, CHOI DH, SONG
C 18 Mar, 17 For Approval DS, LEE JK, CHOI DH, SONG
B 04 Nov, 16 For Approval DS, LEE JK, CHOI DH, SONG
A 18 Apr, 16 For Approval HS, LEE JK, CHOI DH, SONG
REV DATE DESCRIPTION DSGN CHKD APPD
PROJECT TITLE :

SARULLA GEOTHERMAL POWER PROJECT

OWNER :

CONTRACTOR :

DESIGNED BY DATE TITLE :

DS, LEE 31 May, 17


CHECKED BY DATE NIL-Piping Material Specification
JK, CHOI 31 May, 17
APPROVED BY DATE DOCUMENT NUMBER REV
DH, SONG 31 May, 17 7-090-L03-00001 C-2
SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :1 of 85

TABLE OF CONTENTS

1.0 SCOPE ............................................................................................................. 2

2.0 CODES & STANDARDS ............................................................................... 3

3.0 GENERAL REQUIREMENT ....................................................................... 4

4.0 ABBREVIATIONS ....................................................................................... 11

5.0 INDEX OF PIPING MATERIAL CLASSIFICATION ............................ 13

6.0 PIPING MATERIAL CLASSIFICATION SHEETS. ............................... 14

7.0 VENT & DRAIN ........................................................................................... 67

8.0 PRESSURE & TEMPERATURE INSTRUMENT CONNECTION ...... 68

9.0 THERMOWELL INSTALLATION ........................................................... 69


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :2 of 84

1.0 SCOPE

1.1 This specification covers the basic requirements for the design, material and installation of the
piping system in Sarulla Geothermal Power Project.

1.2 This specification shall be applied only to piping materials indicated on P&I diagrams. Piping
systems, however, which are furnished as a regular part of proprietary or standard equipment (or
package facility) will be in accordance with the equipment supplier's standard. Accordingly those
will not be included in this spec.

1.3 When the piping is connected to equipment, this specification shall be applied to the extent
indicated below;

1) Companion flanges, gaskets, bolts and nuts at the equipment nozzle.

2) Companion flanges, gaskets, bolts and nuts at the matching point between the piping
furnished as a part of equipment by its supplier and that provided by purchaser.

3) First block valve with companion flange, gaskets, bolts and nuts in the instrument
connecting line.

4) Companion flanges, gaskets, bolts and nuts for relief valves.

Note) "First block valve" in instrument connecting line as used herein shall mean the
nearest valve to a line to which the instrument is connected.

1.4 This piping material classification may not be applied to specially designed companion flanges,
gaskets, bolts and nuts at the equipment nozzles.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :3 of 84

2.0 CODES & STANDARDS

2.1 Design, fabrication, testing and inspection of piping materials shall be accomplished in
accordance with the following listed Codes and Standards including revision and addenda in
effect at the time of execution of the contract.
The contractor can select any code and standard, at his discretion, from the list of the standards.

ANSI : American National Standards Institute


API : American Petroleum Institute
ASME : American Society of Mechanical Engineers
ASME B31.1 : Power Piping
ASME B31.3 : Process Piping
ASTM : American Society of Testing & Materials
AWS : American Welding Society

BS : British Standards
CODAP : Code Francais de Construction des Appareils a pression
CSA : Canadian Standards Association
DIN : Deutsche Industries Normen
EN : Euronorms
ISO : International Organization for Standardization
JIS : Japan Industrial Standard
NFPA : National Fire Protection Association
NZS : New Zealand Standards
OSHA : Occupational Safety and Health Administration Standard
SSPC : The Society for Protective Coatings

AWWA : American Water Works Association


UL : Underwriter's Laboratories, Inc
FM : Factory Mutual
Local Standard

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :4 of 84

2.2 Unless otherwise indicated, all piping design is in accordance with the requirements of ASME
B31.3 Process Piping for binary and oil system and ASME B31.1 Power Piping for other metal
piping.

2.3 All valves and pipe fittings shall be as indicated in ASTM code or approved equivalent.

3.0 GENERAL REQUIREMENT

3.1 Unit
Unless otherwise specified, SI units shall be applied as the measurement system for the drawings
and documents to be submitted.

3.2 Standard Material


Material for individual piping components shall conform to the requirements of the applicable
Codes and Standards in para. 2.0.

3.3 Pipes

1) Dimensions of steel pipes shall be in accordance with the following standard.

ASME B36.10M : Welded and Seamless Steel Pipe


ASME B36.19M : Stainless Steel Pipe
ASTM D3350 : Standard Specification for Polyethylene Plastic Pipe and
Fittings Materials
2) The pipe diameters shall be calculated considering the following maximum allowable
speeds (Except for lines that are in intermittent service and do not operate frequently.) :

• HP steam (from well pad to the plant) 40 m/s


• LP steam (steam turbine exhaust lines) 75 m/s
• Brine lines (pump suction) 1.5 m/s
(pump discharge) 3.0 m/s
• Cooling water lines (pump suction) 1.5 m/s
(pump discharge) 5.0 m/s
• Compressed air (under normal operating condition) 30 m/s
(for piping below 150mm diameter) 20 m/s
(for piping below 100mm diameter) 15 m/s

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :5 of 84

3) The thicknesses of the pipes shall be calculated following the ASME requirements;
Corrosion allowance for piping used for two phase fluid, steam and brine shall be 3.0
mm.
With exception of small bore piping with corrosion allowance may be reduced as
Feasible in the market.

• No allowance for stainless steel and HDPE piping

4) The pipe materials for each system are as follows;

Motive Fluid C.S


Two phase fluid C.S
Steam C.S
Brine C.S
Condensate S.S 316L
Compressed air (downstream of Air Receiver) S.S 304
Fire fighting (A/G) Wet Pipe* C.S
Fire fighting (A/G) Dry Pipe* C.S + Gal’v
Fire fighting (U/G) HDPE
Cooling water C.S
Raw water (A/G) C.S
Raw water (U/G) HDPE
Sampling S.S 316L
Diluted H2SO4 dosing C.S PTFE Liner
Concentrated H2SO4 dosing C.S

*According to NFPA 13, HDEC shall be applied in dry galvanized pipe to prevent corbon steel pipe
corrosion for fire fighting system.
(NFPA13.8.4.7.2.1 : Where steel pipe is used in preaction and dry pipe systems, piping materials shall be
limited to internally galvanized steel.)
Galvanized Material (Pipe , fitting and flange) shall be used for above ground (A/G) dry pipe.
(e.g. discharge part of deluge valve for fire water spray system )
Within the Carbon Steel(AG), other than the dry galvanized pipe is the wet pipe(black carbon steel).

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :6 of 84

5) The following nominal pipe size shall not be used except where required to connect to
equipment.

3/8"
1-1/4" (except where connecting to equip. which has these size connections.)
3-1/2"
5"

6) Where relevant, formed bends and offsets shall be used and be cold formed in a
standard pipe bending machine. They shall have an inside radius of not less than five (5)
times the outside diameter of the pipe. Unless otherwise specified.

7) All buried metallic pipes shall be provide with cathodic protection except stainless steel
pipe.

3.4 Fittings

1) All pipe work shall be joined by means of an approved type of welded joints, threaded
connections may be used for special valves and the connections of the Fire water, Raw
water system.

Fitting construction shall be as follows.


- 2” and smaller : socket weld / screwed
- 2 1/2” and larger : butt weld
- HDPE : fusion weld

2) All threaded connections shall have taper threads in accordance with ASME B1.20.1
Pipe Threads, General Purpose.

3) Long radius elbows shall be generally used for all piping, unless otherwise noted.

4) Dimension of steel piping shall be as follows :

ASME B16.3 : Malleable Iron Threaded Fittings.


ASME B16.9 : Factory-Made Wrought Buttwelding Fittings.
ASME B16.11 : Forged Fittings, Socket-Welding and Threaded.
ASME B16.25 : Buttwelding Ends.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :7 of 84

ASME B16.28 : Wrought Steel Buttwelding Short Radius Elbows and Returns.
ASTM D3350 : Standard Specification for Polyethylene Plastic Pipe and Fittings
Materials.
AWWA C606 : Standard for Grooved and Shouldered Joints.

5) All non-ferrous fittings shall be fully rated for the same internal pressure as the
matching pipe.

3.5 Grooved End Fittings

1) Fittings shall be cast of ductile iron conforming to ASTM A-536, forged steel conforming
to ASTM A-234, or fabricated from Std. Wt. Carbon Steel pipe conforming to ASTM A-
53, Grade B. Fittings provided with an alkyd enamel finish.

2) Couplings with gasket to fit the grooves shall be used to join grooved pipe or grooved
fitting.

3.6 Flanges

1) Flange ratings, facing, face finish and manufacture shall be as per ASME B16.5 unless
otherwise specified.
Flanges 26” & above size shall be manufactured as per ASME B16.47 Series A.

2) The bore of welding neck flanges shall correspond to the inside diameter of the
connecting pipe or fitting.

3) Unless otherwise specified, all flanges shall be of Raised Face (RF), designed according
to ASME B16.5.

4) All class ASME 150 to 600 flanges shall have raised face with serrated spiral finished
unless otherwise specified. The resultant surface finish shall have 125 AARH.

5) Dimension shall be as follows :

ASME B16.1 : ASME Gray Iron Classes 25, 125, and 250
ASME B16.5 : ASME Class 150 to 2500(24” and smaller)
ASME B16.47 : ASME Class 150 to 900(26” and larger)
ASTM D3350 : Standard Specification for Polyethylene Plastic Pipe and Fittings
Materials

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :8 of 84

3.7 Gaskets

1) Limitation dimensions of gaskets other than Ring Joint suitable for ASME flanges shall
be in accordance with ASME B16.5, Nonmandatory Appendices B.

2) Gasket dimensions for flanges larger than 24” shall be in accordance with the flange
standard specified in the individual specification class.

3) Dimensions shall be as follows :

ASME B16.20 : Metallic Gaskets for Pipe Flanges - Ring-Joint, Spiral-Wound,


and Jacketed
ASME B16.21 : Nonmetallic Flat Gaskets for Pipe Flanges

3.8 Bolts and Nuts for Flange

1) Bolting materials shall be as specified in each piping material classification.

2) Unless otherwise indicated in the piping material classes, bolts and nuts shall be hot dip
galvanized as per ASTM A153 or Equivalent applicable standards Except stainless steel
bolts and nuts.

3) The bolts shall have full-length thread and the tips shall be flat finished.

4) Bolts and nuts with flat and spring washers shall be free burrs, seams, laps, loose scale,
irregular surface and any defects affecting their service ability.

5) Dimensional requirements of bolts and nuts for flange connection shall be in accordance
with ASME B16.5 Table 1C as follows ;

ASME B18.2.1 : Square and Hex Bolts and Screws (Inch Series)
ASME B18.2.2 : Square and Hex Nuts (Inch Series)

3.9 Valves

1) Valves shall be designed in accordance with international standard such as ;

ASME B16.10 : Face to Face and End-to-End Dimensions of Valves


ASME B16.25 : Buttwelding ends
ASME B16.34 : Valves Flanged, Threaded and Welding End
API 598 : Valve Inspection and Testing
API 6D : Specification for Pipeline Valves
API 607 : Fire Test for Soft-Seated Quarter-turn Valves

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :9 of 84

2) Valve assemblies shall be designed for the pressure and temperature ratings of the class
specified in this specification and Valve List.

3) Valve stem, packing, trim and bonnet gasket material shall be applied with the
requirement of applicable code unless otherwise specified.

4) The manually operated valves in the sizes and rating shown below shall be provided
with a gear operator.

ASME Gate Globe Plug / Ball Butterfly


Rating Valve Valve Valve Valve
150 12” and Larger 12” and Larger 10” and Larger 8” and Larger
300 12” and Larger 12” and Larger 8” and Larger 8” and Larger
600 10” and Larger 8” and Larger 8” and Larger -

5) Gear operating type


- Gate, Globe Valves : Bevel-gear type
- Ball, Plug, Butterfly Valves : Worm-gear type

6) Unless otherwise specified, socket weld & screw bores shall conform to ASME B16.11.

7) All valves shall be fitted with outside screw spindles unless otherwise specified or
approved.

8) Hydrostatic testing for valves shall be in accordance with ASME B16.34.

9) The internal diameter of all valves at the end adjacent to the pipe work shall be the same
as the internal diameter of the connection pipe.

10) All valves shall be fitted with indicators to identify open or shut position of the valves.
In the case of valves being fitted with extended spindles, indicators shall be fitted to
both the extended spindles and to the valve spindles.

11) Valves shall have butt weld or flanged ends in accordance with the piping system
requirements. All valves and pipe fittings material shall be as indicated in ASTM code
or approved equivalent.

12) Valves flanges or couplings shall be as specified and match those specified for the
piping installation.

13) Valve shall be of a standard and quality which ensures satisfactory operation consistent
with geothermal industry practice.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :10 of 84

14) Extension spindles shall be supplied wherever necessary to achieve the specified
operating requirements.

15) As a general rule, the hand wheels shall be arranged to turn in a clockwise direction to
close the valve. The direction of rotation for opening and closing shall be indicated on
the hand wheels.

16) The material of any valve or fitting installed in the pipeline shall be of the grade equal to
or better than the pipeline material.

17) Large bore gate valves, unless otherwise specified shall be of the rising spindle type.

18) All non-return valves shall be of the type that will minimize shock.

19) Weatherproof protection covers shall be provided for all spindles of manual operated
valve locate in outdoor.

3.10 Weld End Preparation for Piping

1) End preparation for buttweld shall be in accordance with ASME B16.25, as applicable.

2) Ends of pipe for socket welding shall be square cut.

3.11 Grooved End Preparation for Steel Piping

1) Grooves are rolled or cut into the ends of the pipe.

2) The plain end type shall be in accordance with ASTM A523 or applicable standards.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :11 of 84

4.0 ABBREVIATIONS

Abbreviations used in this specification are defined in table of "ABBREVIATION" as follows.

CODE ABBREVIATION DESCRIPTION


AG Above Ground
A A/S Alloy Steel
ATM. Atmospheric
BALL Ball Type
BB Bolted Bonnet
BC Bolted Cap
B BE Beveled End
BHN Brinell Hardness Number
BN Buna-N Lining
BW Butt Weld
C.A Corrosion Allowance
CALC Calculation
CL Class
C CPLG Coupling
CPVC Chlorinate Polyvinyl Chloride
CR Centering Ring
C/S Carbon Steel
DIM. Dimension
D DU-PL-SPL Dual Plate Spring Loaded Type
DN Nominal Diameter
EC External Coating
EFW Electric Fusion Welding
EL Epoxy Lined
E
ERW Electric Resistance Welding
EXT External
EW External Wrapping
FB Full Bore
FF Full Face (Flat Face)
FLG Flange
FLGD Flanged
F
F to F Face to Face
FP Full Port
FR Flat Ring
FV Full Vacuum
GALV. Galvanized
G GR Grade
GRP Glass-Fiber Reinforced Thermosetting-Resin Plastic

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :12 of 84

CODE ABBREVIATION DESCRIPTION


Brinell Hardness number symbol per
HB
ASTM E10 (formerly BHN)
HD Hardened
H HDPE High Density Poly Ethylene
HEX NUT Hexagonal Nut
HF Hardfaced
H. HEX. NUT Heavy Hexagonal Nut
ID Inside diameter
ISNS Inside Screw and Non-Rising Stem
I
ISRS Inside Screw and Rising Stem
IR Inner ring
LIFT Lift type
L
LJ Lapped (Loose) Joint
M. BOLT Machine Bolt
M M&F Large Male and Female Face
MJ Mechanical Joint
OD Outside Diameter
OR Outer Ring
O
OSNB Outside Screw Non-Bonnet
OS & Y Outside Screw and Yoke Type
PB Pressure Seal Bonnet
PC Pressure Seal Cap
PCCP Prestressed Concrete Cylinder Pipe
P
PE Plain End
PMC Piping Material Class
PVC Polyvinyl Chloride
UPVC Unplasticized Polyvinyl Chloride
RF Raised Face
RL Rubber Lined
RP Reducing Port
R
RTJ Ring Type Joint Face
RTFE Reinforced PTFE
RTR Reinforced Thermosetting Resin
SB Screwed Bonnet
SC Screwed Cover
SE Screwed Socket End
SCRD Screwed
SCH Schedule
SMLS Seamless
S SO Slip-On Weld
S/S Stainless Steel
SW Socket Weld
SWB Seal Welded Bonnet
SWING Swing Type
STL Stellited
T or THK. Thickness (in, mm)
T THRD Threaded
TE Threaded End
U UG Under Ground
W Welded Product
WC Welded Cover
W
WN Welding Neck
WB Welded Bonnet
Y Y TYPE Y-Type / Y-Pattern

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :13 of 84

5.0 INDEX OF PIPING MATERIAL CLASSIFICATION

Oper. Oper. Design Design Flange


Service C.A. Temp. Temp.
Spec. Service Material Pressure Pressure Rating
ID [mm]
[Bara] [℃] [Bara] [℃] [#]

A1 Motive Fluid MF 0.75 C.S 24.8 177.0 27.0 180.0 300


A2 Motive Fluid MF 0.75 C.S 9.0 40.0 11.0 60.0 150
Geothermal Fluid
B GF 3.0 C.S - - 40.0 240.0 300
(Two Phase)
C L.P Brine BR 3.0 C.S 9.4 90 13.5 120 150
D1 Instrument Air IA 0.0 S.S 304 9.7 46.0 11.5 60.0 150
D2 Wet compressed Air IA 0.75 C.S 9.7 46.0 11.5 60.0 150
E1 Lube Oil LO 0.0 S.S, ATM 49.0 ATM 79.0 150
E2 Lube Oil LO 3.0 C.S, ATM 49.0 ATM 79.0 150
C.S 10.0 25.0 13.8 45.0 150
F1 Fire Fighting (A/G) FW 0.75
(GALV.) 16.5 25.0 18.0 45.0 150
F2 Fire Fighting (U/G) FW 0.0 HDPE 10.0 25.0 13.8 45.0 150
C.S
F3 Fire Fighting (A/G) FW 0.75 10.0 25.0 13.8 45.0 150
(GALV.)
G Nitrogen gas NI 0.75 C.S 1.5 40.0 9.0 200.0 150
BR 20.3 193.0 21.0 220.0
H H.P Brine 3.0 C.S 300
BC 21.5 124.0 25.0 175.0
I1 Raw Water (A/G) RW 0.75 C.S 6.0 40.0 7.0 54.0 150
I2 Raw Water (U/G) RW 0.0 HDPE 6.0 40.0 7.0 54.0 150
J M.P Brine BC 3.0 C.S 12.0 187.2 21.0 220 600
BR 12.0 187.2 21.0 220.0 300
K M.P Brine 3.0 C.S
BC 12.9 132.6 15.0 190.0 300
L Cooling Water CW 1.5 C.S 5.3 45.0 7.0 70.0 150
Geothermal Fluid
M1 GF 3.0 C.S 12.2 195.1 31.0 250.0 600
(Two Phase)
Geothermal Fluid
M2 GF 3.0 C.S 18.2 212.4 40.0 265.0 900
(Two Phase)
Geothermal Fluid
M3 GF 3.0 C.S 38.0 212.4 40.0 265.0 600
(Two Phase)
N L.P Steam ST 0.0 S.S 316L ATM 107.0 ATM 162.0 150
O Sampling SP 0.0 S.S 316L 22.0 211.0 28.4 212.9 300
14.4 80.3 28.3 105.0 300
P H.P Condensate CO 0.0 S.S 316L 31.6 80.0 40.0 105.0 300
10.8 183.3 17.0 210.0 300
1.3 106.2 3.6 140.0 150
Q L.P Steam ST 3.0 C.S
1.6 137.7 3.0 185.0 150

R L.P Condensate CO 0.0 S.S 316L 2.4 130.0 3.5 145.0 150
12.0 187.2 19.0 215.0
S H.P Steam ST 3.0 C.S 300
11.3 185.3 13.0 240.0
Diluted H2SO4 C.S
T SFA 1.5 20.0 80.0 25.5 105.0 300
dosing (PTFE Lined)
W3 Waste Water (U/G) WW 0.0 HDPE 3.1 23.0 4.0 30.0 150
X2 Sewage Water (U/G) SE 0.0 HDPE 6.0 40.0 7.0 54.0 150

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :14 of 84

5.1 Definition of System

Service Description Operation Design Remark


Fluid From ~ to Press. Temp. Press. Temp.
(Bara) (deg C) (Bara) (deg C)
H.P Brine High Pressure Steam Separator ~ Reflect the condition of
20.3 193.0 21.0 220.0
Brine(BR) Main Brine Collector Brine Booster Pump
(For WJP-1N) Discharge

High Pressure Re-Injection Booster


20.1 124.0 21.58 175
Brine+Condensate Pump ~ Reinjection
(BC) Well(NIL3N)

High Pressure Reinjection Header ~


21.5 123.8 25.0 175
Brine+Condensate Reinjection Well
(BC) (WJR-2)
M.P Brine Steam Separator ~ Reflect the condition of
Brine Main Brine Collector 12.0 187.2 21.0 220.0 Brine OEC Outlet
(BR) (For NIL-1N&2N)

Brine+Condensate Brine OEC 12.9 132.6 15.0 190.0


(BC) ~ RBP Inlet
L.P Brine Low Pressure Brine Pond Reflect the condition of
Brine ~ Brine Well NIL 3 9.4 90 13.5 120 Brine Pond Transfer
Pump (HOLD)
H.P High Pressure Bottoming OEC ~ M.P 14.4 80.3 28.3 105.0 Reflect the condition of
Condensate Condensate Brine Line Condensate Pump
Discharge of
Bottoming OEC

Steam Scrubbing Pump 31.6 80.0 40.0 105 Reflect the condition of
~ Injection Nozzle Scrubbing Pump
Discharge

Steam Purifier 10.8 183.3 17.0 210.0 Reflect the condition of


~ Purifier Flash Drum Steam purifier
condensate
L.P Low Pressure Condensate Pond Reflect the condition of
Condensate Condensate Transfer Pump 2.4 130 3.5 145 Condensate Pond
~Cond Well NIL 3 Transfer Pump
(HOLD)
H.P Steam High Pressure Steam Separator ~ Reflect the revised
12.0 187.2 19.0 215.0
Steam Main Steam Collector condition of Steam
Separator Outlet
Main Steam Collector
11.3 185.3 13.0 240.0
~ Steam Turbine
L.P Steam Low Pressure STG Exhaust 1.3 106.2 3.6 140 Reflect the condition of
Steam ~ Bottoming OEC, Exhaust Steam

H.P Bypass system ~ 1.6 137.7 3.0 185 Reflect the condition of
Spray Nozzle H.P Steam Bypass
Steam

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :15 of 84

6.0 PIPING MATERIAL CLASSIFICATION SHEETS

Each piping material class indicates the maximum design pressures and temperatures for which
the piping material classes may be used. For each piping system, or portion thereof, a piping
material class shall be selected which provides material appropriate for the service conditions and
which has a maximum allowable design pressure and temperature which equals or exceeds the
design pressure and temperature of the line for which it is to be used.

Please refer to attached piping material classification sheets paged from 16 thru 76.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :16 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTS-EF1

1/2" - 2" Globe VGS-EF1

Check

1/2" - 2" Lift VCS-EF1-L

2 1/2" - 6" Swing VCF-GS2-S

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 80 ASTM A53 GR B, PE.

2 1/2" - 12" Pipe ERW SCH. STD ASTM A53 GR B, BE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A105, ASME B16.11.

2 1/2" - 12" Wrought Welded Steel Butt Weld Type ASTM A234 GR WPB, ASME B16.9.
Thickness to Match Pipe.

Flanges

1/2" - 2" Forged Steel, 300# RF, Socket Weld ASTM A105, ASME B16.5.

2 1/2" - 12" Forged Steel, 300# WN RF, ASTM A105, Bore to Match Pipe ASME B16.5.

ACCESSORIES

Bolting
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets
Raised Face 300#, 4.5mm THK. Spiral Wound 316SS with Graphite Filler,
304SS Inner Ring & Carbon Steel (with Galvanize) Outer Ring.

Note
1.Underground piping shall be used Coal tar epoxy coated pipe or Polyken tape.

SERVICE
Motive Fluid (MF)

RATING

CONSTRUCTION CORROSION ALLOWANCE SPEC. Carbon St. Class 300# RF

1/2" - 2" Socketweld 0.75 mm A1 Design Temp. 180˚C

2 1/2" - 12" Buttweld Design Pressure 27.0 Bar Absolute

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :17 of 84

BRANCH CONNECTIONS CLASS A1

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3" 4" 6" 8" 10" 12"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" S S S S S T

4" S S S S S R T

6" S S S S S R R T

8" S S S S S W R R T

10" S S S S S W R R R T

12" S S S S S W W R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.
4. W = Weldolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :18 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTS-EF1

1/2" - 2" Globe VGS-EF1


Check

1/2" - 2" Lift VCS-EF1-L


2 1/2" - 6" Swing
VCF-HC2-S

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 80 ASTM A53 GR B, PE.

2 1/2" - 12" Pipe ERW SCH. STD ASTM A53 GR B, BE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A105, ASME B16.11.

2 1/2" - 12" Wrought Welded Steel Butt Weld Type ASTM A234 GR WPB, ASME B16.9.
Thickness to Match Pipe.

Flanges

1/2" - 2" Forged Steel, 150# RF, Socket Weld ASTM A105, ASME B16.5

2 1/2" - 12" Forged Steel, 150# WN RF, ASTM A105, Bore to Match Pipe ASME B16.5.

ACCESSORIES

Bolting
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets
Raised Face 150#, 4.5mm THK. Spiral Wound 316SS with Graphite Filler,
304SS Inner Ring & Carbon Steel (with Galvanize) Outer Ring.
Note
1.Underground piping shall be used PE coated pipe or Polyken tape.

SERVICE
Motive Fluid (MF)

RATING

CONSTRUCTION CORROSION ALLOWANCE SPEC. Carbon St. Class 150# RF

1/2" - 2" Socketweld 0.75 mm A2 Design Temp. 60˚C

2 1/2" - 12" Buttweld Design Pressure 11.0 Bar Absolute

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :19 of 84

BRANCH CONNECTIONS CLASS A2

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3" 4" 6" 8" 10" 12"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" S S S S S T

4" S S S S S R T

6" S S S S S R R T

8" S S S S S W R R T

10" S S S S S W R R R T

12" S S S S S W W R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.
4. W = Weldolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :20 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTS-EF1

2 1/2” - 24” Gate VTF-GC2

1/2" - 2" Globe VGS-EF1

Check

1/2" - 2" Lift VCS-EF1-L

2 1/2" - 18" Swing VCF-GC2-S

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 80 ASTM A53 GR B, PE.

2 1/2" - 16" Pipe ERW SCH. STD ASTM A53 GR B, BE.

18" - 24" Pipe ERW SCH. XS ASTM A53 GR B, BE

26" - 34" Pipe EFW SCH.XS ASTM A672 GR B70 CL12, BE.

36" Pipe EFW 15.88mm ASTM A672 GR B70 CL12, BE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A105, ASME B16.11.

2 1/2" - 24" Wrought Welded Steel Butt Weld Type ASTM A234 GR WPB, ASME B16.9.
Thickness to Match Pipe.

26" - 36" Wrought Welded Steel Butt Weld Type ASTM A234 GR WPB, ASME B16.9.
Thickness to Match Pipe.

Flanges

1/2" - 2" Forged Steel, 300# RF Socket Weld, ASTM A105 ASME B16.5.

2 1/2" - 24" Forged Steel, 300# WN RF, ASTM A105, Bore to Match.
Pipe ASME B16.5.

26" - 36" Forged Steel, 300# WN RF, ASTM A105, Bore to Match.
Pipe ASME B16.47 Flange series A.

ACCESSORIES

Bolting
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv. SERVICE
Geothermal Fluid (GF)
Gaskets

Raised Face 300#, 4.5mm THK. Spiral Wound 304SS with Graphite Filler,
304SS Inner Ring & Carbon Steel (with Galvanize) Outer Ring.. RATING

Carbon St. Class 300# RF


CONSTRUCTION CORROSION ALLOWANCE SPEC.
Design Temp. 240˚C
1/2" - 2" Socketweld 3.0 mm B
Design Pressure 40.0 Bar Absolute
2 1/2" - 36" Buttweld

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :21 of 84

BRANCH CONNECTIONS CLASS B

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" 36"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" S S S S S T

4" S S S S S R T

6" S S S S S R R T

8" S S S S S W R R T

10" S S S S S W R R R T

12" S S S S S W W R R R T

14" S S S S S W W R R R R T

16" S S S S S W W R R R R R T

18" S S S S S W W W R R R R R T

20" S S S S S W W W R R R R R R T

24" S S S S S W W W W R R R R R R T

36" S S S S S W W W W W W W R R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.
4. W = Weldolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :22 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTS-EF1

2 1/2" - 12 " Gate VTF-GC2

Check

Lift VCS-EF1-L
1/2" - 2"

2 1/2" - 12" Swing VCF-GC2-S

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 80 ASTM A53 GR B, PE.

2 1/2" - 12" Pipe ERW SCH. STD ASTM A53 GR B, BE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A105, ASME B16.11.

2 1/2" - 12" Wrought Welded Steel Butt Weld Type ASTM A234 GR WPB, ASME B16.9.
Thickness to Match Pipe.

Flanges

1/2" - 2" Forged Steel, 150# RF Socket weld, ASTM A105, ASME B16.5

2 1/2" - 12" Forged Steel, 150# WN RF, ASTM A105, Bore to Match
Pipe ASME B16.5.

ACCESSORIES

Bolting
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets
Raised Face 150#, 4.5mm THK. Spiral Wound 304SS with Graphite Filler,
304SS Inner Ring & Carbon Steel (with Galvanize) Outer Ring.

SERVICE
L.P Brine (BR)

RATING

CONSTRUCTION CORROSION ALLOWANCE SPEC. Carbon St. Class 150# RF

1/2" - 2" Socketweld 3.0 mm C Design Temp. 120˚C

2 1/2" - 12" Buttweld Design Pressure 13.5 Bar Absolute

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :23 of 84

BRANCH CONNECTIONS CLASS C

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3" 4" 6" 8" 10" 12"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" S S S S S T

4" S S S S S R T

6" S S S S S R R T

8" S S S S S W R R T

10" S S S S S W R R R T

12" S S S S S W W R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.
4. W = Weldolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :24 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

Gate VTS-EF5
1/2" - 2"

Gate VTF-HC8
2 1/2” - 4”

1/2" - 2" Globe VGS-EF5

2 1/2” - 4” Globe VGF-HC8

Check
VCS-EF5-L
1/2" - 2" Lift
VCF-HC8-S
2 1/2" - 6" Swing

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 40S A312-TP304 , PE.

2 1/2" - 6" Pipe Welded SCH. 10S A312-TP304 , BE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A182-F304, ASME B16.11.

1/2" - 2" Welded Butt Weld, ASTM A403-WP304, ASME B16.9 Thickness to match pipe.

(For Yard Pipe)

2 1/2" - 6" Welded Butt Weld, ASTM A403-WP304, ASME B16.9 Thickness to match pipe.

Flanges

1/2" - 2" Forged Steel, 150# Socket Weld, ASTM A182-F304, ASME B16.5

2 1/2" - 6" Forged Steel, 150# WN RF, ASTM A182-F304, Bore to Match Pipe ASME B16.5

ACCESSORIES

Bolting
Stud Bolt Austenitic ASTM A193, GR B8 w/nuts A194, GR 8.

Gaskets
Raised Face 150#, 4.5mm THK. Spiral Wound 316SS with Graphite Filler,

316SS Inner & Outer Ring.

Note
1.Underground piping shall be used Coal tar epoxy coated pipe or Polyken tape.
SERVICE
Instrument Air (IA)

RATING

304 SS Class 150# RF


CONSTRUCTION CORROSION ALLOWANCE SPEC.
Design Temp. 60˚C
1/2" - 2" Socketweld 0.0 mm D1
Design Pressure 11.5 Bar Absolute
1/2" - 2" Buttweld (For Yard Pipe)

2 1/2" - 6" Buttweld

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :25 of 84

BRANCH CONNECTIONS CLASS D1

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3" 4" 6"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" S S S S S T

4" S S S S S R T

6" S S S S S R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.
4. W = Weldolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :26 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTS-EF1

2 1/2" - 4" Gate VTF-HC2

1/2" - 2" Globe VGS-EF1

1/2" - 2" Ball VRF-EF1

2 1/2" - 4" Ball VRF-HF1

Check

1/2" - 2" Lift VCS-EF1-L


2 1/2" - 6" Swing VCW-HC2-D

PIPE & FITTINGS


Pipe
1/2" - 2" Pipe SMLS SCH. 80 ASTM A53 GR B, PE.
2 1/2" - 12" Pipe SMLS SCH. STD ASTM A53 GR B, BE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A105, ASME B16.11.
2 1/2" - 12" Wrought Welded Steel Butt Weld Type ASTM A234 GR WPB, ASME B16.9.
Thickness to Match Pipe.

Flanges
1/2" - 2"
Forged Steel, 150# RF, Socket Weld ASTM A105, ASME B16.5
2 1/2" - 12"
Forged Steel, 150# WN RF, ASTM A105, Bore to Match Pipe ASME B16.5.

ACCESSORIES

Bolting
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets
Raised Face 150#, 4.5mm THK. Spiral Wound 316SS with Graphite Filler,
304SS Inner Ring & Carbon Steel (with Galvanize) Outer Ring..

SERVICE
Wet Compressed Air
(From Discharge of Air Compressor To Inlet
of Wet Air Receiver)

RATING

CONSTRUCTION CORROSION ALLOWANCE SPEC. Carbon St. Class 150# RF

1/2" - 2" Socketweld 0.75 mm D2 Design Temp. 60˚C

2 1/2" - 12" Buttweld Design Pressure 11.5 Bar Absolute

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :27 of 84

BRANCH CONNECTIONS CLASS D2

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3" 4" 6" 8" 10" 12"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" S S S S S T

4" S S S S S R T

6" S S S S S R R T

8" S S S S S W R R T

10" S S S S S W R R R T

12" S S S S S W W R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.
4. W = Weldolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :28 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTS-EF8

1/2" - 2" Globe VGF-HC11

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 40S A312-TP316L , PE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A182-F316L, ASME B16.11.

ACCESSORIES

Bolting
" Stud Bolt Austenitic ASTM A193, GR B8 w/nuts A194, GR 8.

Gaskets
Raised Face 150#, 4.5mm THK. Spiral Wound 316SS with Graphite Filler,

304SS Inner & Outer Ring.

SERVICE
Lube Oil (LO)

RATING

CONSTRUCTION CORROSION ALLOWANCE SPEC. 316L SS Class 150# RF

1/2" - 2" Socketweld 0.0 mm E1 Design Temp. 79˚C

Design Pressure ATM

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :29 of 84

BRANCH CONNECTIONS CLASS E1

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :30 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTS-EF1

2 1/2" - 4" Gate VTF-GC2

Check

Lift VCS-EF1-L
1/2" - 2"

2 1/2" - 4" Swing VCF-GC2-S

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 80 ASTM A53 GR B, PE.

2 1/2" - 4" Pipe ERW SCH. STD ASTM A53 GR B, BE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A105, ASME B16.11.

2 1/2" - 4" Wrought Welded Steel Butt Weld Type ASTM A234 GR WPB, ASME B16.9.
Thickness to Match Pipe.

Flanges

1/2" - 2" Forged Steel, 150# RF Socket weld, ASTM A105, ASME B16.5

2 1/2" - 4" Forged Steel, 150# WN RF, ASTM A105, Bore to Match
Pipe ASME B16.5.

ACCESSORIES

Bolting
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets
Raised Face 150#, 4.5mm THK. Spiral Wound 304SS with Graphite Filler,
304SS Inner Ring & Carbon Steel (with Galvanize) Outer Ring.

SERVICE
Lube Oil (LO)

RATING

CONSTRUCTION CORROSION ALLOWANCE SPEC. Carbon St. Class 150# RF

1/2" - 2" Socketweld 3.0 mm E2 Design Temp. 79˚C

2 1/2" - 4" Buttweld Design Pressure ATM

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :31 of 84

BRANCH CONNECTIONS CLASS E2

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3" 4"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" S S S S S T

4" S S S S S R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :32 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTT-EF1

2 1/2" - 12" Gate VTF-HC2

1/2" - 2" Globe VGT-EF1

Check

1/2" - 2" Lift VCT-EF1-L

2 1/2" - 12" Swing VCW-HC2-D

PIPE & FITTINGS

Pipe
Note 2
1/2" - 2" Pipe SMLS SCH. 80 ASTM A53 GR B, PE.
Note 2
2 1/2" - 12" Pipe ERW SCH. 40 ASTM A53 GR B, BE.

Fittings
Note 2
1/2" - 2" Forged Steel 3000# SCRD type end ASTM A105, ASME 16.11.
Note 2
2 1/2" - 12" A234, GR WPB, Grooved Ells, Tees, Reducers and Split Ring Metallic Coupling
Joint sets (with elastomeric gasket, ASTM A-536, AWWA C606, securing bolt and
nuts etc.), ASME B16.9.

Flanges
Note 2
1/2" - 2" Forged Steel, 150# FF, SCRD, ASTM A105, ASME B16.5.

2 Note 2
2 1/2" - 12" Forged Steel Grooved Type end, 150#, ASTM A105, Bore to Match Pipe ASME B16.5.

ACCESSORIES

Bolting

Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets
150# Non-asbestos Compressed Fiber Ring per ASME B16.21 3.2mm TH’K.
SERVICE
Note: Fire Fighting (FW) (A/G) with Fire Gas
1. Material of securing bolt and nut shall be same material bolt & nuts.

2. Galvanized Material (Pipe , fitting and flange) shall be used for


above ground (A/G) pipe and fire gas pipe
RATING

Carbon St. Class 150# FF


CONSTRUCTION CORROSION ALLOWANCE SPEC.
Design Temp. 45˚C
1/2" - 2" Threaded 0.75 mm F1
Design Pressure 18.0 Bar Absolute (Gas)
2 1/2" - 12" Grooved Joint
Design Pressure 13.8 Bar Absolute (Water)

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :33 of 84

BRANCH CONNECTIONS CLASS F1

RUN
BRANCH
SIZE SIZE
1/2" 3/4" l" 1 1/2" 2" 2 1/2" 3" 4" 6" 8" 10"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

2 1/2" M M M M R T

3" M M M M M M T

4" O O M M M M R T

6" O O M M M M M M T

8" O O O O O O M R R T

10" O O O O O O M R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. M = Mechanical -T
4. O = Threadolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :34 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

N/A

PIPE & FITTINGS

Pipe
1/2" - 3" High Density Polyethylene DR 11 (PN16) HDPE ASTM PE 4710. Note 1, 3

4" - 12" High Density Polyethylene DR 11 (PN16) HDPE ASTM PE 4710. Note 1, 3

Fittings

1/2" - 2" High Density Polyethylene ASTM PE 4710, Butt Fusion Type. Note 2, 3

2 1/2" - 12" High Density Polyethylene ASTM PE 4710, Butt Fusion Type. Note 2, 3

Flanges

1/2" - 3" ASME 150# DR 11 HDPE ASTM PE 4710 with Ductile Iron Metal Ring,
Lap Joint FF.

4" - 12" ASME 150# DR 11 HDPE ASTM PE 4710 with Ductile Iron Metal Ring,
Lap Joint FF.

ACCESSORIES

Bolting
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets
150# Non-asbestos Compressed Fiber Ring per ASME B16.21 3.2mm TH’K.

Note :
1. The wall thickness based on the pressure – temperature rating for HDPE pipes.
HDPE pipe thickness shall be follow as per vendor’s standard.
2. Thickness shall be equal or greater than pipe.
3. The method of joint shall be welded as per vendor’s standard & welding procedure.
SERVICE
Fire Fighting (FW) (U/G)

RATING

CONSTRUCTION CORROSION ALLOWANCE SPEC. HDPE 150# FF


1/2" - 2" Socket Fusion Welding 0.0 mm F2 Design Temp. 45˚C
2 1/2" - 12" Butt Fusion Welding Design Pressure 13.8 Bar Absolute

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :35 of 84

BRANCH CONNECTIONS CLASS F2

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3" 4" 6" 8" 10" 12"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" R R R R R T

4" R R R R R R T

6" R R R R R R R T

8" R R R R R R R R T

10" R R R R R R R R R T

12" R R R R R R R R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :36 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTT-EF1

2 1/2" - 12" Gate VTF-HC2

1/2" - 2" Globe VGT-EF1

Check

1/2" - 2" Lift VCT-EF1-L

2 1/2" - 12" Swing VCW-HC2-D

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 80 ASTM A53 GR B, PE.

2 1/2" - 12" Pipe ERW SCH. 40 ASTM A53 GR B, BE. Note 2,3

Note 2,3
Fittings

1/2" - 2" Forged Steel 3000# SCRD type end ASTM A105, ASME 16.11.

Note 2,3
2 1/2" - 12" Carbon Steel ERW Buttweld Type ASTM A234 GR WPBW, ASME B16.9 Thickness to
Match Pipe
Note 2,3
Flanges
1/2" - 2" Forged Steel, 150# FF, SCRD, ASTM A105, ASME B16.5.
2 Note 2,3
2 1/2" - 12" Forged Steel 150# WN FF, ASTM A105, Bore to Match Pipe ASME B16.5.

ACCESSORIES Note 2,3

Bolting

Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets
150# Non-asbestos Compressed Fiber Ring per ASME B16.21 3.2mm TH’K.

Note:
1. Material of securing bolt and nut shall be same material bolt & nuts.

2. Galvanized Material (Pipe , fitting and flange) shall be used for


SERVICE
above ground (A/G) pipe.
Fire Fighting (FW) (A/G)
3. All Field welded joints shall be coated with carbon zinc after
welding.
RATING

Carbon St. Class 150# FF


CONSTRUCTION CORROSION ALLOWANCE SPEC.
Design Temp. 45˚C
1/2" - 2" Threaded 0.75 mm F3
Design Pressure 13.8 Bar Absolute
2 1/2" - 12" buttweld

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :37 of 84

BRANCH CONNECTIONS CLASS F3

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 2 1/2" 3" 4" 6" 8" 10"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

2 1/2" S S R R R T

3" S S S R R R T

4" S S S R R R R T

6" S S S S S R R R T

8" S S S S S W W R R T

10" S S S S S W W R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee
3. S = Sockolet / Half coupling / Threadolet.
4. W = Weldolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :38 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 80 ASTM A53 GR B, PE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A105, ASME B16.11.

Flanges

1/2" - 2" Forged Steel, 150# RF Socket weld, ASTM A105, ASME B16.5

ACCESSORIES

Bolting
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets
Raised Face 150#, 4.5mm THK. Spiral Wound 304SS with Graphite Filler,
304SS Inner Ring & Carbon Steel (with Galvanize) Outer Ring.

SERVICE
Nitrigen Gas (NI)

RATING

CONSTRUCTION CORROSION ALLOWANCE SPEC. Carbon St. Class 150# RF

1/2" - 2" Socketweld 0.75 mm G Design Temp. 200.0˚C

Design Pressure 9.0 Bar Absolute

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :39 of 84

BRANCH CONNECTIONS CLASS G

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :40 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTS-EF1

2 1/2" - 36 " Gate VTF-GC2

1/2" - 2" Globe VGS-EF1

2 1/2" - 24" Globe VGF-GC2

Butterfly VBF-GC2
2 1/2" - 20"

Check
VCS-EF1-L
1/2" - 2" Lift
VCF-GC2-S
2 1/2" - 18" Swing

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 80 ASTM A53 GR B, PE.

2 1/2" - 16" Pipe ERW SCH. STD ASTM A53 GR B, BE.

18" - 24" Pipe ERW SCH. XS ASTM A53 GR B, BE.

26" - 38" Pipe EFW SCH. XS ASTM A672 GR B70 CL12, BE.

40" - 48" Pipe EFW 15.88mm ASTM A672 GR B70 CL12, BE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A105, ASME B16.11.

2 1/2" - 24" Wrought Welded Steel Butt Weld Type ASTM A234 GR WPB, ASME B16.9.
Thickness to Match Pipe.

26" - 48" Wrought Welded Steel Butt Weld Type ASTM A234 GR WPB, ASME B16.9.
Thickness to Match Pipe.

Flanges

1/2" - 2" Forged Steel, 300# RF Socket weld, ASTM A105, ASME B16.5

2 1/2" - 24" Forged Steel, 300# WN RF, ASTM A105, Bore to Match
Pipe ASME B16.5.

26" - 48" Forged Steel, 300# WN RF, ASTM A105, Bore to Match
Pipe ASME B16.47 Flange series A.

ACCESSORIES
SERVICE
Bolting H.P Brine (BC,BR)
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets
Raised Face 300#, 4.5mm THK. Spiral Wound 304SS with Graphite Filler, RATING
304SS Inner Ring & Carbon Steel (with Galvanize) Outer Ring.
CONSTRUCTION CORROSION ALLOWANCE SPEC. Carbon St. Class 300# RF

1/2" - 2" Socketweld 3.0 mm H Design Temp. 225˚C

2 1/2" - 36" Buttweld Design Pressure 25.0 Bar Absolute

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :41 of 84

BRANCH CONNECTIONS CLASS H

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" 26" 30" 36"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" S S S S S T

4" S S S S S R T

6" S S S S S R R T

8" S S S S S W R R T

10" S S S S S W R R R T

12" S S S S S W W R R R T

14" S S S S S W W R R R R T

16" S S S S S W W R R R R R T

18" S S S S S W W W R R R R R T

20" S S S S S W W W R R R R R R T

24" S S S S S W W W W R R R R R R T

26" S S S S S W W W W W R R R R R R T

30" S S S S S W W W W W W R R R R R R T

36" S S S S S W W W W W W W R R R R R R T

48” S S S S S W W W W W W W W R R R R R R

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.
4. W = Weldolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :42 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTS-EF1

1/2" - 10" Gate VTF-HC2

1/2" - 2" Globe VGS-EF1

Check

1/2" - 2" Lift VCS-EF1-L

2 1/2" - 10" VCW-HC2-D


DU-PL-SPL

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 80 ASTM A53 GR B, PE.

2 1/2" - 10" Pipe ERW SCH. STD ASTM A53 GR B, BE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A105, ASME B16.11.

2 1/2" - 10" Wrought Welded Steel Butt Weld Type ASTM A234 GR WPB, ASME B16.9
Thickness to Match Pipe.

Flanges

1/2" - 2" Forged Steel, 150# RF, Socket Weld ASTM A105, ASME B16.5.

2 1/2" - 10" Forged Steel, 150# WN RF, ASTM A105, Bore to Match Pipe ASME B16.5.

ACCESSORIES

Bolting
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets
Raised Face 150#, Non-asbestos Compressed Fiber Ring per ASME B16.21 3.2mm TH’K.

SERVICE
Raw Water (RW) (A/G)

RATING

Carbon St. Class 150# RF


CONSTRUCTION CORROSION ALLOWANCE SPEC.
Design Temp. 54˚C
1/2" - 2" Socketweld 1.5 mm I1
Design Pressure 7.0 Bar Absolute
2 1/2" - 10" Buttweld

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :43 of 84

BRANCH CONNECTIONS CLASS I1

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 2 1/2" 3" 4" 6" 8" 10"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

2 1/2" S S S S S T

3" S S S S S R T

4" S S S S S R R T

6" S S S S S R R R T

8" S S S S S W W R R T

10" S S S S S W W R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.
4. W = Weldolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :44 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

N/A

PIPE & FITTINGS

Pipe

1/2" - 3" High Density Polyethylene DR 11 ASTM PE 4710. Note 1, 3

4" - 12" High Density Polyethylene DR 11 ASTM PE 4710. Note 1, 3

Fittings
Note 2, 3
1/2" - 2" High Density Polyethylene ASTM PE 4710, Butt Fusion Type

2 1/2" - 12" Note 2, 3


High Density Polyethylene ASTM PE 4710, Butt Fusion Type

Flanges

1/2" - 3" ASME 150# DR 11 HDPE ASTM PE 4710with Ductile Iron Metal Ring,
Lap Joint FF.

4" - 12" ASME 150# DR 11 HDPE ASTM PE 4710with Ductile Iron Metal Ring,
Lap Joint FF.

ACCESSORIES

Bolting
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets
150# Non-asbestos Compressed Fiber Ring per ASME B16.21 3.2mm TH’K.

Note :
1. The wall thickness based on the pressure – temperature rating for HDPE pipes.
HDPE pipe thickness shall be follow as per vendor’s standard.
2. Thickness shall be equal or greater than pipe.
3. The method of joint shall be welded as per vendor’s standard & welding procedure.

SERVICE
Raw Water (RW) (U/G)

RATING

HDPE 150# FF
CONSTRUCTION CORROSION ALLOWANCE SPEC.
Design Temp. 54˚C
1/2" - 2" Socket Fusion Welding 0.0 mm I2
Design Pressure 7.0 Bar Absolute
2 1/2" - 12" Butt Fusion Welding

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :45 of 84

BRANCH CONNECTIONS CLASS I2

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3" 4" 6" 8" 10"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" R R R R R T

4" R R R R R R T

6" R R R R R R R T

8" R R R R R R R R T

10" R R R R R R R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :46 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTS-EF1

2 1/2" - 3" Gate VTF-EC2

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 80 ASTM A53 GR B, PE.

2 1/2" - 3" Pipe ERW SCH. STD ASTM A53 GR B, BE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A105, ASME B16.11.

2 1/2" - 3" Wrought Welded Steel Butt Weld Type ASTM A234, GR WPB, ASME B16.9
Thickness to Match Pipe.

Flanges

1/2" - 2" Forged Steel, 600# RF Socket Weld, ASTM A105, ASME B16.5.

2 1/2" - 3" Forged Steel, 600# WN RF, ASTM A105, Bore to Match Pipe ASME B16.5.

3 1/8 Forged Steel, 3000# (3000 psi) WN RF, ASTM A105, Bore to Match Pipe API 6A

ACCESSORIES

Bolting
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets
Raised Face 600#, 4.5mm THK. Spiral Wound 304SS with Graphite Filler,
304SS Inner Ring & Carbon Steel (with Galvanize) Outer Ring..

SERVICE
M.P Brine (BC)

RATING

CONSTRUCTION CORROSION ALLOWANCE SPEC. Carbon St. Class 600# RF

1/2" - 2" Socketweld 3.0 mm J Design Temp. 220˚C

2 1/2" – 3 1/8" Buttweld Design Pressure 21.0 Bar Absolute

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :47 of 84

BRANCH CONNECTIONS CLASS J

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" S S S S S T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :48 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTS-EF1

2 1/2" - 42 " Gate VTF-GC2

1/2" - 2" Globe VGS-EF1

2 1/2" - 24 " Globe VGF-GC2

2 1/2" - 20" Butterfly VBF-GC2

Check

1/2" - 2" Lift VCS-EF1-L

2 1/2" - 18" Swing VCF-GC2-S

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 80 ASTM A53 GR B, PE.

2 1/2" - 20" Pipe ERW SCH. STD ASTM A53 GR B, BE.

22” - 24” Pipe ERW SCH. XS ASTM A53 GR B, BE.

26” - 30” Pipe EFW SCH. STD ASTM A672 GR B70 CL12, BE.

32" - 36" Pipe EFW SCH.XS ASTM A672 GR B70 CL12, BE.

38” Pipe EFW 11.13mm ASTM A672 GR B70 CL12, BE.

40” - 42" Pipe EFW 11.91mm ASTM A672 GR B70 CL12, BE.

44” - 48" Pipe EFW 14.27mm ASTM A672 GR B70 CL12, BE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A105, ASME B16.11.

2 1/2" - 24" Wrought Welded Steel Butt Weld Type ASTM A234, GR WPB, ASME B16.9
Thickness to Match Pipe.

26" - 48" Wrought Welded Steel Butt Weld Type ASTM A234, GR WPB, ASME B16.9
Thickness to Match Pipe.

Flanges

1/2" - 2" Forged Steel, 300# RF Socket Weld, ASTM A105, ASME B16.5.

2 1/2" - 24" Forged Steel, 300# WN RF, ASTM A105, Bore to Match
Pipe ASME B16.5.

26" - 48" Forged Steel, 300# WN RF, ASTM A105, Bore to Match SERVICE
Pipe ASME B16.47 Flange series A. M.P Brine (BC,BR)

ACCESSORIES
RATING
Bolting
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.
Carbon St. Class 300# RF
Gaskets
Design Temp. 220˚C
Raised Face 300#, 4.5mm THK. Spiral Wound 304SS with Graphite Filler,
304SS Inner Ring & Carbon Steel (with Galvanize) Outer Ring. Design Pressure 21.0 Bar Absolute
CONSTRUCTION CORROSION ALLOWANCE SPEC.
1/2" - 2" Socketweld 3.0 mm K

2 1/2" - 48" Buttweld

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :49 of 84

BRANCH CONNECTIONS CLASS K

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" 26" 28" 30" 36" 42" 48"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" S S S S S T

4" S S S S S R T

6" S S S S S R R T

8" S S S S S W R R T

10" S S S S S W R R R T

12" S S S S S W W R R R T

14" S S S S S W W R R R R T

16" S S S S S W W R R R R R T

18" S S S S S W W W R R R R R T

20" S S S S S W W W R R R R R R T

24" S S S S S W W W W R R R R R R T

26" S S S S S W W W W W R R R R R R T

28" S S S S S W W W W W R R R R R R R T

30" S S S S S W W W W W W R R R R R R R T

36" S S S S S W W W W W W W R R R R R R R T

42" S S S S S W W W W W W W W W R R R R R R T

48" S S S S S W W W W W W W W W W R R R R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.
4. W = Weldolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :50 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

VTS-EF1
1/2" - 2" Gate
VTF-HC2
2 1/2" - 16" Gate
VGS-EF1
1/2" - 2" Globe
VGF-HC2
2 1/2" - 4" Globe
VBW-HC2
2 1/2" - 10" Butterfly
VBL-HC2
12" - 16" Butterfly

Check

1/2" - 2" Lift VCS-EF1-L

2 1/2" - 10" DU-PL-SPL VCW-HC2-D

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 80 ASTM A53, GR B, PE.

2 1/2" - 16" Pipe ERW SCH. STD ASTM A53, GR B,BE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A105, ASME B16.11.

2 1/2" - 16" Wrought Welded Steel Butt Weld Type ASTM A234 GR WPB, ASME B16.9
Thickness to Match Pipe.

Flanges

1/2" - 2" Forged Steel, 150# RF Socket Weld, ASTM A105, ANSI B16.5.

2 1/2" - 16" Forged Steel, 150# WN RF, ASTM A105, Bore to Match Pipe ASME B16.5.

ACCESSORIES

Bolting
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets
Raised Face 150#, Non-asbestos Compressed Fiber Ring per ASME B16.21 3.2mm TH’K.

SERVICE
Cooling Water (CW)

RATING

CONSTRUCTION CORROSION ALLOWANCE SPEC. Carbon St. Class 150# RF

1/2" - 2" Socketweld 1.5 mm L Design Temp. 70˚C

2 1/2" - 16" Buttweld Design Pressure 7.0 Bar Absolute

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :51 of 84

BRANCH CONNECTIONS CLASS L

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3" 4" 6" 8" 10" 12" 14" 16"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" S S S S S T

4" S S S S S R T

6" S S S S S R R T

8" S S S S S W R R T

10" S S S S S W R R R T

12" S S S S S W W R R R T

14" S S S S S W W R R R R T

16" S S S S S W W R R R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.
4. W = Weldolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :52 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTS-EF1

2 1/2" - 24 " Gate VTF-EC2

Globe VGS-EF1
1/2" - 2"

Check

1/2" - 2" Lift VCS-EF1-L

2 1/2" - 18" Swing VCF-EC2-S

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 80 ASTM A53 GR B, PE.

2 1/2" - 18" Pipe ERW SCH. XS ASTM A53 GR B, BE.

20" - 24" Pipe ERW SCH. 40 ASTM A53 GR B, BE.

26" - 40" Pipe EFW SCH. 19.05mm ASTM A672 GR B70 CL 12, BE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A105, ASME B16.11.

2 1/2" - 24" Wrought Welded Steel Butt Weld Type ASTM A234, GR WPB, ASME B16.9.
Thickness to Match Pipe.

26" - 40" Wrought Welded Steel Butt Weld Type ASTM A234, GR WPB, ASME B16.9.
Thickness to Match Pipe.

Flanges

1/2" - 2" Forged Steel, 600# RF Socket Weld, ASTM A105, ASME B16.5.

2 1/2" - 24" Forged Steel, 600# WN RF, ASTM A105, Bore to Match Pipe ASME B16.5.

10” - 12” Forged Steel, 600# WN RJT, ASTM A105, Bore to Match Pipe ASME B16.5.
(Well Head Only)

26" - 40" Forged Steel, 600# WN RF, ASTM A105, Bore to Match Pipe ASME B16.47
Flange series A.

ACCESSORIES

Bolting
SERVICE
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.
Geothermal Fluid (GF)
Gaskets

Raised Face 600#, 4.5mm THK. Spiral Wound 304SS with Graphite Filler,
304SS Inner Ring & Carbon Steel (with Galvanize) Outer Ring. RATING

CONSTRUCTION CORROSION ALLOWANCE SPEC. Carbon St. Class 600# RF

3/4" - 2" Socketweld 3.0 mm M1 Design Temp. 250˚C

2 1/2" - 40" Buttweld Design Pressure 31.0 Bar Absolute

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :53 of 84

BRANCH CONNECTIONS CLASS M1

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" 26" 28" 30" 36" 40"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" S S S S S T

4" S S S S S R T

6" S S S S S R R T

8" S S S S S W R R T

10" S S S S S W R R R T

12" S S S S S W W R R R T

14" S S S S S W W R R R R T

16" S S S S S W W R R R R R T

18" S S S S S W W W R R R R R T

20" S S S S S W W W R R R R R R T

24" S S S S S W W W W R R R R R R T

26" S S S S S W W W W W R R R R R R T

28" S S S S S W W W W W R R R R R R R T

30" S S S S S W W W W W W R R R R R R R T

36" S S S S S W W W W W W W R R R R R R R T

40" S S S S S W W W W W W W W R R R R R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.
4. W = Weldolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :54 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTS-DF1

2 1/2" - 3" Gate VTF-DC2

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 80 ASTM A53 GR B, PE.

2 1/2" - 3" Pipe ERW SCH. XS ASTM A53 GR B, BE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A105, ASME B16.11.

2 1/2" - 3" Wrought Welded Steel Butt Weld Type ASTM A234, GR WPB, ASME B16.9.
Thickness to Match Pipe.

Flanges

1/2" - 2" Forged Steel, 900# RF Socket Weld, ASTM A105, ASME B16.5.

2 1/2" - 3" Forged Steel, 900# WN RF, ASTM A105, Bore to Match Pipe ASME B16.5.

3 1/8 Forged Steel, 3000# (3000 psi) WN RF, ASTM A105, Bore to Match Pipe API 6A

ACCESSORIES

Bolting
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets

Raised Face 900#, 4.5mm THK. Spiral Wound 304SS with Graphite Filler,

304SS Inner Ring & Carbon Steel (with Galvanize) Outer Ring.

SERVICE
Geothermal Fluid (GF)

RATING

CONSTRUCTION CORROSION ALLOWANCE SPEC. Carbon St. Class 900# RF

3/4" - 2" Socketweld 3.0 mm M2 Design Temp. 265˚C

2 1/2" – 3 1/8" Buttweld Design Pressure 40.0 Bar Absolute

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :55 of 84

BRANCH CONNECTIONS CLASS M2

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" S S S S S T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :56 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTS-EF1

2 1/2" - 20 " Gate VTF-EC2

1/2" - 2" Globe VGS-EF1

PIPE & FITTINGS

Pipe

12” - 18”. Pipe ERW SCH. XS ASTM A53 GR B, BE.

20" Pipe SMLS SCH. 40 ASTM A53 GR B, PE. (From Production Well To MOV inlet only)

Fittings

12” - 20”. Wrought Welded Steel Butt Weld Type ASTM A234, GR WPB, ASME B16.9.
Thickness to Match Pipe.

Flanges

Forged Steel, 600# WN RJT, ASTM A105, Bore to Match Pipe ASME B16.5.
12” (Well Head Only)

14” - 20” Forged Steel, 600# WN RF, ASTM A105, Bore to Match Pipe ASME B16.5.

ACCESSORIES

Bolting
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets

Raised Face 600#, 4.5mm THK. Spiral Wound 304SS with Graphite Filler,
304SS Inner Ring & Carbon Steel (with Galvanize) Outer Ring.

SERVICE
Geothermal Fluid (GF)

RATING

CONSTRUCTION CORROSION ALLOWANCE SPEC. Carbon St. Class 600# RF

3/4" - 2" Socketweld 3.0 mm M3 Design Temp. 265˚C

2 1/2" - 40" Buttweld Design Pressure 40.0 Bar Absolute

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :57 of 84

BRANCH CONNECTIONS CLASS M3

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3" 4" 6" 8" 10" 12" 14" 16"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" S S S S S T

4" S S S S S R T

6" S S S S S R R T

8" S S S S S W R R T

10" S S S S S W R R R T

12" S S S S S W W R R R T

14" S S S S S W W R R R R T

16" S S S S S W W R R R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.
4. W = Weldolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :58 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTS-EF8

2 1/2" - 12 " Gate VTF-HC8

1/2" - 2" Globe VGS-EF8

Check

1/2" - 2" Lift VCS-EF8-L

2 1/2" - 12" Swing VCF-HC11-S

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 40S A312-TP316L, PE.

2 1/2" - 12” Pipe Welded SCH. 40S A312-TP316L , BE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A182-F316L, ASME B16.11.

2 1/2" - 12" Welded Butt Weld, ASTM A403-WP316L, ASME B16.9.


Thickness to match pipe.

Flanges

1/2" - 2" Forged Steel, 150# RF Socket Weld, ASTM A182-F316L, ASME B16.5.

2 1/2" - 12" Forged Steel, 150# WN RF, ASTM A182-F316L, Bore to Match Pipe ASME B16.5.

ACCESSORIES

Bolting
Stud Bolt Austenitic ASTM A193, GR B8 w/nuts A194, GR 8.

Gaskets

Raised Face 150#, 4.5mm THK. Spiral Wound 316SS with Graphite Filler,
316SS Inner & Outer Ring.

SERVICE
L.P Steam (ST)
(From Gland Steam Exhausters discharge
To O/S Ventilation)

RATING

CONSTRUCTION CORROSION ALLOWANCE SPEC. 316L SS Class 150# RF

1/2" - 2" Socketweld 0.0 mm N Design Temp. 162˚C

2 1/2" - 12" Buttweld Design Pressure ATM

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :59 of 84

BRANCH CONNECTIONS CLASS N

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 2 1/2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

2 1/2" S S S S S T

3" S S S S S R T

4" S S S S S R R T

6" S S S S S R R R T

8" S S S S S W W R R T

10" S S S S S W W R R R T

12" S S S S S W W W R R R T

14" S S S S S W W W R R R R T

16" S S S S S W W W R R R R R T

18" S S S S S W W W W R R R R R T

20" S S S S S W W W W R R R R R R T

24" S S S S S W W W W W R R R R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.
4. W = Weldolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :60 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

Gate VTS-EF8
1/2" - 2"

Globe VGS-EF8
1/2" - 2"

Check

1/2" - 2" Lift VCS-EF8-L

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 40S A182-TP316L , PE

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A182-F316L, ASME B16.11

Flanges

1/2" - 2" Forged Steel, 150# RF Socket Weld, ASTM A182-F316L, ASME B16.5.

ACCESSORIES

Bolting
Stud Bolt Austenitic ASTM A193, GR B8 w/nuts A194, GR 8

Gaskets

Raised Face 150#, 4.5mm THK. Spiral Wound 316SS with Graphite Filler,

316SS Inner & Outer Ring.

SERVICE
Sampling (SP)

RATING

316L SS Class 150# RF


CONSTRUCTION CORROSION ALLOWANCE SPEC.
Design Temp. 212.9˚C
1/2" - 2" Socketweld 0.0 mm O
Design Pressure 28.4 Bar Absolute

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :61 of 84

BRANCH CONNECTIONS CLASS O

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :62 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTS-EF8

2 1/2" - 12 " Gate VTF-GC11

1/2" - 2" Globe VGS-EF8

2 1/2" - 4" Butterfly VBF-GC11

Check

1/2" - 2" Lift VCS-EF8-L

2 1/2" - 12" Swing VCF-GC11-S

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 40S A312-TP316L, PE.

2 1/2" - 12” Pipe Welded SCH. 40S A312-TP316L , BE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A182-F316L, ASME B16.11.

1/2" - 2" Welded Butt Weld, ASTM A403-WP316L, ASME B16.9.


(For Yard Pipe)
Thickness to match pipe.

2 1/2" - 12" Welded Butt Weld, ASTM A403-WP316L, ASME B16.9.


Thickness to match pipe.

Flanges

1/2" - 2" Forged Steel, 300# RF Socket Weld, ASTM A182-F316L, ASME B16.5.

2 1/2" - 12" Forged Steel, 300# WN RF, ASTM A182-F316L, Bore to Match Pipe ASME B16.5.

ACCESSORIES

Bolting
Stud Bolt Austenitic ASTM A193, GR B8 w/nuts A194, GR 8.

Gaskets

Raised Face 300#, 4.5mm THK. Spiral Wound 316SS with Graphite Filler, SERVICE
H.P Condensate (CO)
316SS Inner & Outer Ring.
Note
1.Underground piping shall be used PE coated pipe or Polyken tape. RATING

CONSTRUCTION CORROSION ALLOWANCE SPEC. 316L SS Class 300# RF

1/2" - 2" Socketweld 0.0 mm P Design Temp. 210˚C

1/2" - 2" Buttweld Design Pressure 40 Bar Absolute

2 1/2" - 12" Buttweld

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :63 of 84

BRANCH CONNECTIONS CLASS P

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 2 1/2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

2 1/2" S S S S S T

3" S S S S S R T

4" S S S S S R R T

6" S S S S S R R R T

8" S S S S S W W R R T

10" S S S S S W W R R R T

12" S S S S S W W W R R R T

14" S S S S S W W W R R R R T

16" S S S S S W W W R R R R R T

18" S S S S S W W W W R R R R R T

20" S S S S S W W W W R R R R R R T

24" S S S S S W W W W W R R R R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.
4. W = Weldolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :64 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate

VTS-EF1
2 1/2" - 24" Gate
VTF-HC2
1/2" - 2" Globe
VGS-EF1
2 1/2" - 30" Butterfly
VBF-HC2
Check

1/2" - 2" Lift


VCS-EF1-L
2 1/2" - 24" Swing
VCF-HC2-S
26" - 60" DU-PL-SPL
VCF-HC2-D
PIPE & FITTINGS
Pipe

1/2" - 2" Pipe SMLS SCH. 80 ASTM A53 GR B, PE.

2 1/2" - 24" Pipe ERW SCH. STD ASTM A53 GR B, BE.

26" - 48" Pipe EFW SCH.STD ASTM A672 GR B70 CL12, BE.

52" - 60" Pipe EFW 9.53mm ASTM A672 GR B70 CL12, BE.

66” Pipe EFW 11.91mm ASTM A672 GR B70 CL12, BE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A105, ASME B16.11.

2 1/2" - 24" Wrought Welded Steel Butt Weld, ASTM A234 GR WPB, ASME B16.9.
Thickness to Match Pipe.

26" - 66" Wrought Welded Steel Butt Weld, ASTM A234 GR WPB, ASME B16.9.
Thickness to Match Pipe.

Flanges

1/2" - 2" Forged Steel, 150# RF Socket Weld, ASTM A105, ASME B16.5.

2 1/2" - 24" Forged Steel, 150# WN RF, ASTM A105, Bore to Match Pipe ASME B16.5.

26" - 60" Forged Steel, 150# WN RF, ASTM A105, Bore to Match Pipe ASME B16.47
Flange series A.
66” Forged Steel, 175# WN RF, ASTM A105, Bore to Match Pipe Taylor Flange.

ACCESSORIES SERVICE
Bolting L.P Steam (ST)
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets
RATING
Raised Face 150#, 4.5mm THK. Spiral Wound 304SS with Graphite Filler,
304SS Inner Ring & Carbon Steel (with Galvanize) Outer Ring. Carbon St. Class 150# RF
CONSTRUCTION CORROSION ALLOWANCE SPEC.
Design Temp.185˚C
1/2" - 2" Socketweld 3.0 mm Q
Design Pressure 3.6 Bar Absolute
2 1/2" - 60" Buttweld

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :65 of 84

BRANCH CONNECTIONS CLASS Q

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" 26" 28" 30" 36" 40" 42" 48" 52" 56" 60"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" S S S S S T

4" S S S S S R T

6" S S S S S R R T

8" S S S S S W R R T

10" S S S S S W R R R T

12" S S S S S W W R R R T

14" S S S S S W W R R R R T

16" S S S S S W W R R R R R T

18" S S S S S W W W R R R R R T

20" S S S S S W W W R R R R R R T

24" S S S S S W W W W R R R R R R T

26" S S S S S W W W W W R R R R R R T

28" S S S S S W W W W W R R R R R R R T

30" S S S S S W W W W W W R R R R R R R T

36" S S S S S W W W W W W W R R R R R R R T

40" S S S S S W W W W W W W W R R R R R R R T

42" S S S S S W W W W W W W W W R R R R R R R T

48" S S S S S W W W W W W W W W W R R R R R R R T

52" S S S S S W W W W W W W W W W W R R R R R R R T

56" S S S S S W W W W W W W W W W W W R R R R R R R T

60" S S S S S W W W W W W W W W W W W W W R R R R R R T

RUN RUN
SIZE BRANCH SIZE SIZE BRANCH SIZE

48 66 30 36 42

66 R T 72 R R R

REMARKS:
1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.
4. W = Weldolet.
5. For NPS 66” and larger, fitting will be welded type with 100% RT.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :66 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTS-EF8

2 1/2" - 12 " Gate VTF-HC11

1/2" - 2" Globe VGS-EF8

2 1/2" - 3" Globe VGF-HC11

Check

1/2" - 2" Lift VCS-EF8-L

2 1/2" - 12" Swing VCF-HC11-S

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 40S A312-TP316L , PE.

2 1/2" - 12” Pipe Welded SCH. 10S A312-TP316L , BE.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A182-F316L, ASME B16.11.

2 1/2" - 12" Welded Butt Weld, ASTM A403-WP316L, ASME B16.9


Thickness to match pipe.

Flanges

1/2" - 2" Forged Steel, 150# RF Socket Weld, ASTM A182-F316L, ASME B16.5.

2 1/2" - 12" Forged Steel, 150# WN RF, ASTM A182-F316L, Bore to Match Pipe ASME B16.5.

ACCESSORIES

Bolting
Stud Bolt Austenitic ASTM A193, GR B8 w/nuts A194, GR 8.

Gaskets

Raised Face 150#, 4.5mm THK. Spiral Wound 316SS with Graphite Filler,

316SS Inner & Outer Ring.

SERVICE
L.P Condensate (CO)

RATING

CONSTRUCTION CORROSION ALLOWANCE SPEC. 316L SS Class 150# RF

1/2" - 2" Socketweld 0.0 mm R Design Temp. 145˚C

2 1/2" - 12" Buttweld Design Pressure 3.5 Bar Absolute

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :67 of 84

BRANCH CONNECTIONS CLASS R

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 2 1/2" 3" 4" 6" 8" 10" 12"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

2 1/2" S S S S S T

3" S S S S S R T

4" S S S S S R R T

6" S S S S S R R R T

8" S S S S S W W R R T

10" S S S S S W W R R R T

12" S S S S S W W W R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.
4. W = Weldolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :68 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTS-EF1

2 1/2" - 56" Gate VTF-GC2

1/2" - 2" Globe VGS-EF1

2 1/2" - 24" Butterfly VBF-GC2

Check

1/2" - 2" Lift VCS-EF1-L

2 1/2" - 6" Swing VCF-GC2-S

PIPE & FITTINGS


Pipe

1/2" - 2" Pipe SMLS SCH. 80 ASTM A53 GR B, PE.

2 1/2" - 22" Pipe ERW SCH. STD ASTM A53 GR B, BE.

24" Pipe ERW SCH. XS ASTM A53 GR B, BE.

26" - 34" Pipe EFW SCH. STD ASTM A672 GR B70 CL12, BE.

36" - 40" Pipe EFW 10.31mm ASTM A672 GR B70 CL12, BE.

42" - 44" Pipe EFW 11.13mm ASTM A672 GR B70 CL12, BE.

46" Pipe EFW 11.91mm ASTM A672 GR B70 CL12, BE.

52” - 72” Pipe EFW 15.88mm ASTM A672 GR B70 CL12, BE

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A105, ASME B16.11.

2 1/2" - 24" Wrought Welded Steel Butt Weld Type ASTM A234 GR WPB, ASME B16.9.
Thickness to Match Pipe.

26" - 72" Wrought Welded Steel Butt Weld Type ASTM A234 GR WPB, ASME B16.9.
Thickness to Match Pipe.

Flanges

1/2" - 2" Forged Steel, 300# RF Socket Weld, ASTM A105, ASME B16.5.

2 1/2" - 24" Forged Steel, 300# WN RF, ASTM A105, Bore to Match Pipe ASME B16.5.

26" - 48" Forged Steel, 300# WN RF, ASTM A105, Bore to Match Pipe ASME B16.47
Flange series A.
72” Forged Steel, 350# WN RF, ASTM A105, Bore to Match Pipe Taylor Flange.

ACCESSORIES

Bolting SERVICE
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv. H.P Steam (ST)

Gaskets

Raised Face 300#, 4.5mm THK. Spiral Wound 304SS with Graphite Filler,
RATING
304SS Inner Ring & Carbon Steel (with Galvanize) Outer Ring.

CONSTRUCTION CORROSION ALLOWANCE SPEC. Carbon St. Class 300# RF

1/2" - 2" Socketweld 3.0 mm S Design Temp. 240˚C

2 1/2" - 48" Buttweld Design Pressure 19.0 Bar Absolute

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :69 of 84

BRANCH CONNECTIONS CLASS S

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 22" 24" 26" 28" 30" 34" 36" 40" 46" 60"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" S S S S S T

4" S S S S S R T

6" S S S S S R R T

8" S S S S S W R R T

10" S S S S S W R R R T

12" S S S S S W W R R R T

14" S S S S S W W R R R R T

16" S S S S S W W R R R R R T

18" S S S S S W W W R R R R R T

20" S S S S S W W W R R R R R R T

22" S S S S S W W W W R R R R R R T

24" S S S S S W W W W R R R R R R R T

26" S S S S S W W W W W R R R R R R R T

28" S S S S S W W W W W R R R R R R R R T

30" S S S S S W W W W W W R R R R R R R R T

34" S S S S S W W W W W W W R R R R R R R R T

36" S S S S S W W W W W W W R R R R R R R R R T

40" S S S S S W W W W W W W W R R R R R R R R R T

46" S S S S S W W W W W W W W W W R R R R R R R R T

60" S S S S S W W W W W W W W W W W W W W W W W R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.
4. W = Weldolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :70 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

1/2" - 2" Gate VTF-EF8

2 1/2" - 10 " Gate VTF-GC11

1/2" - 2" Globe VGF-EF8

Check

1/2" - 2" Lift VCF-EF8-L

2 1/2" - 6" Swing VCF-GC11-S

PIPE & FITTINGS

Pipe

1/2" - 2" Pipe SMLS SCH. 80 ASTM A53 GR B, PE, with with FEP Coating.

2 1/2" - 14" Pipe ERW SCH. STD ASTM A53 GR B, BE, with with FEP Coating.

Fittings

1/2" - 2" Forged Steel 3000# Socket Weld, ASTM A105, ASME B16.11, with FEP Coating.

2 1/2" - 14" Wrought Welded Steel Butt Weld Type ASTM A234 GR WPB, ASME B16.9,

with FEP Coating. Thickness to Match Pipe.

Flanges

1/2" - 2" Forged Steel, 300# RF Socket Weld, ASTM A105, ASME B16.5, with FEP Coating.

2 1/2" - 14" Forged Steel, 300# WN RF, ASTM A105, ASME B16.5, with FEP Coating.

ACCESSORIES

Bolting
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets

Raised Face 300#, 4.5mm THK. Spiral Wound 316SS with Graphite Filler,
316SS Inner Ring & Carbon Steel (with Galvanize) Outer Ring.

SERVICE
Diluted H2SO4 dosing (SFA)

RATING

CONSTRUCTION CORROSION ALLOWANCE SPEC. Carbon St. Class 300# RF

1/2"- 2" Socketweld/Flange Connection(Field) 1.5 mm T Design Temp. 105˚C

2 1/2"-14" Buttweld/Flange Connection(Field) Design Pressure 25.5 Bar Absolute

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :71 of 84

BRANCH CONNECTIONS CLASS T

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3" 4" 6" 8" 10" 12" 14"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" S S S S S T

4" S S S S S R T

6" S S S S S R R T

8" S S S S S W R R T

10" S S S S S W R R R T

12" S S S S S W W R R R T

14" S S S S S W W R R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.
3. S = Sockolet / Half coupling / Threadolet.
4. W = Weldolet.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :72 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

N/A

PIPE & FITTINGS

Pipe

1/2" - 3" High Density Polyethylene DR 11 ASTM PE 4710. Note 1, 3

4" - 12" High Density Polyethylene DR 11 ASTM PE 4710. Note 1, 3

Fittings
Note 2, 3
1/2" - 2" High Density Polyethylene ASTM PE 4710, Socket Fusion Type.

2 1/2" - 12" Note 2, 3


High Density Polyethylene ASTM PE 4710, Butt Fusion Type.

Flanges

1/2" - 3" ASME 150# DR 11 HDPE ASTM PE 4710with Ductile Iron Metal Ring,
Lap Joint FF.

4" - 12" ASME 150# DR 11 HDPE ASTM PE 4710with Ductile Iron Metal Ring,
Lap Joint FF.

ACCESSORIES

Bolting
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets
150# Non-asbestos Compressed Fiber Ring per ASME B16.21 3.2mm TH’K.

Note :
1. The wall thickness based on the pressure – temperature rating for HDPE pipes.
HDPE pipe thickness shall be follow as per vendor’s standard.
2. Thickness shall be equal or greater than pipe.
3. The method of joint shall be welded as per vendor’s standard & welding procedure.

SERVICE
Waste Water (WW) (U/G)

RATING

HDPE 150# FF
CONSTRUCTION CORROSION ALLOWANCE SPEC.
Design Temp. 30˚C
1/2" - 2" Socket Fusion Welding 0.0 mm W3
Design Pressure 4.0 Bar Absolute
2 1/2" - 12" Butt Fusion Welding

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :73 of 84

BRANCH CONNECTIONS CLASS W3

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3" 4" 6" 8" 10"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" R R R R R T

4" R R R R R R T

6" R R R R R R R T

8" R R R R R R R R T

10" R R R R R R R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :74 of 84

SIZE RANGE
DESCRIPTION REFERENCE NOTES
FROM TO

VALVES

N/A

PIPE & FITTINGS

Pipe

1/2" - 3" High Density Polyethylene DR 11 ASTM PE 4710. Note 1, 3

4" - 12" High Density Polyethylene DR 11 ASTM PE 4710. Note 1, 3

Fittings
Note 2, 3
1/2" - 2" High Density Polyethylene ASTM PE 4710, Butt Fusion Type.

2 1/2" - 12" Note 2, 3


High Density Polyethylene ASTM PE 4710, Butt Fusion Type.

Flanges

1/2" - 3" ASME 150# DR 11 HDPE ASTM PE 4710with Ductile Iron Metal Ring,
Lap Joint FF.

4" - 12" ASME 150# DR 11 HDPE ASTM PE 4710with Ductile Iron Metal Ring,
Lap Joint FF.

ACCESSORIES

Bolting
Stud Bolt ASTM A193, GR B7 w/nuts A194, GR 2 Hot Dip Galv.

Gaskets
150# Non-asbestos Compressed Fiber Ring per ASME B16.21 3.2mm TH’K.

Note :
1. The wall thickness based on the pressure – temperature rating for HDPE pipes.
HDPE pipe thickness shall be follow as per vendor’s standard.
2. Thickness shall be equal or greater than pipe.
3. The method of joint shall be welded as per vendor’s standard & welding procedure.

SERVICE
Sewage Water (SE) (U/G)

RATING

HDPE 150# FF
CONSTRUCTION CORROSION ALLOWANCE SPEC.
Design Temp. 54˚C
1/2" - 2" Socket Fusion Welding 0.0 mm X2
Design Pressure 7.0 Bar Absolute
2 1/2" - 12" Butt Fusion Welding

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :75 of 84

BRANCH CONNECTIONS CLASS X

RUN
BRANCH SIZE
SIZE

1/2" 3/4" l" 1 1/2" 2" 3" 4" 6" 8" 10"

1/2" T

3/4" R T

l" R R T

1 1/2" R R R T

2" R R R R T

3" R R R R R T

4" R R R R R R T

6" R R R R R R R T

8" R R R R R R R R T

10" R R R R R R R R R T

REMARKS:

1. T = Tee.
2. R = Reducing Tee.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :76 of 84

7.0 VENT & DRAIN

VENT & DRAINS VENT DRAIN


MINMUM SIZE & VALVE TYPE 3/4” GATE 1” GATE

7.1 General Notes

1) Valves shall be in accordance with the applicable piping class sheet.

2) Double isolation valves shall be provided on vents and drains of system and pressure
instrument root valve having pressure rating 600# and higher.

3) The design drawings will indicate where valve sizes larger than the specified minimum
are required.

4) Hydrostatic test piping shall be provided as a minimum with 3/4” high point vents and 1”
low point drains.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :77 of 84

8.0 PRESSURE & TEMPERATURE INSTRUMENT CONNECTION

8.1. General Notes

1) Half coupling or sockolet material in accordance with piping class sheet.

2) Threaded connection may be used only where permitted by piping class sheet.

3) Calculations showing adequate reinforcement are required when half coupling whose
nominal size exceeds 1/4 the nominal size of the run for ASME B31.1 piping.

4) Pressure class of fitting (i.e. 3000#, 6000# or 9000#) in accordance with applicable
class sheet.

Main Pipe Line Class Pressure Instrument Connection Temperature Instrument Connection

- Pipe wall thickness greater than


900# Flange 1/2” Socket Welding 19.05mm (Note 1)
Rating Classes Half Coupling (Note 3, 4) - Pipe wall thickness
19.05mm & Less (Note 2)
- 3” and Smaller (Note 5)

- 1” Threaded half (Note 3, 4)


600# Flange Rating 1/2” Socket Welding - 1” Socket Welding For
Classes & Lower Half Coupling (Note 3, 4) Fuel Gas & Oil and Steam System
(Note 3,4)
- 3” & Smaller. (Note 5)

Note)
1. Para. 9.1 : “Thermowell installation detail for nominal pipe wall thickness
greater than 19.05mm”
2. Para. 9.2 : “Thermowell installation detail for nominal pipe wall thickness
19.05mm & less”
3. Para. 9.3 : “Half coupling fabrication detail”
4. Para. 9.4 : “Half coupling installation detail”
5. Para. 9.5 & 9.6 : “Thermowell installation in 3” and smaller piping”
6. Para. 9.7 : “Thermowell material selection chart”

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :78 of 84

9.0 THERMOWELL INSTALLATION

9.1 Nominal Pipe Wall Thickness Greater Than 19.05 mm

9.1.1 General Notes

1) Half coupling or sockolet material in accordance with piping class sheet.

2) Weld all around and stress relieve according to the applicable codes & standards.

3) Thermowell material to the same “P” number of ASME section ix as pipe material.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :79 of 84

9.2 Nominal Pipe Wall Thickness 19.05 mm & Less

9.2.1 General Notes

1) For use on : Nominal pipe wall thickness with 19.05 maximum wall.

2) Boss : 1” fabricated per Para.9.3, socket type

3) Thermowell : Material per sheet Para.9.7.

4) Installation : See Para.9.4 for drill sequence and welding requirements.

Dimension per ASME B16.11 except dimension “D” finish

bore Dia=23.01mm

5) Special : Heat treatments per applicable codes & standards.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :80 of 84

9.3 Half Coupling Fabrication Detail

9.3.1 General Notes

1) Socket type half coupling are purchased as blanks (i.e. no fitting bore “D”)

2) Fitting dimensions per ASME B16.11 except as shown above.

3) Pilot bore diameter (P) equals fitting bore diameter (D) minus 3.2mm

4) See installation detail para. 9.4 for drilling sequence of “P” and “D” dimensions.

5) Threaded type half-couplings are purchased as standard ASME B16.11 fittings

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :81 of 84

9.4 Half Coupling Installation

9.4.1 Description of parts

A : Bore pilot hole “P” in half coupling prior to fit-up.


B : Drill thru finish bore diameter “D” after full penetration weld. (socket type only)
C : Full penetration weld. Gas tungsten arc welding (GTAW) not mandatory.

tn = nominal thickness of half coupling wall


tc = 0.7tn 6.35mm whichever is less.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :82 of 84

9.5 Thermowell Installation In 3” and Small Lines

TYPE-1

9.5.1 Description of parts

A : Standard Thermowell, Material per sheet Para. 9.7.


B : Boss per sheet Para. 9.3 & 4.
C : Eccentric or concentric reducer ; 4” to run size, butt-welded, material
per piping class sheet.
D : Pipe ; 4” per piping class sheet minimum length = 150 mm.
E : Line pipe, butt-welded
F : Fillet/socket weld per sheet Para. 9.4.
G : Full penetration weld per sheet Para. 9.4.

9.5.2 Referred Arrangement

1) Vertical lines - concentric.

2) Horizontal lines - concentric or eccentric. Install well in horizontal plane.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :83 of 84

9.6 Thermowell Installation In 2” and Small Lines

TYPE-2

9.6.1 Description of parts

A : Material per sheet Para. 9.7.


B : Bushing, threaded to suit thermowell or line size.
C : Threaded tee, material per piping class sheet, size 2”.
D : Threaded nipple, used in conjunction with required size reducing coupling.
E : Reducing coupling, as applicable.
F : Insertion length (U) = 75.0mm max.

9.6.2 General Notes

Type-2, using socket welding fittings and construction may be used in lieu of Type-1
installation in 2” and smaller socket welded lines.

Hyundai Engineering & Construction Co., Ltd


SARULLA GEOTHERMAL POWER PROJECT REV. : C-2

Piping Material Specification PAGE :84 of 84

9.7 Thermowell Material Selection Chart

Pipe Material Thermowell


Specification Fitting
ASTM (1) BAR FORGING
Carbon Steel

A106 Gr.B/A106 Gr.C A105 A479 Gr.F316 A 182 Gr.F316


/A53 Gr.B

Stainless Steel

A312 Gr.TP304 / 304L A182 Gr. A479 Gr.316 A479 Gr.316


A312 Gr.TP316 / 316L F304/F304L A479 Gr.316L A182 Gr.F316L
or F316/F316L
A358 Gr.304L CL.1

1) Use ASTM SA material for ASME section I and III application.

Hyundai Engineering & Construction Co., Ltd

You might also like