Download as pdf or txt
Download as pdf or txt
You are on page 1of 94

Volume – III: Data Sheet GWSSB

CONTRACT NO.

GUJARAT WATER SUPPLY & SEWERAGE BOARD GANDHINAGAR


(GOVERNMENT OF GUJARAT UNDER TAKING)

Bid Documents for Design, Build & Operate Contract for


AUGMENTATION TO SANKHEDA PART-I REGIONAL WATER SUPPLY SCHEME
TALUKA: SANKHEDA-BODELI, DISTRICT: CHHOTA UDAIPUR

Estimated Cost:- Rs. 3653.24 lacs

VOLUME – III

DATA SHEETS

Chief Engineer
Gujarat Water Supply & Sewerage Board
Zone –I
Vadodara
Volume – III: Data Sheet GWSSB

INDEX

Sr. No. Particulars Page No.


Preamble to Data Sheet 3

1 Section- 1: Brief Description of Work 5

2 Section- 2: Data Sheet:- Civil Works 7

3 Section- 3: Data Sheet:- WTP 22

4 Section- 4: Data Sheet:- E & M 50

5 Drawings -

Aug. to Sankheda Part-I RWSS Page No.- 2


Volume – III: Data Sheet GWSSB

Bid Documents for


AUGMENTATION TO SANKHEDA PART-I REGIONAL WATER SUPPLY SCHEME
TALUKA: SANKHEDA-BODELI, DISTRICT: CHHOTA UDAIPUR
PREAMBLE TO DATA SHEET

1. The Levels given in the Appendix to Bid details are as per the Data available with GWSSB. As the
working survey work is included in tender and the agency has to carry out work as per the
survey and as per document given by the local body for fixing the site.

2. The Agency should confirm levels and layout of the Head Works as per the requirement of
the inter-related Structures and design accordingly. No Extra payment shall be made by the
department to the agency for the extra excavation or for the raised structure above Ground
Level.

3. The agency has to carry out fresh working survey and leveling for confirmation of data
given. In case of shifting of the Head Works is to be carried out due to any reason, the
agency shall be bound to carry out all the Structures of the Head Works at the new site and
the design is to be carried out accordingly without any extra claims.

4. The sizes of the Pump Houses given in the Price Bid are as per the experience of GWSSB to
accommodate the Pumping Machinery and other relevant accessories or any other requirement
of the Employer. The Pump House should be designed accordingly and any changes in size shall
be measured on Square Meter basis of built up area only and the payment will be made
accordingly. Agency shall be bound to carry out the work as per the re-designed structures.
There is chance that the Area of Pump House may increase or decrease and the payment shall
be made to the Agency as per the actual Area in Square Meters.

5. The erection & installing of Pumping Machinery includes the Piping and Cabling considering the
Pump House size mentioned in the Tender. Any change in the pump house size shall not affect
the Pumping Machinery Cost. No extra payment shall be made to the Agency due to increase in
the Piping, Cabling or any other accessories related to the Pumping Machinery due to the
increase in the Pump House.

6. All the sumps should be designed in such a way that minimum 3 meters Residual Head is
available at Ground Level near Sump. The Depth of Excavation can be considered accordingly (if
applicable).

Aug. to Sankheda Part-I RWSS Page No.- 3


Volume – III: Data Sheet GWSSB
7. All the layout of Head Works with all components like W.T.P., R.C.C ESR, R.C.C U/G Sump,
Pump House should be designed aesthetically in relevant manner with given flow diagram. And
the layout be got approved before the detailed designing from the EIC.

8. The Pump House shall be provided with the Electric fittings with minimum required illumination
with the lighting fixtures, Piping, wiring and other accessories.

9. For RCC ESR & RCC Sump all the data are to be obtained by the agency and accordingly the
design has to make & to be confirmed with GWSSB.

Signature of Bidder Executive Engineer


P.H. Works Division
Chhotaudepur

Aug. to Sankheda Part-I RWSS Page No.- 4


Volume – III: Data Sheet GWSSB

SECTION- 1:

BRIEF DESCRIPTION OF WORK

The main scope of works / services to be done / provided by the contractor under this bid shall
be as under.

A LAYING / INSTALLATION OF MATERIAL ISSUED BY DEPARTMENT:

Nil

B PROCUREMENT, SUPPLY & LAYING OF PIPELINE

Procurement, supplying, laying, testing and commissioning of following pipelines:

a) Raw water Pumping Main pipeline from Off-take structure to WTP / RWR and Intake
well to WTP with valves, accessories etc. as per price bid.

b) Rising Main pipe line from Main head works to Sub head works with valves,
accessories etc. as per price bid.

c) Rising mains from U/G sumps at Head works/ Sub head works to ESRs located in head
works premises with valves, accessories etc. as per price bid.

d) Distribution / Express Gravity pipelines from ESRs to Sub HWs / village level sumps
with valves, accessories etc. as per price bid.

C DESIGN AND CONTRUCTION OF CIVIL STRUCTURES

Designing and constructing the following civil structures as per Contractor’s own design. The
designs shall be carried out as per design criteria given in tender & as per GWSSB and
Irrigation department norms. The agency shall obtain approval of design of civil structures
from GWSSB before construction of structures.

Sr. No. Description Quantity

1 Designing, constructing aesthetically canal off-take As per price bid


structure
2 Design and construction of RCC Intake Structure with RCC As per price bid
framed pump house & electrical room on top of Intake well
with Approach bridge.
3 Constructing Raw water reservoir As per price bid
4 Constructing RCC U/G sumps at various head works As per price bid
5 Constructing RCC ESRs at various headworks As per price bid
6 Constructing staff quarters, Operator rooms, Internal Roads As per price bid
and compound wall at various head works
7 Constructing U/G sumps at various villages As per price bid
8 Constructing RCC Pump House at various villages As per price bid

D DESIGN AND CONTRUCTION OF WATER TREATMENT PLANT

Designing and constructing the following civil structures as per Contractor’s own design. The
designs shall be carried out as per design criteria given in tender & as per GWSSB and

Aug. to Sankheda Part-I RWSS Page No.- 5


Volume – III: Data Sheet GWSSB
Irrigation department norms. The agency shall obtain approval of design of civil structures
from GWSSB before construction of structures.

Sr. No. Description Capacity/Rating Quantity


1 Design and construction of Conventional Capacity: 2 Nos
Water Treatment Plant at Proposed 8.5 mld & 7.0 mld.
H.W. Sites.

E ELECTRO-MECHANICAL WORKS

Designing, procuring, erection & Commissioning of Pumping machinery & allied works

Sr. No. Description Capacity/Rating

1 Designing providing, Installation and commissioning As per price bid


Pumping Machinery and associated electrical works
at Canal Off-take and Main H.W. Site
2 Designing providing, Installation and commissioning As per price bid
Pumping Machinery and associated electrical works
at Various Sub Head works.
3 Designing providing, Installation and commissioning As per price bid
Pumping Machinery and associated electrical works
at Village level.

F Operation & Maintenance

Sr. No. Particular Months

1 Project to be covered for Trial run 03

Operation & Maintenance after Completion of the


2 60
Project.

3 Defect Liability period 12

Signature of Bidder Executive Engineer


Public Health Works Division
Chhotaudepur.

Aug. to Sankheda Part-I RWSS Page No.- 6


Volume – III: Data Sheet GWSSB

SECTION- 2:

CIVIL WORKS

Schedule –B-1: Data Sheet for Canal Offtake Structure:

Canal Offtake Structure with Screen channel, Baffled chamber, Stilling chamber, Raw water sump
& Pump House on Top.

(1) Screen channel, Baffled chamber, Stilling chamber and Raw water sump :
Sr. No. PARTICULARS PARAMETER/ REQUIREMENT
1. GENERAL
1.1 Item Canal Off-take Structure
RCC (M-30) Rectangle Canal Offtake Structure
1.2 Type /components with Screen channel, Baffled chamber, stilling
chamber & Raw water sump
1.3 Location First pool of Sankheda Branch Canal
2 DESIGN DATA
2.1 Control Levels
a) Average ground level (GL) (As per Drawing)

b) Bottom of RWS (As per contractors design)

c) F.S.L. (As per design)


e) Minimum Water Level (As per design)
Contractor has to carryout SBC for design
2.2 SBC at site
purpose.
Contractor has to carry out investigation for
design purpose during monsoon season, retrieve
data of last five years from concern EE and as per
2.3 Water Table
actual site condition during execution and
maximum depth of water table should be consider
for design purpose.
2.4 Seismic Zone As per latest IS Code
2.5 Water Density 9.81 KN/cu.m.
3 DESIGN REQUIREMENTS
(1) I.S. 3370, Part - 1 to 4, 1965 or latest revised.
(2) I.S. 456-2000 or latest revised.
(3) I.S. 1893-2002, Part-1 to 5 or latest revised.
3.1 Standard Codes
(4) I.S. 875, Part - 1 to 5, 1987 or latest revised.
(5) I.S. 10262 - 2009 or latest revised.
(6) I.S. 13920 - 1993 or latest revised.
3.2 Grade of concrete M-30 Minimum

Aug. to Sankheda Part-I RWSS Page No.- 7


Volume – III: Data Sheet GWSSB

Sr. No. PARTICULARS PARAMETER/ REQUIREMENT


3.3 Grade of Steel Only TMT Fe-415 steel shall be used
- The foundation shall be designed as per
actual S.B.C. of strata carried out by plate
load bearing test.
Foundation - The total depth shall
3.4 not be less than 2.0 m for individual
footing.
- Minimum thickness of 100 mm to
be considered for leveling concrete with M-10
grade
RCC Wall
Channel Minimum of 200 mm thickness
Stilling Chamber Minimum of 230 mm thickness
3.5 Baffle bet’n channel & mud chamber Minimum of 230 mm thickness
Raw Water Sump Minimum 200 mm thickness
Telescopic Valve Chamber Minimum of 200 mm thickness
Launder Minimum of 150 mm thickness
RCC Base
Channel Minimum of 200 mm thickness
3.6
Stilling Chamber Minimum of 250 mm thickness
Raw Water Sump Minimum of 250 mm thickness
RCC Slab
Screen Chamber Platform Minimum of 150 mm Thickness
3.7
Stilling chamber Minimum of 150 mm Thickness
Raw Water Sump Minimum of 150 mm Thickness
Foundation – 60 mm,
3.8 Clear cover Vertical Walls, beams, slabs-40 mm and
other elements as per relevant IS code.
The Dimensions of Inlet, Outlet & Washout pipes
Dia of pipe, CI / DI Double flange/Spun are to be as per
3.9
pipe contractor's design for a maximum velocity
constrain of 1.5 m/s.
Proper ventilation as per IS specification shall be
3.10 Air Ventilation
provided.
Minimum Reinforcement for all Design requirements as set out in relevant codes
3.11
members in respect of steel shall be fully satisfied

(2). Pump House on Top of RWS :

Sr. No. PARTICULARS PARAMETER/ REQUIREMENT


1. GENERAL
1.1 Item Pump House over Raw water sump at Canal Off-
take Structure
1.2 Type RCC Framed pump House
Aug. to Sankheda Part-I RWSS Page No.- 8
Volume – III: Data Sheet GWSSB

Sr. No. PARTICULARS PARAMETER/ REQUIREMENT


1.3 Inside Dimension 6.0 m X 4.5 m
1.4 Height Minimum of 6 m height from Floor level to ceiling
level
2 DESIGN DATA
2.1 Control Levels
a) Average ground level (GL) (As per Network Diagram)
b) Pump House Floor Level (As per contractors design)
2.2 SBC at site Contractor has to carry out SBC for design
purpose.
2.3 Material Handling Arrangement HOT / EOT Crane having 2 MT capacity with
gantry girder tested to 50% overload
2.4 Seismic Zone As per latest IS Code
2.5 Water Density 9.81 KN/cu.m.
3 DESIGN REQUIREMENT
3.1 Standard Codes (1) I.S. 3370, Part-1 to 4, 1965 or latest revised.
(2) I.S. 456-2000 or latest revised.
(3) I.S. 1893-2002, Part-1 to 5 or latest revised.
(4) I.S. 875, Part - 1 to 5, 1987 or latest revised.
(5) I.S. 10262 - 2009 or latest revised.
(6) I.S. 13920 - 1993 or latest revised.
3.2 Grade of concrete M-25 (Minimum)
3.3 Grade of Steel Only TMT Fe-415 steel to be used
3.4 Live Load on the Pump Floor Level Minimum 300 kg/sq.m
(kg/ sqm.)
3.5 Live load for non accessible pump Minimum 75 kg/sq.m
house roof (kg/sq.m.)
3.6 Column Minimum of 300 mm X 450 mm
3.7 Beam Minimum of 230 mm X 450 mm
3.8 Floor & Operating Platform Minimum of 200 mm thickness
(Based on Slab Design)
3.9 Top Slab Minimum of 125 mm Thickness
3.10 Clear cover Vertical Walls, beams, slabs - 40 mm and
other elements as per relevant IS code.
3.11 Minimum Reinforcement for all Design requirements as set out in members
members relevant codes in respect of steel shall be fully
satisfied

Aug. to Sankheda Part-I RWSS Page No.- 9


Volume – III: Data Sheet GWSSB
Schedule –B-2: Data Sheet for Raw Water Reservoir :

Raw Water Reservoir


Sr. No. PARTICULARS PARAMETER/ REQUIREMENT
1. GENERAL
1.1 Item Raw Water Reservoir
Earthen type reservoir with necessary excavation
& embankment, plum concrete at outlet, apron
1.2 Type
at outfall, RCC lining in flooring & sloping sides
and WBM road on top of the bund for inspection
As per Contractors design :
1.3 Inside Dimension (Tentative 75 m X 120 m at bottom, &
99 m X 144 m at Top)
As per Contractors design.
1.4 Height (Minimum of 6 mts. from bottom level to top
level including free board)
2 DESIGN DATA
2.1 Control Levels
a) Average ground level (GL) (As per Network Diagram)
Contractor has to carry out SBC for design
2.2 SBC at site
purpose.
Contractor has to carry out investigation for
design purpose during monsoon season, retrieve
data of last five years from concern EE and as per
2.3 Water Table
actual site condition during execution and
maximum depth of water table should be consider
for design purpose.
2.4 Seismic Zone As per latest IS Code
2.5 Water Density 9.81 KN/cu.m.
3 DESIGN REQUIREMENT
(1) I.S. 3370, Part-1 to 4, 1965 or latest revised.
(2) I.S. 456-2000 or latest revised.
(3) I.S. 1893-2002, Part-1 to 5 or latest revised.
3.1 Standard Codes
(4) I.S. 875, Part - 1 to 5, 1987 or latest revised.
(5) I.S. 10262 - 2009 or latest revised.
(6) I.S. 13920 - 1993 or latest revised.
3.2 Grade of concrete M-15 (Minimum)
3.3 Grade of Steel Only TMT Fe-415 steel to be used
The foundation shall be designed for actual
3.4 Foundation S.B.C. of strata confirmed by plate load bearing
test.
3.5 Bottom Floor & Earthen Embankment Minimum of 100 mm thickness
3.6 Clear cover 20 mm for Bottom Floor & Earthen Embankment

Aug. to Sankheda Part-I RWSS Page No.- 10


Volume – III: Data Sheet GWSSB

Sr. No. PARTICULARS PARAMETER/ REQUIREMENT


Design requirements as set out in members
Minimum Reinforcement for all
3.7 relevant codes in respect of steel shall be fully
members
satisfied

Schedule - B- 3: Data Sheet for Intake Well (To be constructed within RWR) with Pump
House on Top
1. Intake Structure
Sr. No. PARTICULARS PARAMETER/ REQUIREMENT
1. GENERAL
1.1 Item Intake Well (To be constructed within RWR to
facilitate pumping)
1.2 Type 4 m dia. RCC (M-30) Circular Intake Structure
with Pump House on Top
1.3 Location Within RWR to be constructed at Main HW
Tandalja
2 DESIGN DATA
2.1 Control Levels
a) Average ground level (GL) (As per Network Diagram)
b)Bottom of Well (Top of Outlet pipe) (As per contractors design)
c)F.S.L. (As per design)
d)Minimum Water Level (As per design)
e)Pump House Floor Level (As per design)
2.2 SBC at site Contractor has to carry out SBC for design
purpose.
2.3 Seismic Zone As per latest IS Code
2.4 Water Density 9.81 KN/cu.m.
3 DESIGN REQUIREMENTS
3.1 Standard Codes (1) I.S. 3370, Part-1 to 4, 1965 or latest revised.
(2) I.S. 456-2000 or latest revised.
(3) I.S. 1893-2002, Part-1 to 5 or latest revised.
(4) I.S. 875, Part - 1 to 5, 1987 or latest revised.
(5) I.S. 10262 - 2009 or latest revised.
(6) I.S. 13920 - 1993 or latest revised.
3.2 Grade of concrete M-30 (Minimum)
3.3 Grade of Steel Only TMT Fe-415 steel to be
3.4 Foundation - The foundation shall be designed for
actual S.B.C. of strata confirmed by plate
load bearing test.
- The total depth shall

Aug. to Sankheda Part-I RWSS Page No.- 11


Volume – III: Data Sheet GWSSB

Sr. No. PARTICULARS PARAMETER/ REQUIREMENT


not be less than 2.0 m for individual
footing.
- Minimum thickness of 150 mm to
be considered for leveling concrete.
3.5 Wall Minimum of Average 450 mm thickness
3.6 Slab for walkway / approach bridge Minimum of 200 mm thickness
3.7 Top Slab for pump House installation Minimum of 200 mm Thickness
only (Floor thickness as per Design)
3.8 Clear cover Foundation – 60 mm
Vertical Walls, beams, slabs - 40 mm &
other elements as per relevant IS code
3.10 Air Ventilation Proper ventilation as per IS specification shall be
provided.
3.11 Minimum Reinforcement for all Design requirements as set out in relevant codes
members in respect of steel shall be fully satisfied

2. Pump House over intake structure:


Sr. No. PARTICULARS PARAMETER/ REQUIREMENT
1. GENERAL
1.1 Item Pump House over Intake Structure
1.2 Type RCC Framed pump House (Negative suction) with
provision for Machine Foundation
2 DESIGN DATA
2.1 Control Levels
a) Average ground level (GL) (As per Network Diagram)
b) Pump House Floor Level (As per design)
2.2 SBC at site Contractor has to carry out SBC for design
purpose.
2.3 Material Handling Arrangement HOT / EOT Crane having 2 MT capacity with
gantry girder tested to 50% overload
2.4 Seismic Zone As per latest IS Code
2.5 Water Density 9.81 KN/cu.m.
3 DESIGN REQUIREMENT
3.1 Standard Codes (1) I.S. 3370, Part-1 to 4, 1965 or latest revised.
(2) I.S. 456-2000 or latest revised.
(3) I.S. 1893-2002, Part-1 to 5 or latest revised.
(4) I.S. 875, Part - 1 to 5, 1987 or latest revised.
(5) I.S. 10262 - 2009 or latest revised.
(6) I.S. 13920 - 1993 or latest revised.
3.2 Grade of concrete M 25 (Minimum)

Aug. to Sankheda Part-I RWSS Page No.- 12


Volume – III: Data Sheet GWSSB

Sr. No. PARTICULARS PARAMETER/ REQUIREMENT


3.3 Grade of Steel Only TMT Fe-415 steel to be used
3.4 Live Load on the Pump Floor Level Minimum 300 kg/sqr.m
(kg/ sqm.)
3.5 Live load for non accessible pump Minimum 75kg/sqr.m
house roof (kg/sqm)
3.6 Column Minimum of 230 mm X 450 mm
3.7 Beam
Middle beam Minimum of 230 mm X 500 mm
Periphery beam at top Minimum of 230 mm X 350 mm
3.8 Slab for Pump Installation Minimum of 200 mm thickness
(Based on Slab Design)
3.9 Top Slab Minimum of 150 mm Thickness
3.10 Clear cover Vertical Walls, beams, slabs-40 mm &
other elements as per relevant IS code
3.11 Minimum Reinforcement for all Design requirements as set out in members
members relevant codes in respect of steel shall be fully
satisfied

Schedule - B-4: Data Sheet for Diversion Chamber with operating room on top:

1. Chamber
Sr. No. PARTICULARS PARAMETER / REQUIREMENT
1. GENERAL
1.1 Item Diversion Chamber
1.2 Type RCC (M-20) Rectangular structure with operating
room on top.
1.3 Inside Dimension 4.5 m X 3.5 m
1.4 Depth of chamber As per drawing
1.5 Location As per Price Bid
2 DESIGN DATA
2.1 Control Levels
a) Average ground level (GL) (As per Network Diagram)
b) Bottom of Chamber (As per contractors design)
c) operating room floor Level 0.6 m above GL
2.2 SBC at site Contractor has to carry out SBC for design
purpose.
Contractor has to carry out investigation for design
2.3 Water Table purpose during monsoon season, retrieve data of
last five years from concern EE and as per actual
Aug. to Sankheda Part-I RWSS Page No.- 13
Volume – III: Data Sheet GWSSB

Sr. No. PARTICULARS PARAMETER / REQUIREMENT


site condition during execution and maximum
depth of water table should be consider for design
purpose.
2.4 Seismic Zone As per latest IS Code
2.5 Water Density 9.81 KN/cu.m.
3 DESIGN REQUIREMENTS
3.1 Standard Codes (1) I.S. 3370, Part-1 to 4, 1965 or latest revised.
(2) I.S. 456-2000 or latest revised.
(3) I.S. 1893-2002, Part-1 to 5 or latest revised.
(4) I.S. 875, Part - 1 to 5, 1987 or latest revised.
(5) I.S. 10262 - 2009 or latest revised.
(6) I.S. 13920 - 1993 or latest revised.
3.2 Grade of concrete M-20 (Minimum)
3.3 Grade of Steel Only TMT Fe-415 steel to be
3.4 Foundation - The foundation shall be designed for
actual S.B.C. of strata confirmed by plate
load bearing test.
- The total depth shall
not be less than 2.0 m for individual
footing.
- Minimum thickness of 150 mm to
be considered for leveling concrete.
3.5 RCC Base Minimum of 400 mm thickness at Base
3.6 RCC Wall Minimum of 230 mm at top and 300 mm at base
3.7 Clear cover Foundation – 60 mm,
Vertical Walls, beams, slabs - 40 mm &
Other element as per latest IS code
3.8 Air Ventilation Proper ventilation as per IS specification shall be
provided
3.9 Minimum Reinforcement for all Design requirements as set out in relevant codes
members in respect of steel shall be fully satisfied

2. Operating Room:
Sr. No. PARTICULARS PARAMETER/ REQUIREMENT
1. GENERAL
1.1 Item Operating room over Diversion Chamber
1.2 Type Brick Masonry operating room with RCC top slab
& gantry girder
1.3 Inside Dimension 4.5 m X 3.5 m
1.4 Height Minimum of 3 m from floor level to ceiling level
2 DESIGN DATA

Aug. to Sankheda Part-I RWSS Page No.- 14


Volume – III: Data Sheet GWSSB

Sr. No. PARTICULARS PARAMETER/ REQUIREMENT


2.1 Control Levels
a) Average ground level (GL) (As per Network Diagram)
b) Operating room floor level 0.6 m above G.L.
2.2 SBC at site Contractor has to carry out SBC for design
purpose.
2.3 Material Handling Arrangement HOT / EOT Crane having 2 MT capacity with
gantry girder tested to 50% overload
2.4 Seismic Zone As per latest IS Code
2.5 Water Density 9.81 KN/cu.m.
3 DESIGN REQUIREMENT
3.1 Standard Codes (1) I.S. 3370, Part-1 to 4, 1965 or latest revised.
(2) I.S. 456-2000 or latest revised.
(3) I.S. 1893-2002, Part-1 to 5 or latest revised.
(4) I.S. 875, Part - 1 to 5, 1987 or latest revised.
(5) I.S. 10262 - 2009 or latest revised.
(6) I.S. 13920 - 1993 or latest revised.
3.2 Brick Strength 35 kg/cm2 (Minimum)
3.3 Grade of Steel Only TMT Fe-415 steel to be used
3.4 Live Load on the Floor Level Minimum 300 kg/sqr.m
(kg/ sqm.)
3.5 Live load for non accessible roof Minimum 75kg/sqr.m
(kg/sqm)
3.6 RCC Column Minimum of 230 mm X 300 mm
3.7 RCC Operating Platform Minimum of 150 mm thickness
3.8 RCC Room Top Slab Minimum of 150 mm thickness
3.9 Brick Wall Minimum of 230 mm thickness
3.10 Clear cover Vertical Walls, beams, slabs-40 mm &
other elements as per relevant IS code
3.11 Air Ventilation Proper ventilation as per IS specification shall be
provided
3.12 Minimum Reinforcement for all Design requirements as set out in members
members relevant codes in respect of steel shall be fully
satisfied

Schedule - B-6: Data Sheet for HW RCC UG Sump

Sr.No. PARTICULARS PARAMETER/REQUIREMENT


1. GENERAL
1.1 Item Under Ground Sump/Reservoir
Aug. to Sankheda Part-I RWSS Page No.- 15
Volume – III: Data Sheet GWSSB

Sr.No. PARTICULARS PARAMETER/REQUIREMENT


1.2 Type RCC (M-30) Shape of tank shall be
circular/square/rectangular as specified in
item of Schedule “B” or as demanded by the
E.I.C. & the Structure should be below ground
level (only 0.5 m above GL)
1.3 Capacity As per Price Bid
1.4 Location As per Price Bid
2 DESIGN DATA
2.1 Control Levels
a) Average ground level (GL) (As per Net work Diagram)
b) Bottom of Tank (Top of Outlet pipe) (As per contractors design)
c) F.S.L. (As per design)
d) Minimum Water level (As per design)
f) Free Board 0.30 m from beam bottom or lowest point of dome
doe dome type roof.
2.2 S B C at site Contractor has to carryout test for SBC at
proposed location for design purpose.
2.3 Water Table Contractor has to carry out investigation for
design purpose during monsoon season, retrieve
data of last five years from concern EE and as
per actual site condition during execution and
maximum depth of water table should be
consider for design purpose.
2.4 Seismic Zone As per latest IS code
2.5 Water Density 9.81 KN/cu.m.
3 DESIGNREQUIREMENT
3.1 Standard Codes (1) I.S. 3370, Part-1 to 4, 1965 or latest revised.
(2) I.S. 456-2000 or latest revised.
(3) I.S. 1893-2002, Part-1 to 5 or latest revised.
(4) I.S. 875, Part - 1 to 5, 1987 or latest revised.
(5) I.S. 10262 - 2009 or latest revised.
(6) I.S. 13920 - 1993 or latest revised.
3.2 Grade of concrete M-30 ( Minimum)
3.2 Grade of Steel Only TMT Fe-415 steel shall be used
3.3 Minimum Reinforcement Design requirements as set out in relevant IS
codes in respect of steel shall be fully satisfied.
3.4 Foundation - The foundation shall be designed for actual
S.B.C. of strata confirmed by plate load
bearing test.
- The total depth shall not be less than 2.0m for
individual footing.
- Minimum thickness of 100 mm to be
considered for leveling concrete.

Aug. to Sankheda Part-I RWSS Page No.- 16


Volume – III: Data Sheet GWSSB

Sr.No. PARTICULARS PARAMETER/REQUIREMENT


3.4 Vertical Wall Minimum of 150 mm thickness
3.5 Bottom Slab Minimum of 200 mm thickness

3.7 Top Slab Minimum of 100 mm thickness


(If dome is provided at the top the thickness
shall not be less than 100 mm)
3.8 Clear cover Foundation-60 mm,
Vertical walls, beams, slabs- 40 mm,
Other element as per latest IS code.
3.9 Type of Pipe & Dimensions - C.I. / DI CI / DIDF pipe shall be used as per relevant IS
double flange pipe / spun pipe code. The Dimensions of Inlet, Outlet, Overflow
& Washout pipes are to be considered as per
design for a maximum velocity constrain of 1.5
m/s.
3.10 Air Ventilation Proper ventilation as per IS specification shall
be provided.
3.11 Length of pipes From free board level to duck foot bend
(vertically) and minimum 5.0 meter along
ground after edge of outer face of the structure
(Horizontally).
3.12 Size of Butterfly Valves (IS- 13095) & Same size for Outlet & Washout pipe total 2 No of
Sluice Valve as per IS 14846 valves for Each RCC Sump. For More than 300 mm
dia. Butterfly valve shall be provided instead of
SV.
3.13 Minimum Reinforcement for all Design requirements as set out in relevant IS
members codes in respect to all reinforcements shall be
strictly followed.

Schedule - B-7 : Data Sheet for RCC ESR


Sr.No. PARTICULARS PARAMETER/ REQUIREMENT
1. GENERAL
1.1 Item Elevated Service Reservoir

1.2 Type RCC (M-30) as per contractor’s design.

1.3 Capacity As per Price Bid

1.4 Staging Height As per Price Bid

1.5 Location As per Price Bid


2 DESIGN DATA
2.1 Control Levels

a) Average ground level (GL) (As per Network Diagram)

b) Bottom of tank G.L. as above + Staging Height

Aug. to Sankheda Part-I RWSS Page No.- 17


Volume – III: Data Sheet GWSSB

Sr.No. PARTICULARS PARAMETER/ REQUIREMENT

c)Full Supply level (As per design)

d)Minimum Water Level (As per design)

e)Free Board 0.3 m


Contractor has to carryout test for SBC at
2.2 SBC at site
proposed location for design purpose.
2.3 Water Table Contractor has to carry out investigation for
design purpose during monsoon season, retrieve
data of last five years from concern EE and as
per actual site condition during execution and
maximum depth of water table should be
consider for design purpose.
2.5 Seismic Zone As per latest IS code

2.6 Water Density 9.81 KN/cu.m.

3 DESIGN REQUIREMENT
3.1 Standard Codes (1) I.S. 3370, Part-1 to 4, 1965 or latest revised.
(2) I.S. 456-2000 or latest revised.
(3) I.S. 1893-2002, Part-1 to 5 or latest revised.
(4) I.S. 875, Part - 1 to 5, 1987 or latest revised.
(5) I.S. 10262 - 2009 or latest revised
(6) I.S. 13920 - 1993 or latest revised
(7) I.S. 11682-1985 or latest revised
(8) I.S. 11089-1987 or latest revised
3.2 Grade of concrete M-30 (Minimum)

3.3 Grade of Steel Only TMT Fe-415 steel to be used


Foundation - The foundation shall be designed for actual
S.B.C. of strata confirmed by plate load
bearing test.
3.4 - The total depth shall not be less than 2.0m for
individual footing.
- Minimum thickness of 100mm to be considered
for leveling concrete.
Vertical Staging The RCC shaft support as per IS 11682 including
door opening and suitable air ventilation as per
3.5 design and drawing. Also provide circular
staircase inside shaft as per specification. The
staging shall be designed for ductile detailing.
3.6 Container Wall Minimum of 200 mm thickness
3.7 Conical Wall Minimum of 225 mm thickness
3.8 Bottom Slab Minimum of 200 mm thickness
Top Slab Minimum of 150 mm thickness
3.9 ( If dome is provided at the top the thickness
shall not be less than 125 mm)

Aug. to Sankheda Part-I RWSS Page No.- 18


Volume – III: Data Sheet GWSSB

Sr.No. PARTICULARS PARAMETER/ REQUIREMENT


3.10 Braces The width of braces shall be minimum 250 mm.
There shall be minimum distance of 75 mm
between two adjoining reinforcement bars
provided in the braces as well as beams.
3.11 Clear cover Foundation-60mm
Columns Braces, beams, slabs-40 mm &
Other element as per latest IS code
3.12 Type of Pipe & Dimensions - C.I. / DI CI / DIDF pipe shall be used as per relevant IS
double flange pipe / spun pipe code. The Dimensions of Inlet, Outlet, Overflow
& Washout pipes are to be considered as per
design for a maximum velocity constrain of 1.5
m/s.
3.13 Length of pipes as per contractors design
From container to duck foot bend (vertically)
and minimum 5.0 meter along ground after edge
of outer face of the structure (Horizontally).
3.14 Size of Butterfly Valves (IS- 13095) & Same size for Outlet & Washout pipe total 2 No
Sluice Valve as per IS 14846 of valves for Each RCC ESR. For More than 300
mm dia. butterfly valve shall be provided instead
of SV.
3.15 Air Ventilation Proper ventilation as per IS specification shall be
provided.
3.16 Size of Valve Chamber As per design
i) Internal Dimension 1.5 mts. depth (Average)
ii) Thickness of Masonry 23 cm

iii) Type of Masonry Brick Masonry in C.M. 1:6

iv) Plaster and pointing Inside plaster in C.M. 1:3 , 15 mm thick

v) Foundation 15 cm thick C.C. 1:3:6 or as per design

vi) Frame and Cover for chamber As per Requirement

vii) RCC Slab C.C. 1:1.5:3 - 15 cm thick

Minimum Reinforcement for all Design requirements as set out in relevant IS


3.17 Members codes in respect of all Reinforcements shall be
strictly followed.

Schedule - B-14: Data Sheet for Pump House


1. Pump House at Main Head Work
Sr.No. PARTICULARS PARAMETER/REQUIREMENT
1. GENERAL
1.1 Item Pump House

Aug. to Sankheda Part-I RWSS Page No.- 19


Volume – III: Data Sheet GWSSB

Sr.No. PARTICULARS PARAMETER/REQUIREMENT


1.2 Type RCC Framed pump House with provision for
Machine Foundation
1.3 Carpet Area As per Price Bid

1.4 Height Minimum of 6m from Floor level to ceiling level


1.5 Location As per Price Bid
2 DESIGN DATA
2.1 Control Levels
a) Average ground level (GL) As per Price Bid
b) Pump House Floor Level 0.5 m above GL
2.2 SBC at site Contractor has to carryout test for SBC at
proposed location for design purpose.
2.3 Water Table Contractor has to carry out investigation for
design purpose during monsoon season, retrieve
data of last five years from concern EE and as
per actual site condition during execution and
maximum depth of water table should be
consider for design purpose.
2.4 Material Handling Arrangement As per Price Bid
2.5 Seismic Zone As per latest IS Code
2.6 Water Density 9.81 KN/cu.m.
3 DESIGNREQUIREMENT
3.1 Standard Codes (1) I.S. 3370, Part-1 to 4, 1965 or latest revised.
(2) I.S. 456-2000 or latest revised.
(3) I.S. 1893-2002, Part-1 to 5 or latest revised.
(4) I.S. 875, Part - 1 to 5, 1987 or latest revised.
(5) I.S. 10262 - 2009 or latest revised.
(6) I.S. 13920 - 1993 or latest revised.
3.2 Grade of concrete M-25( Minimum)
3.2 Grade of Steel Only TMT Fe-415 steel to be used
3.3 Live Load on the Pump Floor Level Minimum 300 kg/Sq. m
(kg/ sq m.)
3.4 Live load for non accessible pump Minimum 75kg/Sq. m
house roof(kg/sqm)
3.5 Foundation - The foundation shall be designed for actual
S.B.C. of strata confirmed by plate load
bearing test.
- The total depth shall not be less than 1.0 m.
Block foundation for Pumping machinery over
floor slab to be provided, as per relevant IS
code.
3.6 Column Minimum of 300 mm thickness

Aug. to Sankheda Part-I RWSS Page No.- 20


Volume – III: Data Sheet GWSSB

Sr.No. PARTICULARS PARAMETER/REQUIREMENT


3.7 Beam Minimum of 300 mm thickness
3.8 Bottom Floor Minimum of 200 mm thickness
(Based on Slab Design)
3.9 Top Slab Minimum of 125mm Thickness
3.10 Clear cover Foundation-60mm
Vertical Walls,beams,slabs-40mm &
Other element as per latest IS code.
3.11 Minimum Reinforcement for all Design requirements as set out in relevant IS
members codes in respect of all Reinforcements shall be
strictly followed.

Aug. to Sankheda Part-I RWSS Page No.- 21


Volume – III: Data Sheet GWSSB

SECTION- 3:
WATER TREATMENT PLANT (WTP)
Schedule - B- 5: Data Sheet for Water Treatment Plant (WTP):

1) All water retaining structure should be in M-35 and 20 mm thick water proof plaster in
C.M.1:2 inside of all water retaining structure to be provided.

2) Contractor has to carry out SBC for design purpose and Water table to be considered as
per actual site condition.

Note: S.B.C. & Water table given in below table for estimation purpose. Contractor shall
carry out the S.B.C. test before designing the WTP. No extra payment shall be
given for variation in SBC.

Sr No Particulars Parameter/ Requirement


1. GENERAL
1.1 Item Water Treatment Plant
1.2 Type Conventional

8.5 MLD & 7 MLD Net treated water at WTP


1.3 Capacity
outlet (Considering 22 hrs running time)

At Tandalja Main HW (8.5 MLD) and Bodeli


1.4 Location
Town (7 MLD)
2. DESIGN DATA
2.1 Control Levels
a) Average ground level (GL) Bidder to conduct investigation
Up to 5.0 to 6 m above GL OR As per bidders
b) FSL at Aerator
design
c) FSL at Clear water sump Equal to Average GL
2.2 S.B.C. at site Bidder to Conduct Investigation
2.3 Water Table Bidder to Conduct Investigation
2.4 Water Quality
As per Vol II B:Technical Specifications Water
a) Raw Water
Treatment Plant
As per Vol II B:Technical Specifications Water
b) Required Treated Water
Treatment Plant
3.0 DESIGN REQUIREMENT
3.1 Design Capacity

Aug. to Sankheda Part-I RWSS Page No.- 22


Volume – III: Data Sheet GWSSB

3.1.1 Design Flow WTP components are to be designed for


delivering Net Treated Water Quantity of 8.5
MLD at WTP outlet for Tandalja WTP and 7 MLD
at WTP outlet for Bodeli Town considering 22
hr/day operation. Plant capacity is exclusive of
all Water requirements like filter Backwash,
water loss with clarriflocculator sludge,
Chemical solutions preparations, laboratory &
Plant usage. The Individual Design flow for any
intermediate unit/s to be calculated
considering Water losses & additional flow due
to recycling (as applicable) to produce the net
treated Water Quantity as specified. The Filter
backwash Waste water is to be recycled to the
WTP at raw water channel after cascade
Aerator, if the plant design capacity i.e. net
treated water quantity at WTP outlet is more
than 20 MLD in 22 hours; otherwise the Filter
backwash Waste Water is to be disposed off
suitably with clarifier sludge. For preparing
Flow balance Diagram, Water losses shall be
considered as 2% of Clarifier output for clarifier
sludge & 1% of filter Output for Dirty backwash
water loss along with sludge as per CPHEEO
manual guidelines & considering 2% dirty
backwash water will be recycled within WTP.

3.1.2 WTP Overloading Capacity


a. All pipes/channels/launders within
a. 20% Overloading over design flow
WTP
b. Inlet and Outlet arrangement of
b. 100% Overloading over design flow
Filter works
3.2 Cascade Aerator
3.2.1 Number of units 1 No
Up to 5.0 to 6 m above GL OR As per bidders
3.2.2 Inlet Level
design, whichever higher
3.2.3 Design Flow As per Sr. No 3.1.1 above
3.2.4 Number of steps 4 to 5 Nos.
3.2.5 Surface loading rate 0.03 m2/ m³/hr
3.2.6 Ht. of each riser 0.3 m
3.2.7 Ht. of inlet pipe above First tier 50 mm
3.2.8 Velocity in peripheral launder 0.6 m/s maximum
3.2.9 Free Board in peripheral launder 0.5 m
Note-The Cascade Aerator should be pooled cascade aerator having pooling effect with
1” extra rise above each tread.

Raw water channel-from Cascade Aerator to Flash Mixer (with Parshall Flume as Flow
3.3 measuring Device designed as per CPHEEO Manual and 1 m x 1 m Float Chamber with
fixed calibrated flow measuring device )

Aug. to Sankheda Part-I RWSS Page No.- 23


Volume – III: Data Sheet GWSSB

3.3.1 Design Flow As per Sr. No 3.1.1 above+20% Overloading

3.3.2 Dimensions
a) Total Length of channel 10.0 m (minimum)
b) Width As per design requirement
c) Freeboard Minimum 0.5 m

c. Approach channel upstream of


15 times throat width
parshall Flume

d. Channel downstream of parshall


7 times throat width
flume

e. Design of parshall flume As per CPHEEO manual for water treatment

3.3.3 Velocity in raw water channel 0.6 m/ sec (maximum)


0 to Design flow including 20% overloading +
3.3.4 Range of flow rate Indicator
10% Additional capacity.
Alum Dosing Tanks ( with Dissolving
3.4 trays, Constant head alum dosing tank
with taper needle valve)
3 Nos. (one for preparation, Second for dosing,
3.4.1 Number of tanks
third as standby)

8 hours for imparting average 30 mg/l Alum


3.4.2 Capacity (each) dose (Non Ferric Alum with min 16% Al2O3
content) to raw water flow

3.4.3 Tank Material RCC epoxy lined


Liquid depth: Diameter or Liquid depth
3.4.4 1:1 to 3:1
: L/W ratio

Level Indicator, Constant head device,


3.4.5 Accessories dissolving trays, perforated water spray line,
drain & overflow arrangement etc.

3.4.6 Free Board 0.5 m


3.4.7 Agitator MOC SS 316
3.4.8 Solution strength 5%
3.4.9 Agitator RPM 100 rpm

Distribution Chamber to divide equal


3.5 flow between numbers of Flash
mixers (if applicable)

3.5.1 Number of units As per design


3.5.2 Design Flow As per Sr. No 3.1.1 above
3.5.3 Detention time 15 sec
3.5.4 Free Board 0.5 m
Aug. to Sankheda Part-I RWSS Page No.- 24
Volume – III: Data Sheet GWSSB

Suitable gates/valves shall be provided at


3.5.5 Gates/valves at inlet outlet Distribution chamber inlet & outlet to for unit
isolation & flow control

Velocity in outlet from distribution Max 0.9 m/s (if channel provide 0.5 m Free
3.5.6
chamber Board)
3.5.7 MOC of outlet As per specifications
3.6 Flash Mixer
3.6.1 Number of units 1 No.per Each Clarriflocculator
3.6.2 Design Flow As per Sr. No 3.1.1 above
3.6.3 Detention time 60 seconds (minimum)
3.6.4 Mixing Mechanism Mechanical as per IS 7090-1985
3.6.5 Velocity Gradient Minimum 300 S -1
3.6.6 Ratio of Tank Height to Diameter 1:1 to 3:1
3.6.7 Ratio of Impeller Diameter to tank 0.2 to 0.4
diameter
3.6.8 Shaft Speed of propeller 100 rpm
3.6.9 Power Requirements 1 to 3 watts/m3/hr of flow
3.6.10 Tangential velocity >=3 m/s at the tip of the blade
3.6.11 Baffles to reduce vortex formation Projecting 1/10 to 1/12 tank diameter, at
minimum of 4 places
3.6.12 Tank (Shape & Construction) Circular/Square RCC Tank open at top (As per
Bidder’s design)
3.6.13 Free Board 0.5 m
3.6.14 Agitator MOC SS 316
3.6.15 Minimum Shaft Diameter 200 mm
3.6.16 Washout / Drain Pipe with Chamber / 150 mm dia. (Minimum)
Valve arrangement for Flash mixer
bottom above FGL

3.7 Inlet Pipe From Flash Mixer to Clariflocculator


3.7.1 Design Flow As per Sr. No 3.1.1 above + 20% Overloading
over design flow
3.7.2 Pipe Diameter As per Bidder’s design
3.7.3 Length As per actual layout
3.7.4 Velocity 0.9 m/s max.
3.7.5 Material As per specifications
3.8 Clariflocculator
a) Type Circular tank with central flocculator and
clarifier with horizontal flow pattern
b) Design Flow As per Sr. No 3.1.1 above
Aug. to Sankheda Part-I RWSS Page No.- 25
Volume – III: Data Sheet GWSSB

c) Overloading No overloading in unit design. Only 20%


overloading in peripheral launder & settled
water channel

d) Number of units As per design


e) Maximum permissible Diameter of 35.0 m
single unit
3.8.1 Flocculation Zone
a) Detention time 30 minutes (minimum)
b) Velocity gradient 20 S -1to 75 S -1 (maximum)
c) Velocity of flow at inlet ports 0.2 to 0.3 m/s
d) Recommended Range of Peripheral
0.3 to 0.4 m/sec
Velocity of blades
10 to 25% of CS area of tank parallel to plane of
f. Total area of paddles
shaft

g. Range of G.T. For Alum-2 to 6 x104 ; For Ferric -1 to 1.5 x 105

h. Power Consumption 10 to 36 KW/MLD


i. RPM of paddle 2 to 5

j. Tangential velocity of water


25% of velocity of paddle edge
adjacent to paddle edge

k. Tank Depth 3m to 4.5 m


g) Tank Dimensions Circular As per design
MSEP min 6 mm thk. , underwater fasteners-SS
h) Flocculator Mechanism
316
Service Factor for Gear box 2.0
a. Applicable standard IS: 7208-1974 (Type C)

b. Depth below partition wall for


flow entry to Clarifier Zone- 0.3 m/min
maintain velocity of

c. Additional depth below partition


25% of Flocculator SWD
wall for sludge storage

Clarifier Zone with Mechanical sludge


3.8.2
scrapping mechanism

As required so as to have maximum unit


a. Number of units
diameter as 35 m
b. Detention time 2.5 Hours (minimum)
c. Surface Loading 1.25 m3/m2/hr (maximum)
d. Weir loading 12.5 m³/m/hr (maximum)

Aug. to Sankheda Part-I RWSS Page No.- 26


Volume – III: Data Sheet GWSSB

e. Tank diameter As per design. Maximum unit diameter as 35 m

f. Side depth of clarifier 3 to 5 m


g. Free board 0.5 m
h. Floor Bottom slope 1 : 10 to 1 : 12 (V:H)
i. Sludge well slope 1:1 to 2:1 (V:H)

j. Sludge discharge arrangement Telescopic sludge bleeding valve

k. Water Flushing Required in sludge line


l. Minimum sludge Pipe diameter
200 mm
required

90 deg V notches or circular orifice at 300 mm


m. Outlet arrangement C/C submerged 3cm to 90 cm below water
surface

n. Velocity in outlet conduit in


case of orifice (Launder-at
0.15 to 0.25 m/sec.
innerface of clarifier with
submerged orifice)

o. Velocity in peripheral launder 0.6 m/s

1.2 M wide RCC walkway with MS pipe railing


p. Walkway & Ladder to periphery
epoxy painted

MSEP min 6 mm thk. MOC of Bridge & Scrapper-


MS IS 2062, underwater fasteners-SS 316 rest
q. Scraper blades
all GI, bridge – GI Grating/MS Chequered plate
Painting-2 Coats of primer & 2 coats of Epoxy
o Applicable Standard IS: 10313-1982
o Scraper Velocity 1(one) revolution in 30 to 40 minutes
o Tip velocity of scrapper 0.3 m/min
o Power requirements 0.75w/m2 tank area
Centrally driven fixed type/peripheral driven
r. Clarifier Mechanism
type with 1.2 m wide Bridge
s. Unit Free Board 0.3 m

Sludge Withdrawal ( a constant


bleeding type telescopic desludging
3.8.3 arrangement for desludge pipe shall
be provided for observation of sludge
quantity)

Periodically withdrawn through a telescopic


a) Type (continuous/ periodic)
sludge withdrawal valve
b) Design Velocity in sludge pipe 0.75 m/sec

Aug. to Sankheda Part-I RWSS Page No.- 27


Volume – III: Data Sheet GWSSB

c) Size As per design. However Minimum 200 mm dia.

CI/DI flanged pipe with inside epoxy painting


d) Material
and outside encasing
3.8.4 Sludge Disposal
By Gravity /pumping upto chamber at plant
a) Up to Plant Boundary
boundary
b) Beyond Plant Boundary RCC NP2 pipe approx. 500 m Long
c) Design Flow in RCC pipe as per the Design or minimum 2 MLD
d) Design Velocity in sludge pipe 0.75 m/sec
e) Pipe Dia As per design or minimum 200 mm
RCC Channel From Clariflocculator To
3.8.5
Filter

Design Flow As per Sr. No 3.1.1 above with 20% overloading

Dimensions As per design


Freeboard Minimum 0.5 m
Velocity 0.9 m/ sec (maximum)
3.9 Filter Plant
3.9.1 Filters
a) Type Variable head declining rate filters
b) Design Flow As per Sr. No 3.1.1 above

No overloading on Filter design. However 100%


c) Overloading overloading for Filter inlet & outlet
arrangements.

Minimum 2 filter beds, each with 2


d) Number of Beds
units/compartments i.e. twin bed type
e) Area of Single Unit 20-30 m²

f) Filter Sand As per Technical Specification : Filtration works

3.9.2 Rate of Filtration 6 m³/m ² /hr on average


Length to Width ratio 1.2 to 1.33 Preferred
Water depth 2.00 m
Filter bed Depth incl. Free board 3.90 m + depth of under drain system
Free board 0.50 m
Sand Depth 0.90 m Minimum
Gravel bed 0.50 m Minimum
Minimum Water Depth on Sand 2.0 m

Aug. to Sankheda Part-I RWSS Page No.- 28


Volume – III: Data Sheet GWSSB

3.9.3 Inlet & Outlet control


Designed to permit 100% overload for
a) Inlet & Outlet control arrangement
emergency occasions

a. Velocity at control points Filter Inlet


Filter outlet Wash water inlet Wash 1.1 m/s 1.3 m/s 2.5 m/s 2.0 m/s 15-20 m/s
water outlet Air inlet

3.9.4 Filter Backwash


36 m³/ hr/ m² (600 lpm/m2) for a duration of
a) Backwash rate
10 minutes

Separate O/H wash water cum service water


b) Wash water tank
tank to be constructed by contractor

Suitable to supply water to wash 2 filter units


i.e. 1 Twin bed at a time + water supply
required for office and laboratory use (12
c) Wash water tank capacity
m3)+, water required for chemical solution
preparation incl. Chlorination Equipment
requirement+10% extra on above

Suitable to generate minimum 9 meter head at


under drain from bottom of farthest filter bed.
d) Elevation of Wash water tank Note-The bottom of the backwash water tank
should be minimum 1.00 m above the Filter
House Roof with separate slab

e) Wash Water supply line Diameter to restrict velocity up to 2.5 m/sec.

2 x 100% capacity pumps suitable to fill wash


f) Wash water supply pump
water tank in 1 hour.

Wet volume to hold dirty backwash from 1 Twin


bed+0.5 m free board. Sludge settling time-30
minutes minimum, Sloped bottom tank, Pumps-
g) Dirty backwash recirculation sump 2 nos (1w+1s) common for wasting sludge or
with pumps recirculating water to WTP with 2 nos.
Discharge pipes, one for wasting sludge & other
for recirculating back to WTP. Separate pumps
can be provided as per contractors design.

3.9.5 Air Scouring System


45 m³/ hr/ m² for a period of 5 minutes at
Air Scour rate
pressure of 0.4 Kg/ cm² at underdrain

2 x 100 % ( 1 W +1 S) of suitable capacity & 0.4


Number of Air Blowers
kg/cm2 delivery pressure

Aug. to Sankheda Part-I RWSS Page No.- 29


Volume – III: Data Sheet GWSSB

3.9.6 Under Drain System


a) Type Manifold & Lateral system

Central Manifold-RCC/CI/Plastic Lateral Pipes-


HDPE/PVC pipes 6 kg/cm ² rating OR SS 316 V
b) Material of Manifold & Lateral pipes
Wire screen type system. Gravel depth not
required in this case

c) Ratio of Total area of


0.3%
orifice/perforations to Filter area

d) Ratio of Total area of perforations <=0.5 for 12 mm orifice <= 0.25 for 5 mm
to total CS area of lateral orifice

e) Ratio of Total area of manifold to


1.5
Total area of Laterals
f) length of lateral/diameter of Lateral < 60

Perforation size: 5 mm to 12 mm, staggered at


slight angle from vertical axis of pipe
Other details Perforation spacing: vary from 80 mm for
perforations of 5 mm to 200 mm for
perforations of size 12 mm

Spacing of laterals Appx. 300 mm


Pipeline from Filter Plant to Clear
3.9.7
Water Sump

a) Design Flow As per Sr. No 3.1.1 above with 20% overloading

If Dia is >600 mm then MS pipe or else CI/DI K-


7,MS pipe with min. 5 mm (thickness) with I/S
b) Material
solvent free epoxy lining and O/S Epoxy
painting

c) Velocity 0.9 m/sec max.


Bypass Arrangement with
3.10
Gates/Valves

From raw water Channel to Filter


Inlet(Bypass Flash mixer, Required
Clariflocculator)

From clear water channel to Clear


Required
Water Sump(Bypass RSF)

Design Flow As per Sr. No 3.1.1 above with 20% overloading

Velocity 0.9 m/sec max.


3.11 Chemical House

Aug. to Sankheda Part-I RWSS Page No.- 30


Volume – III: Data Sheet GWSSB

As per Technical Specification: Chemical works.


Minimum storage requirement for Alum/PAC is
minimum 90 days + 10% extra for sundry
3.11.1 Area (minimum)
materials & Chlorine tonner is 30 days.
Adequate space shall be provided for man
movement & between stacks as required

3.11.2 Chlorination Arrangement


a) Residual Chlorine 0.4 ppm
b) Chlorinator Vacuum Type
Vacuum type, with 100 % standby, to achieve
For Pre Chlorination
pre-chlorination dose of 5 mg/l

Vacuum Type, with 100 % standby, shall be


For Post Chlorination provided to achieve post-chlorination dose of 3
mg/l

Suitable as per Maximum Dosage Required &


Capacity
design flows

1 W + 1 S for 100% Capacity, each for pre &


Quantity
post Chlorination
Chlorine storage required 30 days usage
Number of Chlorine tonners As required, with -100% Standby each for Pre
chlorination & -100% Standby each for Post
chlorination -Total no of tonners should meet
30 days storage requirement -in any case,
minimum 2 nos. Tonners to be provided for pre
chlorination & 2 nos. For Post Chlorination.

EOT 3 MT

Weighing scale As per specifications

3.11.3 LABORATORY INSTRUMENTS As per list attached on following pages


3.12 Security cabin 3 m x 3m
3.13 Engineers office cum staff quarter 1 no. 60 m2
3.14 Vendor List As per GWSSB website in line with the inviting
bid
3.15 Mechanical Works All Mechanical Works as per Detailed
specifications
3.16 Electrical Works All electrical works as per Detailed
specifications

Aug. to Sankheda Part-I RWSS Page No.- 31


Volume – III: Data Sheet GWSSB
Note-
1. Settling tank/clarifier should be capable of giving settled water having turbidity not exceeding
20 NTU (monsoon season) and preferably less than 10 NTU.
2. Restrict Circular clariflocculator diameter to maximum 35 m dia. is to reduce wind effect.
3. Sludge disposal line should be provided from the clariflocculator to sludge chamber, the
minimum size of chamber should be (1m x 1m)
4. If launder is provided inside the clariflocculator, the area of launder should be added in
calculating final area of clariflocculator.
5. Construction of Wash water tank is in Scope of the Agency.
6. One chain pulley block of 1 M.T. capacity hand operated shall be provided for lifting/handling of
alum.
7. The capacity of E.O.T for lifting of chlorine cylinders shall be 3.00 M.T.
8. Wash water channel should be RCC upto filter gallery and thereafter is should be RCC NP2 class
pipes.
9. Post chlorination tank with RCC baffles with 10 Minutes detention time at Net treated water
output flow shall be provided before leading the water to Clear water sump.
10. Datasheet takes prevalence over civil specifications in case of any mismatching information.

Aug. to Sankheda Part-I RWSS Page No.- 32


Volume – III: Data Sheet GWSSB

Minimum Instruments Required For WTP

1 Parshall Flume-Mechanical head measurement type instrument to be provided to


measure head at parshall flume & corresponding/proportionate Flow values to be
calculated & displayed on field.
2 Clariflocculator-Overload Torque switch with High alarm & High High Trip of
Clariflocculator mechanism
3 Filters-LOH measuring system (manometer based) & ROF measuring system to be
provided
4 Backwash Overhead tank-Float & board type Level Indicator, Displacer/Float type
level switch-Low & High alarm with trip to backwash overhead tank fill pumps at
High level
5 Dirty backwash Recirculation sump-Displacer/Float type level switch-Low & High
alarm with trip to Recirculation pumps at Low level
6 Service Water tank -Float operated valve at inlet to tank
7 Chemical dosing tanks -Float & Horizontal Scale type level gauge
8 Diaphragm seal pressure gauges-at all pumps discharge
9 Bourden Pressure Gauges-at all Blowers discharge
10 All alarm/indications shall be provided in instrument chamber of MCC

Aug. to Sankheda Part-I RWSS Page No.- 33


Volume – III: Data Sheet GWSSB
Chemical house, laboratory & administrative building with areas as per details
mentioned here under:

Minimum individual unit area of the Chemical House to be followed strictly

Output Capacity Output Capacity of


Sr. No. Details of the plant up to the plant more
7.5 MLD than 7.5 MLD.

A Ground Floor

1 Alum Store 25.00 30.00

2 Toilet Block 15.00 25.00

3 Instr. Control panel Room 20.00 30.00

4 Stair case 15.00 15.00

5 Chlorinator Room 15.00 25.00

6 Chlorine Tonner Store ( 5.00 m height) 30.00 50.00

Total Area of Ground Floor 120.00 175.00

B First Floor

1 Alum tanks 25.00 30.00

2 Store 15.00 15.00

3 Laboratory 50.00 100.00

4 Office 15.00 15.00

5 Stair Case 15.00 15.00

Total Area of First Floor 120.00 175.00

Total Area of Ground Floor & First Floor 240.00 350.00

Note- The offered areas are indicative and minimum; the contractor should provide calculations for
arriving at these areas & provide this as minimum area or else provide higher area if required
as per the calculations & as per the approved Mechanical/ GA drawings for respective
equipments.
Staircase should be provided at a location from where all areas/rooms are easily accessible.
Normal storage required for chemicals is : 90 days for alum storage +10% extra for other
sundry storage, 30 days for Chlorine tonners.

Aug. to Sankheda Part-I RWSS Page No.- 34


Volume – III: Data Sheet GWSSB

Laboratory Instruments

Sr. Details Specs & requirement Output Capacity Output


No. of the plant Capacity of
more than 7.5 the plant up
MLD. to 7.5 MLD

Minimum Equipments needed for Physical & Chemical tests

1 Digital pH meter completed Microprocessor based


with 1 calomel Electrode & pocket type, Range: 0-
√ √
Glass Electrode 14, 2 nos.

2 pH Kit with different discs for 2 sets √ √


PH measurement
3 Digital TDS meter Microprocessor based
pocket type, range: 0- √ √
1000 ppm, 1 nos.

4 Digital Turbidity meter Portable type, Range 0-


1000 NTU, 2 Nos. for
raw water Range 0-20
NTU, 2 Nos. for √ √
Filtered/settled water

5 Conductivity meter 1 No. √ √

6 Spectrophotometer 1 No. √ √

7 Water bath with 6 to 8 1 No.


concentric holes & discs, √ ×
Electrically heated

8 Soxhelt Extraction unit 1 No. √ ×


9 Kjeldahl Digestion Unit 1 No. √ ×
10 Hot Plates 1 No. √ √

11 Distilled water Plant 1 No. √ √

12 1 No. √
Demineraliser ×
13 Refrigerator 1 No. √ √

14 BOD Incubator 1 No. √ ×

15 Muffle Furnace 1 No. √ √

Aug. to Sankheda Part-I RWSS Page No.- 35


Volume – III: Data Sheet GWSSB

16 Electric Oven 1 No. √ √

17 ½ HP motor 1 No. √ ×

18 Magnetic Stirrer 1 No. √ √


Analytical balance with
19
weight box
1 No. √ √

20 Jar test apparatus 1 No. √ √

21 Centrifuge 1 No. √ √

22 Digital Fluoride Test Kit 1 No. √ √


Gas Cylinder if piped gas
23
supply not available
1 No. √ √

24 Fume Cupboard 1 No. √ √

Necessary glassware &


accessories (like beaker,
conical flask,burette,pipette,
25 Volumetric flask etc. ) & As required √ √
chemicals required to do
routine Physical, chemical &
Biological analysis

Aug. to Sankheda Part-I RWSS Page No.- 36


Volume – III: Data Sheet GWSSB

Laboratory Instruments
Sr. Details Specs & requirement utput Capacity Output
No. of the plant Capacity of
more than 7.5 the plant up
MLD. to 7.5 MLD
Minimum Equipments needed for Bacteriological Examination

1 Hot Air Oven Up to 200 Deg C √ √


2 Autoclave or Pressure Cooker √ √

3 Incubator 37°C or 44°C (Water/Air-Jacketed) √ √

4 Binocular microscope √ √

5 pH Meter √ √

6 Pipette Box (Stainless Steel) √ √

7 Wooden Racks/Aluminium √ √
Racks

8 Wire Baskets √ √

9 Cotton/ Aluminium Foils √ √

10 Burners (Bunsen) With Pilot √ √


Lamp

11 Suction Flask (1 Litre Cap) √ √

12 Suction Pump √ √

13 Sampling Bottles 250 ml √ √


capacity

Bacteriological Media

1 M. Endo Broth (dehydrated) √ √

2 Lactose or Lauryl Tryptose √ √


broth

3 Mac Conkey broth √ √


Brilliant Green Bile Lactose
4
Broth √ √

5 Total Plate Count Agar √ √


6 Peptone/Triyptone Water √ √

Aug. to Sankheda Part-I RWSS Page No.- 37


Volume – III: Data Sheet GWSSB

The equipment shall be supplied with all the accessories that are necessary to make the equipment
functional for analyzing parameters. Contractor can offer additional equipment if necessary.

UV Visible Pre-programmed Spectrophotometer

UV Visible Preprogrammed Spectrophotometer for measurements of water Quality parameters and


Spectral Analysis Shall be pre programmed for more than 150 parameters or common drinking water
testing parameters like residual chlorine, Iron, Hardness, alkalinity, fluoride and sulfate etc. The
spectrophotometer instrument shall be a multi-wavelength, UV-Visible, single beam
spectrophotometer designed for Water analysis. The instrument, depending on the test selection,
shall automatically select the wavelength.

Readout modes shall include transmittance, absorbance, concentration, optional wavelength scan
and time course graphs. Spectrophotometer should come along with the following reagents and
accessories: Power supply, Operators manual, one pair 10mm rectangular path length cells and
reagents for common drinking water parameters like residual free chlorine, Iron, sulfate, silica Low
range and Fluoride for 1000 tests.

Technical Specifications

Wavelength Range: 190- 1100 nm

Spectral Band width: 4nm

Lamp type: xenon flash lamp


8
Durability: 5x 10 fleshes, corresponding to at least 13000 h permanent operation

Monochromator type: Grating Monochromator with step motor

Wavelength calibration: automatic

Max. scan speed: Approx. 3300 nm/min

Light sensor: photodiode

Photometric measuring range: ±3.3 A

Colorimeter/Photometer

The instrument shall be capable of colorimeter tests for more than 90 parameters, from aluminum
to zinc for testing natural waters. The instrument should be designed specifically for field testing.
The instrument shall be water proof, dust proof and should have a chemical resistant housing. The
instrument should have simple, push-button program selection and step-by-step prompts that guide
users through each testing procedure.

Technical Specifications:

Wavelength Selection : Auto select

Photometric Range : 0 to 2 A

Operational Modes : Concentration, ABS, %T

Aug. to Sankheda Part-I RWSS Page No.- 38


Volume – III: Data Sheet GWSSB

Concentration Unit : ug/L, mg/L, g/L, ABS, %T

External Outputs : RS 232 via Data Transfer Adapter (optional)

Data logging : 50 sample readings (each reading includes


date/time, parameter, program number
concentration, absorbance,
% transmittance, sample number, instrument
serial number)

User programs each : Five user-entered programs, 12 data points

Display parameter : Large liquid-crystal display (LCD) displays results,


name, and units

Power : 4 AA alkaline

Storage Temperature Range : -40 to 60 deg.C

Operating Temperature Range : 0 to 50 deg. C

Environmental : Meets IP67 standard, dustproof and waterproof to


one for at least 30 minutes

Laboratory p H Meter

Instrument should able to give quick and easy pH measurements. Instrument should have large LCD
display. Instrument should have RS232 interface with data logging facility.

Technical Specifications

Range: pH: -6.00 to 20.00, mV: -2000 to 2000 mV, Temp: -10.0 to 120.0°C

Resolution: pH: 0.01 pH, mV: 1.0 mV,Temp: 0.1°C

Accuracy: pH: ±0.01 pH, mV: ±0.05 % full scale ± 1LSD, Temp: ±0.5°C

Bench top Multi parameter meter: A multi parameter instrument capable of analysis of pH, ORP,
dissolved oxygen, conductivity, TDS, salinity and temperature shall be provided. The instrument
shall be capable of a quick response and have a intuitive user interface. The instrument shall have
automatic temperature correction/compensation. Downloading and storage of data should be easy
and convenient .It shall provide RS-232 interface and shall have a minimum of 150 points recall
feature.

Technical Specifications:
Range: pH : - 2.00 to 19.999
ORP: ± 2000 mV mV: ± 2000 mV
Conductivity : 0 to 199.9 µS/cm;
200 to 19,999 µS/cm;
2 to 199.9 mS/cm;
20 to 199.9 mS/cm.
Aug. to Sankheda Part-I RWSS Page No.- 39
Volume – III: Data Sheet GWSSB

TDS : 0 to 50,000 mg/L as NaCl


Salinity: 0 to 42 ppt (%)
Dissolved Oxygen: 0 to 20.0 mg/L (ppm); 2 to 100%
saturation Temperature : pH Test: -10 to 110 °C (-50 to 230 °F)
Cond. Test: -10 to 105 °C
DO Test: 0 to 50 °C
Resolution : pH : 0.1/0.01/0.001 (selectable)
ORP : 0.1 mV
mV: 0.1 mV
Conductivity: 0.00 to 19.99 µS/cm; 20.0 to 199.9 µS/cm; 200 to 1999 µS/cm;
2.00 to 19.99 mS/cm; 20.0 to 199.9 mS/cm; 0.01 µS/cm;
0.1 µS/cm; 1 µS/cm; 0.01 mS/cm;
TDS : 0.00 to 199.9 mg/L; 200 to 1999 mg/L; 2.00 to 19.9 g/L; 20.0 to 50 g/L;
0.1 mg/L; 1mg/L; 0.01 g/L; 0.1 g/L
Salinity: 0.1 ppt
Dissolved Oxygen : 0.01 or 0.1 mg/L; 0.1% saturation
Temperature : 0.1 °C
Accuracy: pH: ± 0.002
ORP: ± 0.2 mV or ± 0.05% of reading, whichever is greater. mV: ± 0.2 mV or
± 0.05% of reading, whichever is greater.
Conductivity: ± 0.5% of range
TDS: ± 0.5% of full scale Salinity: ± 0.1 ppt (-2 to 11 °C)
Dissolved Oxygen: ± 1% full scale Temperature: ± 0.3 °C at 0 - 70 °C;
± 1.0 °C at 70 - 110 °C

Laboratory Turbidity Meter

Turbidity meter shall have pre-programmed features for measurement of turbidity with ratio color
correction covering the range from 0 to 10,000 NTU with auto signal averaging. Turbidity meter
should come along with the following accessories: A complete set of calibration standards (0.02,
10, 100, 1750 NTU), Two measuring corvettes with light shield caps, Operators’nd
plugmanual,inpoweradaptor

Technical specifications

Principal of operation: Nephelometric

Light Source: Infra red

Extended auto ranging up to 10,000 NTU 0

- 2,450 EBC 0

- 10,000 FNU 0

- 10,000 FAU

Resolution: 0.0001 NTU on lowest range

Aug. to Sankheda Part-I RWSS Page No.- 40


Volume – III: Data Sheet GWSSB

Accuracy: ± 2% to ±10% of reading (in 3 ranges)

Response time: less than 6 seconds

Sample size: 30 ml

Air purge: connection for external dry air supply

Auto alert calibration prompt.

Outputs: RS-232 Serial Port

Reusable Calibration Standards

Certification: UL, CSA, CE, ISO7027

Instrument should have option for connecting flow thru cell.

Portable Turbidimeter

The instrument should have microprocessor-control operation and Ratio optics to bring greater
accuracy, sensitivity and reliability to field testing. The instrument shall compensate for color in
the sample, light fluctuation and stray light, allowing analyst to achieve laboratory-grade
performance on a wide range of samples, under a wide range of conditions.

Technical Specifications

Ranges : 0 - 1000 NTU in automatic range mode;

0-9.99, 0-99.9 and 0-1000NTU in manual range selection.

Accuracy : ±2% of reading or ±1Least significant digit up to 500 NTU

±3% of reading above 500 NTU to 1000 NTU

Repeatability : ± 1% of reading or ±0.01NTU, whichever is greater.

Resolution : 0.01 NTU on lowest Range

Stray Light : < 0.02 NTU

Sample required : 15 ml

Dissolved Oxygen Meter

Meter should be microprocessor based hand held type instrument with rugged & field proven design
and should be easy to operate with less maintenance. Dissolved Oxygen meter should come along
with the following:

Aug. to Sankheda Part-I RWSS Page No.- 41


Volume – III: Data Sheet GWSSB

12FT cable and probe


Battery Alkaline 4NOS 1.5V EACH
Instruction Manual
Hardware Kit Fitted
Kcl soln,
Membrane, O-RING SET
Technical Specifications

Range: Dissolved Oxygen 0 –20 mg/L, 0 –200 % air

Temperature - 5 to 45o C
Accuracy: Dissolved Oxygen ±0.3 mg/L, 2%.

Temperature ±0.4o C
Resolution: Dissolved Oxygen 0.01 mg/L, 0.1% air

Temperature 0.1 o C
Dissolved Oxygen Sensor: Steady-state polarographic
Salinity compensation: Desired
Altitude compensation: Desired
Temperature Compensation: Automatic
Power: Battery operation
Cables: 12 feet or more
Other features: Backlit Display
Built-in calibration chamber Waterproof, IP 65

Residual Chlorine Meter:


The instrument should be a handy model which should be capable of analyzing three water quality
tests. Instrument should be simple to use and should display error messages as and when they
occur. The instrument should be pre-programmed to conduct the following tests: pH 6.8 –8.6

Chlorine 0 –5.0 ppm

Alkalinity 0 –500 ppm In addition, Instrument should include the following: In transclam packing
with reagents for 100 free chlorine tests, Crushing rod and 2 test cells. The instrument should be
provided with a operations & instructions manual.

Aug. to Sankheda Part-I RWSS Page No.- 42


Volume – III: Data Sheet GWSSB

Associated Lab Equipment:

Sterilizer, Autoclave

Purpose: For sterilization of glassware and culture media for bacteriological analysis.

Double wall construction with inner & outer chamber made of Aluminum. Electrically heated by
means of superior quality emersion heaters with working pressure 15 PSI. Inner Chamber Size:
550X750mm. Rating: 6.0 KW, Volume: 175litre.

Balance, Analytical (Electronic)


Purpose: For preparation of standard solutions used in chemical analysis. Specifications: Should be
based on E.M.F.C. Technology
Type: Electronic single Pan, Capacity: 200 mg, Resolution: 0.1 mg, Stainless steel weighing pan;
Pan size: 100 mm Diameter, Display: Sharp, Clear LED Display and Standard bi-directional RS232C
interfaces. Multiple weighing Units: Grams & Carat. It should have auto calibration facility,
Overload protection and auto zero facility. Balance should come along with Set of certified
calibration weights, Voltage stabilizer, Dust proof cover, Operational manual and necessary tools.

Centrifuge: Purpose: For Separation of Suspended matter from suspension.


Specifications:
Max. Speed: 20000 RPM, Max. RCF: 34500, Max. Tube size: 100 ml, Max. Capacity: 400 ml. Width:
450 mm , Depth: 470 mm ,Weight: 11 kg
Connected Load: 0.75Rotor Angle Head: 8x50 ml Speed regulation: Step less variable speed control.
Digital Speed indicator: 1to 99 minutes digital timer with by-pass switch for infinite time run.

Incubator Bacteriological:
Purpose: For incubation in bacteriological analysis
Double walled cabinet. Outer wall should be made of mild steel, inner wall of stainless steel,
lagged with a special insulating material. The inside door should be made of glass panel set in a
metal frame fitted with a felt gasket and be fastened by a ball catch.
Temperature range: 5°C above ambient to maximum 60°C. Accuracy: ±2°C
Size: 600 X 600 X 600cm
Rating: 1000 Watts.

Refrigerator:
Purpose: For cooling and storage of (standard) solution in a laboratory

Specifications:

Aug. to Sankheda Part-I RWSS Page No.- 43


Volume – III: Data Sheet GWSSB

Type: Vertical double door


Capacity: approx: 280 litre.

Water Bath, General Purpose:


Purpose: For enhancement of chemical reaction in various analyses and evaporating of water from
samples
Specifications: Doubled walled construction Fitted with imported thermostat of 30 Deg C to 110 °C
Accuracy of +/- 1 Deg C.Working Temp. from 5 Deg C above ambient 80 °C made of double wall,
stainless steel construction, with glass wool

Capacity: 15 Ltrs,12 holes of 75 mm dia , 2000 Watts

Water Purifier, Distillation Unit (Automatic)


Purpose: For generation of reagent water type III which is used for washing and quantitative
analysis.
Made of stain less steel, vapor baffle, condensing tube and lid are stainless steel This is fitted with
immersion type element.
The stopcock fitted to the unit.
The still is provided with wall mounting iron bracket to be fixed on the wall which the still can rest.
Supplied with 3 core wire and plug to work on 220 Volts
AC Capacity: 2 Litre
Load: 2 K.W
Low water cut-off device for 2 liter and 4-litre cap

Aug. to Sankheda Part-I RWSS Page No.- 44


Volume – III: Data Sheet GWSSB
Minimum Thickness to be adopted for Water Treatment Plat Structures

a) Inlet Chamber & RW Channel (RCC)


Vertical Minimum Thickness 150 mm
Bottom/Floor slab Minimum Thickness 200 mm
Channel between Inlet
Min. thickness 100mm
chamber & flash Mixer
Parshall flume Min. thickness 100mm

b) Flash Mixer (RCC)


Vertical Minimum Thickness 150 mm
Bottom/Floor slab Minimum Thickness 200 mm
Constant dosing Chamber Of Adequate size.

c) Clariflocculator (RCC)
Minimum Thickness 200 mm with Ring
Central hollow column
Beam at Top.
Opening Flocculator wall
Minimum Thickness 150 mm
(Partition wall)
Clarifier outer wall Min. thickness 150mm
Launder Min. thickness 100mm
Channel–Clariflocculator to filter
Min. thickness 100mm
inlet channel
Floor slab Min. thickness 200mm
Inlet pipe to Clariflocculator and wash out
To be embedded in M 150 concrete.
pipe.
Walkway with railing Min. Width 1000 mm
Precast blocks covering channel Min. thickness 7 5 mm & Max. gap 100mm

MS ladders/stairs shall be provided to climb up/reach top of all units from G L Independently.

d ) Rapid Sand Filter (RCC)


Filter Vertical wall Minimum Thickness 150 mm
Filter Floor slab Minimum Thickness 150 mm
Walkway/plateform Min. thickness 150mm 7 Width 1000 mm
Filter gallery slab–for operation of valves etc Min. thickness 150mm
Filter Inlet Channel– Min. thickness 100mm
Filter Clear Water Channel. Min. thickness 100mm
Pipe gallery clear width Min.2500mm
Head room above pipe gallery floor.
Min.3000mm

Troughs/gullet Min. thickness 100mm

e) Chemical House& Filter house


Column size Min. 300mm x300mm Or having

Aug. to Sankheda Part-I RWSS Page No.- 45


Volume – III: Data Sheet GWSSB

Staircase –Width Min. 1000 mm


Staircase –Rise Max. 150mm
Staircase –Tread Min. 300 mm
Floor Height-GF&FF Min. 3500 mm (clear)
Brick wall (outer) MinimumThickness230mm
Minimum Thickness:-130mm.(
Roof slab Min.200mm if Wash Water tank is to
be placed over Chemical House)
Floor slab Min. thickness 150mm

f) Chlorine storage room


Floor height
Minimum6000 mm

Note: Door size should be such that truck can be taken in side for unloading the Tonners
/chlorine cylinders).
Parapet wall Min. height750 mm
Door window Approx. 25%asper std. practice/as per
opening sizes. site condition.
Rain water drain
Adequate size from terras to GL.
pipes

g) Wash Water Tank.


Vertical Minimum Thickness 150 mm
Bottom/Floor slab Minimum Thickness 200 mm
Roof slab Min. thickness 130mm

Separate space should be provided for installation of pumps for filling wash water tank in time as
per design.

h) Recirculation sump
Vertical Minimum Thickness 150 mm
Bottom/Floor slab Minimum Thickness 150 mm

Proper Drainage arrangement/pipe line shall be provided to drain the sludge in to nearby Nalla.

Signature of Bidder
Executive Engineer
Public Health Works Division,
Chhotaudepur.

Aug. to Sankheda Part-I RWSS Page No.- 46


Volume – III: Data Sheet GWSSB

Major Submittals WTP Drawings & Documents for Approval

Sr. No. Description

1.0 BASIC ENGINEERING PACKAGE

1.1 Water Balance Diagram

1.2 Process & Unit Size Calculations

1.3 Plant Layout

1.4 Piping & Instrumentation Diagram (P & ID)

1.5 Hydraulic Calculations

1.6 Hydraulic Flow Diagram (HFD)

1.7 Electrical Load List

1.8 Equipment List for Civil, Mechanical, Electrical & Instrumentation works

1.9 Single Line Diagram (SLD)

DETAILED ENGINEERING PACKAGE


GA drawings, Data Sheets, QAP (from Equipment supplier) for Electro-Mechanical
2.0
works covering all details for equipment provided confirming to tender requirements
Mechanical:

2.1 Agitator for Flash Mixer

2.2 Clariflocculator

2.3 Sluice Gates

2.4 Valves

2.5 Chlorination system with Booster Pumps

2.6 Backwash Pumps for filling Backwash OHT

2.7 Air Blowers for Filter media air scouring

2.8 Clear water pumps

2.9 Lifting Equipments (EOT/HOT/Hoist/Chain Pulley block)

3.0 Piping

3.1 Constant head tank

3.2 Sludge pump

3.3 Recirculation pumps


Aug. to Sankheda Part-I RWSS Page No.- 47
Volume – III: Data Sheet GWSSB

3.4 Lab Instrument list with specifications

3.0 Electrical & Instrumentation

3.1 Fault Level & Sizing calculations for Incomer Breakers, Capacitors & Power Cables etc.

3.2 Switchyard

3.3 Transformer

3.4 HV/LV metal enclosed Switchgears

3.5 LT APFC Panel(s)

3.6 Local Control Stations/Consoles

3.7 Instrument Indicator Panel (where applicable)

3.8 PLC Based Control System/ SCADA (where applicable)

3.9 Layout drawings for Electrical Rooms, Cabling, Lighting, Earthing & Lightning Systems.

4.0 Instrument Location Plan/ Hookup Diagram

4.1 Flow, Level, Pressure & Temperature Measuring/ Indicating Instruments (as applicable)

4.2 Online Process Analyzers (where applicable)

4.3 Battery & Battery Charger/UPS (where applicable)

CIVIL GA drawings
4.0
Process Units

4.1 Cascade Aerator with Peripheral Launder and Inlet Pipe

4.2 Flow Measuring Unit

4.3 Flash mixer

4.4 Clariflocculator

Filter House incl. Annex building, air blower room, filtered water channel, Post
4.5
Chlorination chamber etc.

4.6 Under Drain System for Filter

4.7 Chlorinator Room and Chlorinator Tonner Room

4.8 Backwash Water Tank

4.9 Backwash water Pump House

5.0 Clear Water Storage Tank & its pump house

Aug. to Sankheda Part-I RWSS Page No.- 48


Volume – III: Data Sheet GWSSB

5.1 Dirty backwash recirculation sump & Pump house

5.0 Other Units

Chemical House with required Administration/Laboratory/Chemical Dosing


5.1
Tanks/Control Panel, HT/LT room, transformer yard etc.

5.2 Staff Quarter, security cabin ,as Applicable

5.3 Any other as applicable

6 STRUCTURAL DRAWINGS

6 Process Units

6.1 Cascade Aerator with Peripheral Launder and Inlet Pipe

6.2 Flow Measuring Unit

6.3 Flash mixer

6.4 Clariflocculator

Filter House incl. Annex building, air blower room, filtered water channel, Post
6.5
Chlorination chamber etc.

6.6 Under Drain System for Filter

6.7 Chlorinator Room and Chlorinator Tonner Room

6.8 Backwash Water Tank

6.9 Backwash water Pump House

7 Clear Water Storage Tank & its pumphouse

7.1 Dirty backwash recirculation sump & Pump house

7.0 Other Units

Chemical House with required Administration/Laboratory/Chemical Dosing


7.1
Tanks/Control Panel,HT/LT room, transformer yard etc.

7.2 Staff Quarter, security cabin ,as Applicable

7.3 Any other as applicable

Note-
• The list is indicative and may vary or require additional documents/Drawings as per the
tender requirement.
• All the drawings should be To the Scale , unless otherwise specified.
• All the drawings should be as per the specified paper size.

Aug. to Sankheda Part-I RWSS Page No.- 49


Volume – III: Data Sheet GWSSB

SECTION- 4:

TECHNICAL SCHEDULE: MECHANICAL WORKS.


Schedule - B-8 and B-15:

Data Sheet for Electro Mechanical Works

DATA SHEET FOR VERTICAL TURBINE PUMPS

Name of Pumping Station


Sr. No. Description Particulars Particulars by
Bidders
1.1 Pump Type Vertical Turbine

1.2 Number of pumps As per price bid

1.3 Number of normally working As per price bid


pumps(nos.)
1.4 Design capacity of each pump As per price bid
(m3/hr.)
1.5 Minimum total head at design As per price bid
capacity (Mtr.)
1.6 Bowl Efficiency As per price bid

1.7 Pump Efficiency To be furnished by Bidder

1.8 Direction of rotation (viewed from


To be furnished by Bidder
top)
1.9 Total duration of operation Continuous

1.10 Speed(RPM) 1500

1.11 Submergence available (Mtr.) As per HIS or CPHEEO Manual

1.12 NPSHr at duty point and and To be furnished by Bidder


maximum flow
1.13 GD2 Value of Pump To be furnished by Bidder

1.14 General Arrangement drawing with To be furnished by Bidder


foundation plan
1.15 Static load & Dynamic Load To be furnished by Bidder

2.0 Feature of Construction

2.1 Type of lubrication Self-water lubricated

Aug. to Sankheda Part-I RWSS Page No.- 50


Volume – III: Data Sheet GWSSB

2.2 Type of coupling Shaft Drive

2.3 Number of stage Bidder to specify

2.4 Column size To be furnished by Bidders

2.5 Discharge level with respect to floor Above floor

Liquid Data

2.6 Liquid handled Raw water

2.7 Temperature Ambient temp.

3.0 Material of Construction

3.1 Base plate M.S. IS 2062 , E 250 Gr.B

3.2 Discharge elbow M.S. IS 2062 , E 250 Gr.B

3.3 Column pipe MS ERW IS 3589

C.I. having 1.5 to 2.0% Nickle


3.4 Suction bell
Cast Iron I.S 210 GrFG260

C.I. having 1.5 to 2.0% Nickle


3.5 Pump casing / Impeller bowl
Cast Iron I.S 210 GrFG260

3.6 Impeller Stainless steel CF8M

Stainless Steel 410 (IS 1570


3.7 Line shaft with coupling
(part V) Gr. X12Cr12)

Stainless Steel 410 (IS 1570


3.8 Impeller shaft
(part V) Gr. X12Cr12

Stainless Steel 410 (IS 1570


3.9 Head shaft
(part V) Gr. X12Cr12

3.10 Shaft coupling Stainless steel SS316

3.11 Line bearing Thordon type

3.12 Thrust bearing Ball/Roller type

3.13 Suction strainer Stainless Steel AISI – 304 (M)

3.14 Shaft sleeves S.S ASTMA 351 CF8M

3.15 Hardware in contact with water SS 304

3.16 Companion flanges M.S. as per IS 1538

Aug. to Sankheda Part-I RWSS Page No.- 51


Volume – III: Data Sheet GWSSB

4.0 Accessories & Services required

4.1 Base plate YES

4.2 Foundation bolts YES

4.3 Suction strainer YES

4.4 Companion flanges YES

4.5 Spares parts recommended YES

4.6 Maintenance tools YES

4.7 Start-up / essential spares YES


YES (Corrosion resistant epoxy
4.8 Painting
paint)
5.0 Testing

5.1 Hydrostatic test YES to be witnessed

Ultrasonic test not to be


witnessed but certificate for
5.2 Pump casing
testing during manufacturing to
is to be produced.

5.3 Performance test YES to be witnessed

5.4 Standard running test YES to be witnessed

5.5 Static balancing test Required

5.6 Dynamic balancing test YES to be witnessed

5.7 Visual inspection check Required

Aug. to Sankheda Part-I RWSS Page No.- 52


Volume – III: Data Sheet GWSSB
DATA SHEET FOR SUBMERGED CENTRIFUGAL PUMP

Name of Pumping Station

Particulars by
Sr. No. Description Particulars
Bidders
1. Make of pumpset As per GWSSB approved make

2. Model To be furnished by bidders

3. No of Pumps As per price bid

4. Design Capacity As per price bid

5. Total Head As per price bid

6. Shut off Head To be furnished by bidders

7. Rated speed (rpm) 1500

8. Type of casing Volute

9. Pump Efficiency @ duty point (min.) As per price bid

10. BkW at Duty Point As per price bid

11. Rated Motor Efficiency Bidder to furnish

12. Overall Pump Set Efficiency Bidder to furnish

13. Motor Input @ Duty Point Bidder to furnish

14. Motor Rating As per price bid

15. Class of Insulation of Motor F

16. Fill of Motor Air


heavy duty Ball or Roller
bearings with a minimum L10
17. Type of Bearing and its rated L10 life
life of 75,000 hours as per BS
5512
18. Type of Lubrication Greased

___mm² x ___Core
Power
19. Cable size & MOC x___ Runs ___mm²
cables
x ___Core

Control x___ Runs


Cables ___mm² x ___Core
x___ Runs

Aug. to Sankheda Part-I RWSS Page No.- 53


Volume – III: Data Sheet GWSSB
MOC Of Al/ Cu
Conductor

Pumps suction and Delivary nozzle


20. Bidder to furnish
Size

Aluminium Die Cast or Dual


21. MOC of Motor Rotor's Squirrel Cage
Cage Copper Bar

Stainless Steel (SS 410 or SS 430


22. MOC of Motor Pump Shaft
or 1.4021 or 1.4460
Pumps with Head ≤ 80 m &
Delivery Size ≤ DN 100 mm CI
IS: 210 Grade FG 260 or GG25
or EN JL1040
Pumps with Head ≤ 60 m &
Delivery Size ≤ DN 125mm CI
IS: 210 Grade FG 260 or GG25
23. MOC of Pump Casing or EN JL1040
Pumps with Head > 60 m &
Delivery Size > DN 125 mm or
Pumps with Head > 80 m
Ductile Cast Iron or Cast Steel
(SG 400/12 or EN -JS1050 or
GGG 40 or ASTM 80 -55 -06 or
WCB)
Cast Austenitic Stainless Steel
24. MOC of Impeller (SS 316 or CF 8M or 1.4406)

Cast Austenitic Stainless Steel


25. MOC of Impeller's Wearing Ring
(SS 316 or CF 8M or 1.4406)
Cast Austenitic Stainless Steel
26. MOC of Casing's Wearing Ring
(SS 316 or CF 8M or 1.4406)
MOC of Autocoupling Guides Guide Rail Pipes/ Wires & F.
27.
pipe/weir Bolts SS 304 or Higher grade

28. Weight of Pump Sets kg


Wether the Testing of pumps at
manufacturer's works shall be offered
29. with Full Bore Electromagnetic or Yes
Ultrasonic Flow Metre of Maximum
0.5% accuracy class?
Whether the pump sets are
competible with VFD & wether the
30. Testing of pumps at Manufacturer's Yes
works shall be offered with Variablre
Speed Drives?

Aug. to Sankheda Part-I RWSS Page No.- 54


Volume – III: Data Sheet GWSSB

DATA SHEET FOR LV INDUCTION MOTORS


(for Vertical Turbine Pumps )

TECHNICAL PARTICULARS (to be


SL.NO. DESCRIPTION UNIT
filled by bidders)
1.0 GENERAL
APPLICATION
NUMBERS REQUIRED
TYPE OF MOTOR
As per system fault level
SUPPLY SYSTEM FAULT LEVEL kA
calculation
TYPE OF EARTHING OF SUPPLY
Solidly earthing
SYSTEM NEUTRAL
2 NO. OF STARTS/Hr
HOT STARTS Nos. 3
COLD STARTS Nos. 2
3 RATING
RATED OUTPUT : kW 250
RATED VOLTAGE : V 415
NUMBER OF PHASES & FREQUENCY 3 Phase , 50 Hz
SYNCHRONOUS SPEED RPM 1450
4 DUTY
TYPE OF DUTY (CLAUSE 9.2 OF
S1
IS:325 OR EQUIVALENT)
POWER REQUIRED BY LOAD kW

5 METHOD OF STARTING ATS


6 INSULATION
CLASS OF INSULATION F
REF. AMBIENT TEMPERATURE deg.C 45
TEMPERATURE RISE OF WINDING BY CORRESPONDING TO CLASS – B
deg.C
WDG RESISTANCE METHOD INSULATION
7 INSTALLATION
LOCATION INDOOR / OUTDOOR
8 ENCLOSURE
TYPE OF COOLING
DESIGNATION FOR DEGREE OF
PROTECTION
9 MAIN TERMINAL BOX

Aug. to Sankheda Part-I RWSS Page No.- 55


Volume – III: Data Sheet GWSSB

LOCATION AS SEEN FROM NON-DRIVE


RIGHT/LEFT
END:

PHASE SEGGREGATED YES/NO

RATINGS (a) SHORT TIME i.


kA(RMS)
CURRENT :
ii. DURATION : SECS. 0.25
(b) DYNAMIC : kA(PEAK)
10 EXTERNAL CABLE DETAILS
TYPE
SIZE & NO OF CORES
11 EARTHING CONDUCTORS
MATERIAL
SIZE
TO BE FILLED IF MOTORS ARE
12 MISCELLANEOUS REQUIREMENTS
BOUGHT SEPERATELY

HORIZONTAL/VERTICAL/
SHAFT ORIENTATION
HOLLOW VERTICAL

MOUNTING SYMBOL (IS:2253 OR


EQUIVALENT)

ROTATION AS SEEN FROM NON-


CLOCKWISE/ANTI-CLOCKWISE
DRIVE END
13 TYPE OF BEARING
DRIVE END
NON DRIVE END
14 WHETHER BED PLATE REQUIRED YES/NO

MOTOR SHALL MATCH THE


15 FOLLOWING TORQUE REQUIREMENTS
OF THE DRIVEN EQUIPMENT:

STARTING TORUE
FULL LOAD (RATED) TORQUE
PULL OUT TORQUE
PULL UP TORQUE

16 COUPLING BY MOTOR SUPPLIER YES/NO

IF YES, TYPE OF COUPLING


17 COLOUR SHADES OF PAINT

18 WHETHER VIBRATION SENSORS YES

Aug. to Sankheda Part-I RWSS Page No.- 56


Volume – III: Data Sheet GWSSB

TEMPERATURE
19
DETECTORS/INDICATOR
EMBEDDED TEMPERATURE
Nos 6 nos. Duplex
DETECTORS FOR WINDING REQUIRED
EMBEDDED TEMPERATURE
DETECTORS FOR BEARINGS Nos 2 nos. Duplex
REQUIRED
BEARING THERMOMETERS FOR
DRIVING END & NON DRIVING ENDS Nos 2 nos.
REQUIRED
SPACE HEATERS FOR MOTORS
20 YES/NO Yes
REQUIRED

Aug. to Sankheda Part-I RWSS Page No.- 57


Volume – III: Data Sheet GWSSB

DATASHEET FOR BUTTERFLY VALVES

SL. Particulars by
Description Particulars
NO. bidder
1 General
As per GWSSB approved
1.1 Make
make
1.2 Type Double flanged

1.3 Applicable standard IS 13095-1991/BS 5155

2 Size ,Pressure rating & Quantity As per Price BOQ

3 Material of Construction

3.1 Body/Disc CI IS 210 FG260

3.2 Body Ring(Retainer /seat) Stainless Steel,AISI-304

3.3 Shaft Stainless Steel ,AISI-410

3.4 Disc Seat EPDM/Nitrile Rubber

3.5 Bush and Thrust Pad GM IS:318 LTB-2/Teflon

3.6 Internal Hardware SS AISI-304

4.0 Hydrotest Pressure


4.1 Body 2.4 MPa
4.2 Seat 1.6 MPa

Aug. to Sankheda Part-I RWSS Page No.- 58


Volume – III: Data Sheet GWSSB

DUAL PLATE CHECK VALVES


Sr.
Description Particulars Particulars by Bidders
No.
1 General

1.1 Make As per GWSSB approved make

1.2 Type Dual Plate Check valve

1.3 Applicable standard API 594 & 598

2 Size , Rating & Quantity As per Price BOQ

3 Material of Construction
Body,cover,door,bearing
3.1 Grey CI, IS-210,FG 260
holder
Hinge pin,door pin &
3.2 SS,IS-6603,12Cr12
door/suspension pin

Body seat ring,Door Face


ring,Bearing bushes/Bearing Leaded Tin Bronze,IS-318,
3.3
block,Plugs for hinge pin/Air Gr.LTB-2
release

3.4 Nuts CSL, IS-1363(P-3),CL 4.0

3.5 Bolts CSL, IS-1363(P-3),CL 4.6

4.0 Hydro Test Pressure


4.1 Body 1.5 MPa
4.2 Seat 1.0 MPa

Aug. to Sankheda Part-I RWSS Page No.- 59


Volume – III: Data Sheet GWSSB

DATA SHEET FOR EXPANSION BELLOWS

Departmental
Particulars Bidder's Data
Requirement
Sr.
No. Component Material
1.0 Type D/F SS Expansion bellow
1.1 Rating of valves PN 1.0
1.2 Sizes and quantity As per price bid
1.3
Bellows / Collar / Internal sleeve SS 304
1.4
CS IS :1367, CL-4.6 (Hot
Limit Rods
Dipped Galvanised)
1.5
CS IS :1367, CL-4.0 (Hot
Nut & lock nut
Dipped Galvanised)
1.6 Flanges IS: 2062 Gr. B
1.7 Seal EPDM RUBBER

Aug. to Sankheda Part-I RWSS Page No.- 60


Volume – III: Data Sheet GWSSB
Electrical Operated Overhead Travelling (E.O.T.) Cranes-Circular Type

Sr.
Description Particulars Particulars by Bidders
No.
1.1 Bidder to furnish. (It shall be as
Make
per approved vendor list)
1.2 M-5 ( Class II) duty, indoor
Applicable Standards operation conforming to IS: 807,
IS: 3177, IS: 3938 and IS 13834.
1.3
Capacity (Tones) 3T
1.4
Safe working load (Tones) Bidder to furnish
1.5
Recommended Rail To be Furnished By Bidders.
1.6
Quantity 1 no. at Pump-house
1.7
Class / Duty To be furnished by Bidders
1.8
Lifting Height(m) 15 (Minium)
1.9 Span (m) (FOR Pump
Bidder to furnish
House )
1.10
Type of Girder Single Girder , Circular
1.11 Floor Operated, Through Down
Method of operation
Pendant P. B. Station
1.12
Hook Approach(Mtr.) 0.5 m
2.0
Operating speed (loaded)
2.1
Main Hoist (m / min.) To be Furnished By Bidders
2.2
Cross Travel m / min. To be Furnished By Bidders
2.3
Long Travel m / min. To be Furnished By Bidders
3.0
Type of hook Solid forged steel, IS: 3815
4.0
Hoisting Rope To be Furnished By Bidders
4.1 Diameter (mm)

4.2 Construction
4.3 Core

4.4 Make To be Furnished By Bidders

5.0 Factor of safety To be Furnished By Bidders

6.0 Description of Brakes To be Furnished By Bidders

Aug. to Sankheda Part-I RWSS Page No.- 61


Volume – III: Data Sheet GWSSB

6.1 Hoisting
6.2 Cross travel motion
6.3 Long travel motion
7.0 Motor for hoisting To be Furnished By Bidders

7.1 Make

7.2 Type

7.3 Rating

8.0 Motor for Cross Travel To be Furnished By Bidders

8.1 Make

8.2 Type

8.3 Rating

9.0 Motor for Long Travel To be Furnished By Bidders

9.1 Make

9.2 Type
9.3 Rating
9.4 Drive
Details of brakes for
10.0 To be Furnished By Bidders
hoist motion
Make of electro magnetic
10.1
brake
10.2 Make of electro hydraulic

10.3 thrust Brake

10.4 Design holding torque

11.0 Gantry Girder To be Furnished By Bidders

12.0 Motor To be Furnished By Bidders

12.1 Rated Voltage, Ph, Freq. 415 V, 3 Phase, 50 Hz

12.2 Supply / Control Voltage 415 / 110 V


GA drawing indicating
overall dimensions
13 To be Furnished By Bidders
weight, height and
necessary details
14 MOC & Test Certificate To be Furnished By Bidders

Aug. to Sankheda Part-I RWSS Page No.- 62


Volume – III: Data Sheet GWSSB
FULL BORE ELECTROMAGNETIC FLOW METER

Sr. No. Description Particulars Particulars by Bidders

1 Make As Per Approved Make List


Model No (Sensor +
2
Transmitter)
3 Meter Size Suit to Process Line

4 Flow Sensor

a) Type Pulsed DC excitation

b) End Connections Flanges of Carbon Steel,

PN 2.0 / As per piping


c) Flange Rating
specification

SS 316 (Stainless steel)


d) Electrode material
/Platinum /Tantalum

e) Meter tube SS 304 (Stainless steel)

Round head electrodes


f) Electrode type
(Bullet nose)

Hard Rubber (SBR or


g) Lining material
EPDM)/ Neoprene

h) Protection category IP 68

SS 304 with fully welded


construction or corrosion
i) Coil Housing
resistance material with
epoxy painting

j) Connection / Junction Box SS 304

k) Earthing Grounding Rings in SS 316

l) Fluid conductivity > 20  Siemens/cm

Direction of flow with


m) Marking
arrow, size, Sr. no, make

5 Flow Transmitter/Converter

Microprocessor based,
a) Type Modular Design, remote
mounting

Aug. to Sankheda Part-I RWSS Page No.- 63


Volume – III: Data Sheet GWSSB

Measuring accuracy +/-


0.5% of Measured Value
inclusive of Linearity,
b) Measuring accuracy repeatability, Pressure
Effect and Hysterics
between 0.5 -4 m/s
velocity.
Min. 2 line back lit LCD
for indication of actual
c) Display
flow rate, forward,
reverse, sum totalizes
One Current output (4 –
20 mA) One scaleable
d) Outputs
pulse output One Status
output
e) Protection Category IP 67

Die Cast Aluminum with


f) Enclosure polyurethane finish with
glass window

Optical Pen Programming


or any other method of
g) Programming programming without
opening the cover of
display unit.
h) Power Supply 240 V AC, 50 Hz
½” NPT (4 glands of
i) Cable Gland
double compression type)

j) Mounting Wall mounted


k) Interface HART
Provision of RAM/PROM to
store parameter entered
l) Power failure mode
and measured flow data
during power failure
Up to 200mtrs. between
sensor & transmitter
m) Max. Separation
without any signal
boosters
Shock – Hazard –
n) Terminals protected push lock
terminals
Fully interchangeable
o) Interchangeability with all sizes of flow
sensors
General purpose
p) Safety classification
certification

6 Test Certificate Required


7 Calibration Certificate Required

Aug. to Sankheda Part-I RWSS Page No.- 64


Volume – III: Data Sheet GWSSB
PRESSURE GAUGE

Sr. No. Description Particulars Particulars by Bidders

As Per Approved Make


1 Make
List

2 Model No

3 Type Bourdon

4 Dial Size 150 mm

5 Accuracy ± 1 % or better

6 Overall range protection 150%

7 Blow out Disc SS304

8 Weather Protection IP67

9 Housing Material SS304

10 Pressure Element MOC SS304

11 Movement MOC SS304

12 Socket MOC SS304

13 Glass Type Instrument Glass

14 Process connection ½” NPT

15 Process connection Bottom

Micrometer type
16 Pointer
adjustable pointer

17 Name Plate Required

18 Mounting Bracket Required

19 Snubber Required

20 Gauge cock Required

21 Installation Hardware Required

22 Codes & Standards EN 837-1

23 Test Certificate Required

24 Calibration Certificate Required

Aug. to Sankheda Part-I RWSS Page No.- 65


Volume – III: Data Sheet GWSSB
TEMPER PROOF AIR VALVE

Sr. No. Description Particulars Particulars by Bidders

GENERAL
Design and Manufacturing
1 AWWA C512
Code
Size \Qty\Pressure Rating
2 As per Price Bid
(PN)
3 Ends Flanged

4 Type Temper Proof


MATERIAL OF
CONSTRUCTION (M.O.C)
1. Body Cast Iron
2. Float Stainless Steel
3. Cover Cast Iron
4. Seat Nitrile Rubber
5. Nozzle Bronze

6. Bolts and Nuts Carbon Steel

7. Gasket EPDM

Signature of Contractor Executive Engineer

Aug. to Sankheda Part-I RWSS Page No.- 66


Volume – III: Data Sheet GWSSB

VOLUME- IIIB
TECHNICAL DATA SHEET
(ELECTRICAL & INSTRUMENTATION WORKS)

Aug. to Sankheda Part-I RWSS Page No.- 67


Volume – III: Data Sheet GWSSB

ELECTRICAL WORKS

TABLE OF CONTENTS

Sr. No. Description


1.0 11KV Two Pole Structure
2.0 Distribution transformer 11 kV /0.433 kV
3.0 HT Metal Enclosed Switchgear
4.0 LT Metal Enclosed Switchgear (Main PMCC/MCC Panel /PDB/DB)
5.0 415 V LT APFC Panel
6.0 Power, Control, Instrumentation Cables
7.0 Earthing and Lightning Protection Systems
8.0 Lighting & Receptacle System
9.0 Maintenance-free Sealed Lead Acid / Ni-Cd Battery
10.0 Battery, Battery Charger & D.C. Distribution board
11.0 Equipments & Instruments
Note:
1.0 Technical Schedules cover only salient features of equipment offered by the
Contractor. The Contractor shall certify that the specification requirements as
covered in VOLUME-II are fully complied with, except those specifically brought out
in Schedule of Deviations from Technical Specification.
2.0 For (*) items, Bidder to provide Quantity/ Ratings based on Design Criteria &
Specification requirements. Ratings & Configuration, wherever specified (in
Technical specifications/ Data Sheets/ Price Schedule/ SLD) for equipments, shall
be minimum requirements. Electrical Switchgears/ Distribution Board Configuration
(components/ equipment/ protections/ metering/ instruments) shall be as per
indicated in typical reference SLDs & in line with design criteria & specification
requirements.
3.0 Bidder to provide completely filled data sheets for the below mentioned
equipments. As applicable, separate data sheets needs to be filled for each
equipment/ system covered under RWSS Scheme.

Aug. to Sankheda Part-I RWSS Page No.- 68


Volume – III: Data Sheet GWSSB

1.0 11 KV TWO / FOUR POLE STRUCTURE:

a) For installed (1W+1S) transformers cumulative rating ≤ 800 KVA, Four Pole Structure/ 2
Nos. of DP structure complete with all accessories as per requirement.
b) b) For installed (1W+1S) transformers cumulative rating > 800 KVA, single Two Pole
Structure complete with all accessories. Point of Supply Breaker Panel/RMU as per
requirement.

(A) LIGHTNING ARRESTERS:

To be confirmed
Sr. No. Description Unit Particulars
by Bidder
1.0 General
Designation Lightning Arrester
1.1
Make As per approved
1.2
make list
1.3 Applicable Standards As per Tender
Specification
1.4 Type Station Class type
1.5 Quantity (Min. 3 nos. per Nos. As Per
D.P.Structure) Requirement
1.6 Installation Outdoor
1.7 System voltage, No of Phases & kV 11kV, 3 Phase & 50
Frequency Hz
2.0 Ratings
Rated arrester voltage kV 9
2.1
Rated frequency Hz 50
2.2
2.3 Nominal discharge current of 8/20 KA 10
microwave shape (Station class)

2.4 Basic Insulation level of


equipments to be protected
a) Impulse withstand (1.2*50 micro KV(P) 75
sec)
b) 1 min. Power frequency withstand KV 28
voltage
2.5 Terminations -Clamps & Provided.
Connectors suitable for ACSR
conductor provided
3.0 Arrestor housing

3.1 Minimum creepage distance mm 25 mm / kV


Minimum cantilever strength of Bidder to Furnish
3.2 kN
arrester assembly
GA drawing Indicating Height, Bidder to Furnish
4.0 Weight, overall dimensions and
mounting arrangement details

Aug. to Sankheda Part-I RWSS Page No.- 69


Volume – III: Data Sheet GWSSB

(B) ISOLATOR (G.O.D)

Sr. No. Description Unit Particulars To be confirmed


by Bidder
1.0 General
Isolator (Gang
1.1 Designation Operated
Disconnectors)
As per approved
1.2 Make
make list
As per Tender
1.3 Applicable Standards
Specification
Vertically mounted
Double Air Break
1.4 Type
Central Rotating
Type
As Per
1.5 Quantity (1 Set per D.P.Structure) Sets
Requirement
1.6 Installation Outdoor

1.7 System voltage, No of Phases & kV 11 KV, 3 Phase &


Frequency 50Hz

2.0 Design Requirements


Ambient temperature °C 50
2.1
2.2 Rated Current *A As per System
Requirement
2.3 Short Time Rating KA 26.2 KA for 1 sec
2.4 Insulation level Full/ Full
Reduce
d
2.5 Phase spacing as per IS/CBIP & to *mm Bidder to Furnish
suit BIL & Lightning Impulse
Voltage
2.6 Earthing switch required to be Yes
provided and interlocked with
main switch
2.7 Height of mounting above GL mm As per IS/CBIP
2.8 Operating device for Isolator with Yes
Earth Switch – Manual with
Operating handle with reduction
gear and suitable electro-
mechanical interlock.
2.9 Orientation of operating Suitably mounted
mechanism box W.R.T isolator on DP
2.10 Auxiliary contacts (6NO+6NC) Make Yes/ No
before break
3.0 Insulator Data

3.1 Rated voltage KV 11

Aug. to Sankheda Part-I RWSS Page No.- 70


Volume – III: Data Sheet GWSSB
1 min. Power frequency wet flash-
3.2 KV 28
over voltage
3.3 Impulse flash-over : Positive Kv Bidder to Furnish
wave(1.2*50 micro sec) (peak)
3.4 Impulse withstand (1.2*50 micro kV 75
sec) (peak)
3.5 Creepage distance mm 25 mm per kV
3.6 Minimum Cantilever strength kN Bidder to Furnish

4.0 GA drawing Indicating Height, Bidder to Furnish


Weight, overall dimensions and
mounting arrangement details

(C) DROP OUT FUSE (D O FUSE)


Sr. No. Description Unit Particulars To be confirmed
by Bidder
1.0 General

1.1 Designation DO Fuse


As per approved
1.2 Make
make list
1.3 Applicable Standards As per tender
specification
Type
1.4
As Per
1.5 Quantity( 1 per DP Structure)
Requirement
1.6 Installation Outdoor
1.7 System voltage, No of Phases & kV 11 KV, 3 Phase &
Frequency 50Hz

2.0 Rating
2.1 Rated Current *A Bidder to Furnish
2.2 Insulator Rating Insulator 12 kV Porcelain 25
Creepage Distance Insulator mm / kV As per
Impulse withstanding relevant IS
2.3 Fuse Carrier Bakelite Tube
2.4 Contacts Spring Loaded
Phosphor Bronze
3.0 Operating Mechanism 12 KV 4 element
type operating rod
4.0 Connection Details ACSR Conductor

2.0 DISTRIBUTION TRANSFORMER


Sr. No. Description Unit Particulars
To be confirmed
by Bidder
1.
Manufacturer's Name And Country
Bidder To Furnish
Of Manufacture

Aug. to Sankheda Part-I RWSS Page No.- 71


Volume – III: Data Sheet GWSSB
2.
As Per
Applicable Standards
Specifications

3. Quantity Nos. As Per BOQ

4. Application / Designation Power Distribution


5.

System Voltage -Nominal -Highest Kv Kv 11 12

6.
Method of Connection HV Winding
Delta Star
LV Winding

7. Rated Frequency Hz 50
8.
Two Winding /
Type Of Winding / Material
Copper

9. 3 Phase / Single Phase Unit 3 Ph Unit

10. Rating Of Each Unit KVA As Per BOQ

11. Voltage Rating KV/ KV 11 / 0.433

12. Cooling ONAN

As Per IS 1180-2014
Percentage Impedance at Principal
13. % & Its latest
Tap & Without Negative Tolerance
amendment

14. Over fluxing Withstand Capability (110% Continuous)

15. Vector Group Dyn11

(Uniformly
16. Winding Insulation (HV & LV)
Insulated)

17. Short Circuit Current Ka 26.2

18. Maximum Duration Of Fault Sec. 1 Sec

19. Insulation Withstand Voltage


1 Min Power Frequency Withstand
a) Voltage (Dry & Wet) -HV (11 Kv)/ Kv 28/ 3
LV (0.433 Kv)

Lightning Impulse Withstand Kv


b) 75/ NA
Voltage -HV (11 Kv)/ LV (0.433 Kv) (Peak)

Aug. to Sankheda Part-I RWSS Page No.- 72


Volume – III: Data Sheet GWSSB

TEMPERATURE RISE (H Factor of


20. Max. 1.3 As Per IEC 60354 To Be
Considered)

a) Maximum Ambient Air 0c 50

b) Yearly Average Air (Minimum) 0c 32

Temperature Rise Of Top Oil By


c) 0c 50
Thermometer(Maximum)

Maximum Temperature Rise Of


d) 0c 55
Windings By Resistance (Maximum)

e) Hot Spot Temperature (Maximum) 0c 98

Loading Combination For Which


f) Above Temperature Rises Are
Applicable

21. Weights Bidder To Furnish

a) Core Winding Assembly Kg

b) Oil Kg

c) Tank, Coolers And Fittings Kg

d) Total Kg

e) Un-tanking Weight Kg

Minimum Clearance Height for


f) Lifting Core And Windings From Mm
Tank

22. Maximum Flux Density

a) At Rated Voltage Wb/M² 1.6

b) At 110% Rated Voltage Wb/M2 1.76

23. Current Density Bidder To Furnish

a) HV A/Cm2
b) LV A/Cm2
GUARANTEED LOAD LOSSES AT
Minimum 3 Star
RATED CURRENT AT 75ºc WINDING
Rated Transformer
24. TEMPERATURE (WITHOUT IS KW
As Per IS 1180-
POSITIVE TOLERANCE) i) 100%
2014
LOAD ii) 75% LOAD iii) 50% LOAD
Guaranteed No Load Losses (Core Minimum 3 Star
Loss And Dielectric Loss) At 100% Rated Transformer
25. Kw
Rated Voltage And Frequency As Per IS 1180-
(Without Is Positive Tolerance) 2014
Aug. to Sankheda Part-I RWSS Page No.- 73
Volume – III: Data Sheet GWSSB

Guaranteed No-Load Current: A.


When Excited From LV Side At
26. 100% Rated Voltage B When AA Bidder To Furnish
Excited From LV Side At 110%
Rated Voltage
Guaranteed Efficiency i) At 75 ºc
27. Bidder To Furnish
ii) At Unity P.F iii) At Full Load

Regulation: At Full Load, 0.8 P.F


28. % Bidder To Furnish
At 750 c Winding Temperature

29. Core:

a) Material of Core Lamination CRGO/ MOH

b) Insulation of Core Lamination Bidder To Furnish

30. Winding

a) Class of Insulation Bidder To Furnish

b) Material Copper

31. Tapping

a) Tapping On Winding HV/LV HV


OLTC / OCTC as
b) Whether On Load / Off-Circuit
per requirement
(-) 15% To (+) 5%
c) Tapping Range % for OLTC (-) 10%
To (+) 5% for OCTC
In Steps Of 1.25%
d) Tapping Step % for OLTC In Steps
Of 2.5% for OCTC
32. Parallel Operation No

33. Terminal Bushings HV / LV

a) Rated Voltage Class – KV 11/ 0.433

b) Rated Current Class – A Bidder To Specify

Impulse(1.2/ 50  Sec. Wave


c) Kvp 75
Withstand) –

One Minute Power Frequency Kv


d) 28
Withstand (Dry & Wet) (Rms)

Minimum Clearance In Air (Ph- mm/


e) 25
Ph/Ph-Gnd) Kv

Minimum Creepage Distance


f) Mm Bidder To Furnish
(Total)

Aug. to Sankheda Part-I RWSS Page No.- 74


Volume – III: Data Sheet GWSSB

g) Protected Creepage Distance Mm Bidder To Furnish

Reqd./
Voltage Tap For Use With
h) Not Bidder To Furnish
Potential Device
Reqd.
Reqd./
34. Bushing CT, If Required Not Not Required
Reqd.
a) BCT Core No.

b) CT Ratio

c) Class

d) VA Burden VA

e) Knee Point Voltage (vk) V


Magnetizing Current (Ie.) mA at
f) V
(vk /2)
g) Secondary Resistance (Rct) Ohms

Terminal Connections Rigid Bus/


ACSR Conductor / Air Insulated As Per System
35.
Cable Box With Disconnecting Requirement
Chamber/ Bus Duct

All The Accessories, Protections,


Equipments -Compliance With
36. Yes/ No
Specification, SLD & Data Sheet
Requirements.
No Of Units To Be Subjected To
37. Each Unit
Acceptance Tests

3.0 HT METAL ENCLOSED SWITCHGEAR


To be filled By
Sr. no Description Unit Particulars
Bidder
As per approved
1 Make
list
As per Tender
2 Applicable Standards
Specification
Overall dimensions of HT Metal
3 Enclosed Switchgear panel (Length mm Bidder to Furnish
x Depth x Height)
As per
Specification
4 Quantity Nos.
Requirement &
ref. SLD.
5 HT Switchgear and Bus bar Ratings

Aug. to Sankheda Part-I RWSS Page No.- 75


Volume – III: Data Sheet GWSSB
a) Rated voltage phase and
11KV, 3 Ph, 50 Hz
frequency
b)
System Neutral Earthing Effectively Earthed

c) Maximum system voltage KV 12


d) kV
1 Min Power Frequency Withstand
(rms) 1 28
Voltage
min
e) Lightning Impulse Withstand kV
75
Voltage (peak)
f) Short time (1 Sec.) at rated kA
26.2
voltage (rms)
g) Short time (3 Sec.) at rated kA
Bidder to Furnish
voltage (rms)
h) kA
Dynamic Rating 60
(peak
i) 50
Reference Ambient Temperature oC
j) Continuous current rating of Bus
Minimum as per
bars under site reference Ambient A
BOQ
Temperature
k) 90 deg. C for bus
bar having non
Maximum Temp. of Bus bar &
silver plated joints
Droppers / Connectors under oC
105 deg. C for bus
ambient condition
bar having silver
plated joints
l) Material of Bus bar Copper
m) Fully insulated
encapsulation by
Bus bar insulation heat shrinkable
colored PVC
sleeves and tapes.
6 Switchgear Constructional
Requirements
a) As per IS : 3427 IEC
Type of Construction
: 60265
b) Thickness of sheet steel (i) Frame,
Frame enclosures, doors, covers mm Bidder to Furnish
and partitions
c) Degree of protection IP 4X
d) Interior : Bidder to
Color finish shade
Furnish
Exterior : Bidder to
Furnish
e) Earthing Bus -Material -Size

Cu. / Al suitable
for Max.SC rating
for 1 sec)

Aug. to Sankheda Part-I RWSS Page No.- 76


Volume – III: Data Sheet GWSSB
f)
Earthing conductor (Main grid) --
GI suitable for
Material -Size
Max.SC rating for 1
sec)
g) Minimum clearances in air of live As per IS std. & to
parts suite BIL
h) Cable entry Bottom
7 Breaker Particulars -
a) Circuit Breaker Type - VCB
b) Volts,
Voltage, Frequency, & No. Of
Ph Hz 12kv, 3 Ph, 50 Hz
Phases
c) O-3 Min-Co-3 Min-
Rated Operating Duty -
Co
d) Rated Current At Reference Site - Minimum As Per
Ambient Temperature BOQ
Ka
Rated Breaking Current 28
(Rms)
e) Ka
Rated Making Current 75
(Peak)
f) Short Time Current Withstand For Ka
26.2
1 Sec. Duration. (Rms)
g) Asymmetrical Breaking Current
Ka
(A) Ac Component Bidder To Furnish
(Rms)
(B) D.C. Component Ka Bidder To Furnish
h) Cycles
Total Opening Time Bidder To Furnish
/ Msec
i) Cycles
Total Closing Time Bidder To Furnish
/ Msec
j) Motor Charged
Spring, Manual
Operating Mechanism, Type - Trip & Close
Facility Also To Be
Provided
k) 6 No. - 6 No. For
Minimum No. Of Auxiliary Contacts -
Purchaser’s Use
8 Auxiliary Control Voltage Bidder To Furnish
(A) For Closing/Tripping Coil Volts Ac Dc
(B) For Spring Charging Motors
Volts Ac Dc

(C) For Space Heaters & Lighting Volts Ac Dc


9 Breaker Application Bidder To Furnish
(A) Transformer Control Yes / No
(B) Motor Control Yes / No
(C) Furnace Control Yes / No
(D) Capacitor Control Yes / No
10 Vacuum Contactor - Bidder To Furnish
a) Application (Controlled Motor / Capacitor
-
Equipment)
b)
Max. System Voltage & Frequency V. Hz. 12kv, 3 Ph, 50 Hz

Aug. to Sankheda Part-I RWSS Page No.- 77


Volume – III: Data Sheet GWSSB
11 Mechanism
a) Spring Charging - Yes / No
b) Type - Ac / Dc / Universal
c) Rating Voltage V 11kv
d) Rating Kw Bidder To Furnish
11 Disconnectors
a) Transformer
Application (Controlled Eqpt.) -
Capacitor
b) On Load/ Off Load
Type - as per requirement

c) Rated Current At Referance Site Minimum As Per


-
Ambient Temperature BOQ
d) Rated Making & Breaking
A Bidder To Furnish
Capacitive Current
e) S.C. Withstand Currents 
Ka
A) Momentary 75
(Peak)
Ka
B) 1 Sec. Current 28
(Rms)
f) Operating Mechanism Closing &
Motorized Manual
Opening
g) Control Voltage Volts Ac Dc
h) Minimum No. Of Aux. Contacts  2 No. + 2 Nc.
i) HRC Fuses (Rating To Suit Required / Not
Application) Required
12 Current Transformer
a) Cast Resin Bar
Type
Primary
b) System Voltage & Frequency 11kv, 3 Ph, 50 Hz
c) Class Of Insulation Class-B Or Better
d) Rated Primary Current & Ratio Min. As Per SLD
e) For
Min. Cl 0.5/1.0/As
Accuracy Class & Burden Meteri
Per Dwgs.
ng
For Min. 5P10 /As Per
Prot. Dwgs.
f) Ka
Short Time 1 Sec. Current Rating & (Rms)
28 75
Dynamic Rating Ka
(Peak)
g) Core Balance CTs Shall Be Suitable
For Cable Sizes Of The Respective
- Bidder To Furnish
Feeders And Shall Be Complete
With Suitable Supports.
13 Voltage Transformers
a) Type  Cast Resin
b) Rated Voltage 11kv, 3 Ph, 50 Hz
c) Primary (P1) Volts Bidder To Furnish
d)
Volts Bidder To Furnish
Secondary (S1)
e)
Volts Bidder To Furnish
Secondary (S2)
f) Method Of Connection

Aug. to Sankheda Part-I RWSS Page No.- 78


Volume – III: Data Sheet GWSSB
g) Primary (P1) Star Earthed
h) Secondary (S1) Star Earthed
i) Open Delta Star
Secondary (S2) Earthed
j) Rated Voltage Factor 
k) Class – B Or Better
Class Of Insulation 
l) Provision Of PT & Alarm On
Yes / No
Eathing Trolley
14 H.V.Fuses
a) Rated Current A Bidder To Furnish
b) Voltage Class kV Bidder To Furnish
c) KA
Sym. Interrupting Rating 28
(Rms)
d)
Type Digital/ Analogue
e) Class 1 Or Better
Accuracy Class 
15 Relays
a) Electro Magnetic
Type  Solid State
Numerical
b) Other Specification 
16 List Of Essential Spares Bidder To Furnish
16.1 One Complete Pole Of Each
Breaker
A. Rating Set
A. Rating Set
A. Rating Set
16.2 Loose Breaker Complete With
Operating Mechanism And Truck
Mounted
A. Rating Set
A. Rating Set
A. Rating Set
A. Rating Set
16.3 Closing & Tripping Coils Set 
16.4 Spring Charging Mechanism Set
16.5 Spring Charging Motor Alone Set
16.6 Set Of Gaskets For All Ratings Set
16.7 Vacuum Contactors
One Complete Set Ea
Operation Coil Set Ea
16.8 Bus bar Support Insulators Set
16.9 Auxiliary Switch Assembly Ea
16.10 Limit Position Switch Ea
16.11 Local/Remote Selector Switch Ea
16.12 Breaker Control Switch Ea
16.13 Bus Seal Off Bushing Set
16.14 Protective Relays : 
Device No. Relay Function Set
49 Thermal Overload Set
50 S/C Phase Short Circuit Set
50 N Earth Short Circuit Set
Aug. to Sankheda Part-I RWSS Page No.- 79
Volume – III: Data Sheet GWSSB
51 Phase Overload Set
51 N Earth Overload Set
50 LR Locked Rotor Set
27 Under Voltage Set
64 Residual Current Set
86 Lockout (Master) Set
87 T Transformer Set
Differential
95 Fuse Failure Set
16.15 Aux.Relays Of All Config. Set
16.16 Timers Of All Ratings Set
16.17 Indicating Lamp -
Red, Yellow, Blue, Green, Amber Set
16.18 One No. Of Each
Cast Resin Current Transformer Set
Rating
16.19 One No. Of Each
Cast Resin Voltage Transformer Set
Rating
16.20 Instruments
Ammeter Set
Voltmeter Set
Wattmeter Set
Watt Hour Meter Set
16.21 Fuses
HRC HV For VT Ea
HRC LV Of Different Ratings Set
Notes : Apart From Above List Of Spares, Bidder To Indicate List Of Recommended
Spares For 5 Years Of Trouble Free Operation.

4.0 LT METAL ENCLOSED SWITCHGEARS

To be filled By
Sr. No Description Unit Particulars
Bidder
As per approved
1 Make
list
As per Tender
2 Applicable Standards
Specification
Overall dimensions of 415V Metal
3 Enclosed Switchgear panel (Length mm Bidder to Furnish
x Depth x Height)
As per
Specification
4 Quantity Nos
Requirement &
ref. SLD.
415 V Switchgear and Bus bar
5
Ratings
Rated voltage phase and
a) 415 V, 3 Ph 50 Hz
frequency

Aug. to Sankheda Part-I RWSS Page No.- 80


Volume – III: Data Sheet GWSSB
Metal Enclosed,
modular Type
Front operated
Type of Construction ACB-EDO
b) Draw out / Fixed
MCCB – Fixed Type
type, construction
as per Form 4 of IS
8623/ IEC 60439
c) Maximum system voltage V 415 +10%
One minute power frequency
d)
voltage
i) Power circuits V 2500
ii) Control circuits V 1500
iii) Aux. Circuits connected to Sec
V 1500
of CTS
i) Continuous current rating of Bus
Minimum as per
bars under site reference Ambient
e) A SLD & specification
Temperature and type ii) Bus Bar
Aluminum(Al)
Material
Fully insulated
encapsulation by
f) Bus bar insulation heat shrinkable
coloured PVC
sleeves and tapes.
g) Reference Ambient Temperature oC 50o C
Maximum Temperature of Bus 85o C for non
bars, Droppers and Contacts at silver plated joints
h) oC
Continuous current rating under 105o C silver
site ambient temperature plated joints
Short Circuit current withstand for Bidder to Furnish
kA
i) Busbars and droppers (i) Short based on Design
(rms)
time 1 sec requirements
Switchgear Constructional
6
Requirements
Single front type
a) Type of Construction as per Form 4 of IS
8623 / IEC 60439

CRCA Sheet – 2.0


Thickness of sheet steel (i) Frame, Partition – 1.6
b) Frame enclosures, doors, covers mm Load bearing
and partitions Members -2.5 mm
Gland Plate – 3 mm
IP 52 for Indoor IP
c) Degree of protection
55 for Outdoor
Interior : Glossy
d) Color finish shade
white
Exterior : Light
grey semi glossy
Shade 631 of IS-5
Al suitable for
e) Earthing Bus -Material -Size Max.SC rating for 1
sec)

Aug. to Sankheda Part-I RWSS Page No.- 81


Volume – III: Data Sheet GWSSB

GI suitable for
Earthing conductor (Main grid) -
f) Max.SC rating for 1
Material -Size
sec)

Minimum clearances in air of live As per IS std. & to


g) parts (i) Phase to Phase (ii) Phase Mm Mm suite BIL 25 mm 20
to Earth mm
h) Cable entry to cubicles Bottom
7 Instrumentation Transformers
a) Current transformer
As per approved
i) Make
make list
…/ 5A -As per
ii) Ratio
Requirements
iii) Burden VA 15 Minimum
iv) Accuracy Class ( Metering) 1.0
v) Accuracy Class ( Protection) 5P20
b) Voltage transformer
As per approved
i) Make
list
415/√3 / 110 √3 -
ii) Ratio As per
Requirements
iii) Burden VA 50 VA Minimum
iv) Accuracy Class ( Metering) 1.0
v) Accuracy Class ( Protection) 3P
Minimum
requirements as
per SLD, Design
Switchgear, Starters & Other
8 Criteria &
Components
Specification
requirements (Yes
/ No)

5.0 LT APFC PANEL

To be filled By
Sr. No Description Unit Particulars
Bidder
1 Capacitor Bank Panel Particulars
As per approved
a) Make
make list
As per Tender
b) Applicable Standards
Specification
c) Quantity As per BOQ
* Bidder to furnish
d) Rated Capacity KVAR as per design
requirement.
Capacitor losses (i) For complete Watts 0.5W/ kVAr 0.2W/
e)
bank (ii) For individual units Watts kVAr
f) Rated voltage V 415
g) Rated frequency and phases 50 Hz, 3 Phase
h) Ambient temperature oC 50

Aug. to Sankheda Part-I RWSS Page No.- 82


Volume – III: Data Sheet GWSSB
i) Cable gland required Yes
As per design
j) Size of cable
Requirements
k) Cable entry Bottom
2 Unit Capacitors
a) Rated voltage V 415V
Standard Rated Output per bank at 5 / 10 /15 / 25 /
b) KVAR
415V 50 / 100 KVAr
Maximum over voltage the unit
c) capacitor is capable of % As per IS 13585
withstanding continuously
d) Type Double Layer APP
3 Constructional Requirement
Overall dimensions of Capacitor
a) control panel (Length x Depth x Mm Pl. Furnish
Height)
Thickness of sheet steel i) Frame, CRCA -2.0
b) Frame enclosures, doors covers mm Partition-1.6 Gland
and partition plate -3
c) Degree of protection IP 4X
Interior : Glossy
d) Color finish shade
white
Exterior : Light
Grey Semi Glossy,
Shade 631 of IS:5
e) Earthing bus Material GI
* Bidder to furnish
mm x
Size as per design
mm
requirement.
Earthing
f) Material GI
conductor
* Bidder to furnish
mm x
Size as per design
mm
requirement.
4 Design Requirements
kV
a) Insulation level 2.5
(rms)
b) Capacitor bank connection Delta
Short circuit withstand for busbars kA
c) *
Short time (1 sec) (rms)
Automatic
switching
responsive to ower
d) Type of switching
factor through
power factor
sensing relay
e) Switching steps Min. 8 As Per
Requirements
f) Rating of contactor AC 6b Duty -To
suit KVAR unit
150%
* As Per
g) Incomer switch current rating of
Requirements
rated
h) Busbars All
Aug. to Sankheda Part-I RWSS Page No.- 83
Volume – III: Data Sheet GWSSB
6.0 POWER, CONTROL & INSTRUMENTATION CABLES
To be filled By
Sr. No. Description Unit Particulars
Bidder
11 kV (E), multi strand, Al, XLPE
insulated, inner & outer extruded As per IS 7098
1 LS
PVC sheathed, GI armoured power Part -II
cable (as required)
a) Make As per approved
As per Tender
b) Applicable Standards
Specification
1.1 kV, multi strand Cu/ Al, XLPE
insulated, inner & outer extruded
PVC sheathed, GI armoured
power/submersible cable ( Cu
conductor cable & GI round wire
armoring for sizes upto 6 sq mm & As per IS 7098-
2 LS
below, for balance all, above 6 sq. Part -I
mm conductor size-Al conductor &
GI flat strip armouring) (Cu
conductor, double PVC sheathed,
water tight, flexible cable for
submersible pump application)
As per approved
a) Make
list
As per Tender
b) Applicable Standards
Specification
1.1 kV, multi-strand Cu, XLPE
insulated, inner & outer extruded
3 LS As per IS 7098
PVC sheathed, GI armoured control
cables
As per approved
a) Make
list
As per Tender
b) Applicable Standards
Specification
c) GENERAL
Double
Type of Cable Gland (Suitable for
compression
Cable Size as per requirement)
brass type
Type of Cable Lugs (Suitable for
Cable Size & material or bimetallic Crimping type
-as per requirement)
All Cable accessories as per
specification requirements to be Yes/No
provided.

7.0 EARTHING AND LIGHTNING PROTECTION SYSTEM


Sr. No Description Unit Particulars To be filled By
Bidder
1 Main Earthing Grid To Suite as per
Maximum SC
Rating & Design

Aug. to Sankheda Part-I RWSS Page No.- 84


Volume – III: Data Sheet GWSSB
2 Conductor Leads To Equipment (Minimum 2
distinct earthing
leads for equip.
having > 125V & 1
earthing lead for
equip. with<125V)
3 Other Items
(a) Main lighting D.B, Control panels Mtr. GI, 25x6mm
and sub-lighting distribution boards

(b) Hand Rails Mtr. GI, 25x3


(c) Cable trays Mtr. GI, 25x3
(d) Tanks Mtr. GI, 25x3
(e) Junction boxes Mtr. GI wire, 8 SWG
(f) Lighting fixtures, single phase Mtr. GI wire, 12 SWG
receptacles, lighting conduits,
(g) Mtr. GI wire, 12 SWG
Push button stations, limit switches,
(h) Crane rail, Mtr. GI, 25x3 mm
(i) Street lighting, flood lighting poles Mtr. GI, 25x3mm
and junctions boxes,
(j) Metallic noncurrent carrying Mtr. GI, 25x3 mm
structures,
4 Lightning Conductors Mtr.
(a) Lightning protection down comers Mtr. GI, 25x6 mm
for building,
(b) Lightning protection horizontal roof Mtr. GI, 25x6 mm
conductor for building
5 Electrodes
(a) Pipe electrode Nos. -Heavy duty GI
pipe 4500 mm
long, 40NB
(Quantity to
achieve ≤ 1 Ohm
earth resistance
based on 50 ohm-
(b) Plate Electrode m or higher
resistivity on the
basis of actual
measurement
whichever is
higher) -Minimum
4 Nos. of 600mm x
600mm x 3.15 mm
for each
transformer -
Minimum 2 Nos.
300mm x 300mm
x 3.5 mm for each
11 kV DP Structure
6 Earthing Resistance to be achieved Ohm 1

Aug. to Sankheda Part-I RWSS Page No.- 85


Volume – III: Data Sheet GWSSB
8.0 LIGHTING & RECEPTACLE SYSTEM AND EQUIPMENT

Sr. No. Description Unit Particulars To be filled By


Bidder
1 System Particular
(a) Voltage
(i) 3 Phase, 4 wire 50 Hz system
 Rated V 415
 Maximum V 476
(ii) D.C. system
 Rated V 110
(b) One minute withstand voltage 2000 V AC.
(c) System short-circuit level
(i) At 415 V, A.C. kA 10
(rms)
(ii) At 110 V.D.C. kA 6
(D.C.)
(d) Reference ambient temperature 450 C

2 Distribution Board/Panels
(a) Make As per approved
list
(b) Applicable Standards As per Tender
Specification
(c) Main, floor mounted distribution
boards
(i) Main LDB (A.C.)
As per requirement
 Bus bars Al
 Bus bar current rating A As per requirement

 Incoming
As per requirement
 Outgoing As per requirement
(With Minimum 2
spare feeders)

 Cable entry Bottom


 Location Indoor
 Earthing terminals 50x8 mm GI flat
(ii) Emergency lighting panel
As per requirement
 Bus bar Copper
 Bus bar current rating A As per
Requirement
 Incoming and outgoing feeders As per
requirements
(With Minimum 2
spare feeders)
 Cable entry Bottom
 Location Indoor
 Earthing terminals 50x6 mm GI flat
(d) Sub DBs, wall/structure mounting
panels

Aug. to Sankheda Part-I RWSS Page No.- 86


Volume – III: Data Sheet GWSSB
i) SLDB for indoor area
As per requirement
 Bus bars Copper
 Bus bar current rating A
As per requirement
 Incoming and outgoing feeders 1 No. Incoming
TPN MCB * (
Minimum32A) with
ELCB As per
requirement
Outgoing 10/16A
MCB SPN and DP
ELCB per phase
with PPI (With
Minimum 2 spare
feeder circuits; a
single circuit
consists of SPN
MCBs for R,Y, B
phase )

 Cable entry Bottom/Top


 Location Indoor
ii) SLDB for outdoor area
As per requirement
 Bus bars Copper
 Bus bar current rating A
As per requirement
 Incoming 1No.-Incoming * A
TPN MCB
(Minimum32A) with
ELCB-with timer
(0-24 hours)
 Outgoing As per requirement
Outgoing 10/16 A
SPN MCB with
switch contactors.
(With Minimum 2
spare feeder
circuits; a single
circuit consists of
SPN MCBs for R,Y,
B phase )

 Cable entry Bottom/Top


 Location Indoor
(e) Paint Finish
i) Color shade Interior : Glossy
white
Exterior : Light
gray semi glossy
Shade 631 of I.S:5
ii) Epoxy paint required Yes.
(f) Earthing terminals suitable for
conductor

Aug. to Sankheda Part-I RWSS Page No.- 87


Volume – III: Data Sheet GWSSB
i) Size mm x 25x3 flat
mm
ii) Material G.I.
3 Receptacle Units
(a) Make
(b) Decorative (complete with
flush/surface mounted
boxes/cover plates etc.)
i) 3 pin 1-ph & N with switch and A 5/15 A, Indoor
plug tops Type
(c) Industrial (complete with surface
mounted, pre fabricated CRCA
boxes)
i) 3 Pin, 230V AC As per required
With ELCB(30mA) & plug A 15A, Indoor Type
ii) 5 pin, 3 Ph, 415V With ELCB(30mA) As per required
& plug With ELCB(30mA) & plug 63A, Outdoor type
AA 32A, Indoor type
4 Lighting Wires
(a) As per approved
Make 1100V, PVC insulated:
list
(b) Conductor Stranded Copper
(c) Size (Sizes mentioned are Core x Lighting 2x1Cx1.5
minimum & size to be decided on mm 2 mm 2 Receptacle /
circuit load & voltage drop Sockets Decorative
criteria) 2x1Cx1.5mm2
Industrial 1ph -
2x1Cx4 mm2 3ph –
4Cx 6 /16 mm 2

5 Conduits
(a) Make
(b) Material Galvanized steel
(c) Size mm 20
6 Street Light Poles And Flood Light
Poles
(a) Make As per Approved
list
(b) Street Light Pole
i) Enclosed dwg. No.: Ref. Typical
Drawing attached
with Specs.
ii) Total Height: m 8.5/10/12
iii) Quantity: Nos.
As per requirement
(c) Junction Box with Pole
i) Enclosed dwg. No.: Pl. furnish.
ii) No. of cable entries: Nos. Two
iii) Cable entry suitable for : 4C-10/16 mm2 Al.
Conductor, PVC
insulated,
armoured cable
iv) Earthing terminal suitable for 25x3 mm GS Flat

Aug. to Sankheda Part-I RWSS Page No.- 88


Volume – III: Data Sheet GWSSB
(d) Floodlight Light Pole
i) Total height Mtr. 8.5/10/12/High
Mast
ii) No. of floodlights to be fixed per No. Minimum One/as
pole required
iii) Painted Yes
iv) Earthing terminal suitable for mm x 25x3
mm
v) Quantity : Nos.
As per requirement
7 Luminaire (Lighting fixture LS As per
complete with prewired control specification
gear terminal block & suitable requirement
lamps)
8 Note
Supply of conduits, wires/cables, all fixing hardware, terminal connectors, cable
termination kits and associated accessories for -lighting, receptacles, earthing, cabling
& wiring works, required Civil works etc. shall be included in Contractor’s scope. All
ELCBs for lighting circuit shall be with 100mA sensitivity. All ELCBs for receptacle
circuit shall be with 30mA sensitivity.

9.0 MAINTENANCE FREE SEALED LEAD ACID / Ni-Cd BATTERY (As Applicable)
Sr. No. Description Unit Particulars To be filed by
Bidder
1 Application Control &
annunciation
2 Type of battery Maintenance free
sealed lead acid
3 Number of battery banks required No. * As per design
(for 110V DC) requirement.
4 Ambient conditions Min. Temp. -20 C

Max. Temp 50 C

5 D.C. system voltage V 110


6 Ampere hour capacity of battery Ah * As per BOQ &
at 27 Deg. C at 10 hour rate to design
give final cell voltage of 1.75 requirement.
volts/cell
7 Momentary load/duration A * A for one minute
8 Emergency load/duration A * A for two hours
9 Continuous load/duration A * A for ten hours
10 Cell voltage -initial/final V 1.14/1.42 V
11 Mounting arrangement Multi tier
12 Charging method proposed Float & Float cum
boost charging

Aug. to Sankheda Part-I RWSS Page No.- 89


Volume – III: Data Sheet GWSSB
10.0 BATTERY CHARGER AND D.C. DISTRIBUTION BOARD (As Applicable)
Sr. No. Description Unit Particulars To be filed by
Bidder
10.1 (a) General Number required (i)
(b) (c) Battery charger
(d) (e)
* As per design
Nos requirement.
(ii) D.C. Distribution board Nos * As per design
requirement.
DC System Voltage (Nominal) V 110
DC System Earthing Unearthed
Ambient Design Temperature Deg. C 50
Busbars - Copper
10.2 (a) DC Bus Load Total continuous DC
load
A
* As per design
requirement.
(b) Short time loads (Additional to
continuous loads) (i) DC
* As per design
lights/Facia lamps (ii) Starting
requirement. * As
current and duration of Largest
per design
Connected DC Motor
requirement.
AA
Secs
10.3 (a) Battery Details Float/Trickle
(b) (c) charging current of battery
mA
(d) (e) * As per design
requirement.
Boost Charging Current of Battery A * As per design
(Maximum) requirement.
Boost Charging Voltage of Battery V * As per design
(maximum) requirement.
Maximum Time for Boost charging hr * As per design
of Battery requirement.
Battery capacity & no. of cells Ah * As per design
requirement.
Nos. * As per design
requirement.
10.4 (a) AC System Data
Supply Voltage V 415
Phase 3
Frequency Hz 50

(i) Variation in supply Voltage %  10


(ii) Variation in supply frequency % 5
(b) (c) Short Circuit level kA 10
(d) Type of earthing Solid earthing
10.5 Performance
(a) DC voltage setting adjustment for 10% of nominal
float charger voltage

Aug. to Sankheda Part-I RWSS Page No.- 90


Volume – III: Data Sheet GWSSB
(b) Voltage stabilization for constant 1% of set D.C.
voltage regulator voltage, with AC
input variation and
DC load variation
from 0 to 100%
(c) Maximum permissible variation in  1%
DC voltage (no load to full load)
(d) D.C. voltage setting adjustment 70% to 100% of
for boost charging max. boost
charging voltage
(e) D.C. current adjustment for boost 30% to 100% of
Charging max. boost
charging current
(f) Current stabilization for constant  2%
current regulator for boost charger
(g) Minimum permissible power factor 0.8
to rated continuous load
(h) Permissible ripple content at rated 3% (maximum)
continuous load
10.6 Miscellaneous

(a) Cable entry Bottom


(b) Cable Sizes (i) Battery
sq.mm * As per design
requirement.
(ii) DC output sq.mm * As per design
requirement.
(iii) AC input sq.mm * As per design
requirement.
(c) Relay for auto changeover from Yes
Float to boost mode to be
provided (in case of float-cum-
boost charger)
(d) Constructional Features for
Battery Charger & D.C.
Distribution Board
(i) Thickness of sheet steel Frame,
Frame enclosures, doors, covers
and partition mm CRCA rolled 2.0
(ii) Degree of protection IP 42
(iii) Colour finish shade Interior : Glossy
white
Exterior : Light
Grey Semi Glossy
Shade 631 of IS 5
(iv) Earthing bus Material Copper
Size mm x 25 x 6
mm
(v) Earthing
Material GS
conductor
Size mm x 50x 6
mm

Aug. to Sankheda Part-I RWSS Page No.- 91


Volume – III: Data Sheet GWSSB

11.0 EQUIPMENTS / INSTRUMENTS DETAILS (As Applicable)

Sr. No. Description To Be Filled By Bidder


Location

1. Relay Make & Model No. Yes/ No

Instantaneous Over Current


& Earth Fault Protections
1.1
(50 & 50N) (Element Of
Numerical Relay)

IDMT Over Current & Earth


Fault Protections (51 &
1.2
51N) (Element Of Numerical
Relay)

Master Trip / Lock Out


1.3
Relay (86) (Separate Relay)

Stand By Earth Fault Relay


1.4
(51ns) (Separate Relay)

Under Voltage/ No Voltage


1.5 (27) & Over Voltage Relay
(59)

Trip Circuit Supervision


1.6
Relay (95)

Auxiliary Relay (Separate


Relays Based On
1.7
Requirements, With At
Least One Spare Element)

Automatic Voltage
1.8
Regulator (Separate Device)

Microprocessor Based
1.9
Battery Charger Controller

Motor Protection Relay (98)


(Comprehensive Motor
1.10
Protection Relay For Motor
Ratings Above 132kw)

Make & Model Rating / Yes /


2. Switchgear Application
No. Release Type No

Aug. to Sankheda Part-I RWSS Page No.- 92


Volume – III: Data Sheet GWSSB

As Per Approved
2.1 ACB Above 630A
Make List

As Per Approved
2.2 MCCB Up to 630 A Minimum As
Make List
Per BOQ &
Specification
As Per Approved
2.3 MCB Requirement
Make List
s

As Per Approved
2.3 Fuse
Make List

Application
Type -2 Co-
(Provide
Starters (Including All Ordination
Feeder
3. Components For Type-2 Co- Make (With MCCB) Yes
Range For
Ordination) Ensured –
Which It Is
Yes/No
Applicable
Up to 5.5
3.1 D.O.L. Yes
Kw
For 5.5 Kw
3.2 Star-Delta Yes
To 15 Kw As Per Approved
Make List
Auto Transformer Starter For 15 Kw
3.3 --
(ATS) To 75 Kw

Above 75 As Per Approved


3.4 SOFT STARTER (μp Based) Yes
Kw Make List

Make & Model


4. Meters Application Type Size
No.

4.1 Ammeter
Minimum As As Per Approved
Per SLD & Make List
4.2 Voltmeter
Specificatio
n
Requireme As Per Approved
4.3 MFM
nts Make List

TVM /Tariff Meter (As Per


4.4 (As Per GEB Requirements)
GEB Requirements)

Indication Lamp
5. Annunciators Quantity Make & Model No.
Type

5.1 8 Window

5.2 16 Window

Aug. to Sankheda Part-I RWSS Page No.- 93


Volume – III: Data Sheet GWSSB
Whether Detailed
Literature For All The
6. Above ( Item 1 To 5) Items
Enclosed With Tender ( Yes
/ No)

Signature of Contractor Executive Engineer

Aug. to Sankheda Part-I RWSS Page No.- 94

You might also like