The document lists 33 documents required for obtaining building permission and completion certificate from the municipal corporation. It divides the documents into 5 categories: (1) Formats to be prepared by the client and signed, (2) Documents to be provided by the client, (3) Documents to be prepared by the architect before submission, (4) Documents to be obtained by the architect after submission but before approval, and (5) Documents to be procured and submitted for obtaining completion certificate. The document provides a comprehensive list of all paperwork needed to navigate the municipal approval and completion process.
The document lists 33 documents required for obtaining building permission and completion certificate from the municipal corporation. It divides the documents into 5 categories: (1) Formats to be prepared by the client and signed, (2) Documents to be provided by the client, (3) Documents to be prepared by the architect before submission, (4) Documents to be obtained by the architect after submission but before approval, and (5) Documents to be procured and submitted for obtaining completion certificate. The document provides a comprehensive list of all paperwork needed to navigate the municipal approval and completion process.
The document lists 33 documents required for obtaining building permission and completion certificate from the municipal corporation. It divides the documents into 5 categories: (1) Formats to be prepared by the client and signed, (2) Documents to be provided by the client, (3) Documents to be prepared by the architect before submission, (4) Documents to be obtained by the architect after submission but before approval, and (5) Documents to be procured and submitted for obtaining completion certificate. The document provides a comprehensive list of all paperwork needed to navigate the municipal approval and completion process.
A) FORMATS TO BE GIVEN BY LIASONING ARCHITECT AND TO BE PREPARED AND SIGNED BY
CLIENTS
1. APPOINTMENT LETTER REGARDING APPOINTMENT OF ARCHITECT BY THE CLIENTS. 2. IDENTIFICATION ON RS. 100 STAMP PAPER AS PER SPECIMEN. 3. NOTICE UNDER SECTION 342 4. NOTICE UNDER SECTION 44/69 5. ANNEXURE – III APPLICANT'S INDEMNITY CUM UNDERTAKING FOR THE PROPOSAL 6. WORK START NOTICE 7. INDEMNITY BOND AS PRESCRIBED ON RS.200 STAMP PAPER
B) DOCUMENTS TO BE GIVEN BY CLIENTS WHICH ARE REQUIRED FOR SUBMISSION
8. PROOF OF OCCUPANCY SUCH AS LEAVE AND LICENSE AGREEMENT OR LEASE DEED ETC, LICENSOR’S / LESSOR’S OWNERSHIP DOCUMENTS SUCH AS SALE/ PURCHASE DEED (IF THE LICENSOR IS OTHER THAN DEVELOPER) 9. DEVELOPER’S / LANDLORD’S NOC, LICENSOR / LESSOR’S NOC FOR PROPOSED INTERNAL ALTERATION WORK. 10. LATEST PROPERTY TAX BILL & CORRESPONDING RECEIPT OF PAYMENT MADE TO CORPORATION, TAX CLEARANCE CERTIFICATE. 11. OCCUPATION CERTIFICATE & CORRESPONDING APPROVED FLOOR PLAN, BLOCK PLAN, LOCATION PLAN AND SECTION ETC. 12. FINAL FIRE NOC GIVEN FOR OCCUPATION. 13. FIRE NOC AND CORRESPONDING PLANS APPROVED BY CFO FOR LAST AMENDMENT TO THE BUILDING PLANS 14. AUTHORITY LETTER / BOARD RESOLUTION 15. DITIGAL SIGNATURE OF AUTHORIZED SIGNATORY 16. SITE PHOTOGRAPHS & VIDEOS (MINIMUM 4, LESS THAN 10 MB) 17. PROPOSED INTERIOR LAYOUT IN AUTO CAD. 18. FORM ‘B’ 19. COPY OF EARLIER PERMISSION AND COMPLETION FOR INTERIOR FIT OUT WORK.
C) DOCUMENTS TO BE PREPARED BY ARCHITECT BEFORE SUBMISSION.
20. APPLICATION FROM LISCENCE ARCHITECT TO EXECUTIVE ENGINEER BUILDING
PROPOSALS. (WS) OF MUNICIPAL CORPORATION OF GREATER BOMBAY. 21. ANNEXURE – I CHECKLIST FOR MISCELLANEOUS PROPOSAL 22. ANNEXURE – II LICENSED SURVEYOR’ CERTIFICATION 23. L.S. LETTER NO WORK CERTIFICATE 24. ZEROX COPY OF REGISTRATION WITH COUNCIL OF ARCHITECTS NEW DELHI / SURVEYOR’S LICENSE ISSUED BY M.C.G.M 25. PLAN SHOWING PROPOSED WORK. (MUNICIPAL DRAWING)
D) DOCUMENTS TO BE OBTAINED BY ARCHITECTS AFTER SUBMISSION OF PROPOSAL BUT
BEFORE APPROVAL.
26. SURVEY REMARKS
27. NO ACTION PENDING CERTIFICATE FROM THE ASST. ENGINEER BUILDING AND FACTORY OF THE CONCERNED MUNICIPAL WARD 28. STRUCTURAL STABILITY CERTIFICATE. 29. N.O.C.FROM CHIEF FIRE OFFICER.
E) DOCUMENTS TO BE PROCURED AND SUBMITTED FOR OBTAINING COMPLETION
CERTIFICATE
30. COMPLETION STRUCTURAL STABILITY CERTIFICATE.
31. COMPLETION CHIEF FIRE OFFICER’S NOC. FORM ‘A’ LIST OF FIRE FIGHTING EQUIPMENTS INSTALLED ON SITE FRD CERTIFICATE. TOUGHENED GLASS CERTIFICATE 32. N.O.C FROM M & E CONSULTANT 33. N.O.C FROM M & E CONSULTANT FOR COMPLETION HVAC LAYOUT FROM A.C. CONSULTANT DULY SIGNED & STAMPED HVAC CONSULTANTS REPORT DULY SUGNED & STAMPED. SITE VISIT