1 Overhead Transmission Line projects (Extra high voltage – high voltage) 35.25%
2 Underground Transmission Line projects (Extra high voltage) 35.3%
3 Underground Transmission Line projects (high voltage) 37.1%
4 Transmission Substation projects (high voltage – 132 kv) 25.6%
5 Transmission Substation projects (Extra high voltage – 380 kv) 15.65%
6 Distribution Network projects 36.5%
7 Combined Cycle Power Plant projects 17.2%
8 Gas Turbine Power Plant projects 17.9%